[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151109":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1151109,803,1,"单选题","阶段验收的主持单位是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目法人",false,{"key":16,"text":17,"correct":14},"B","项目法人或监理单位",{"key":19,"text":20,"correct":21},"C","竣工验收主持单位或其委托单位",true,{"key":23,"text":24,"correct":14},"D","监理单位","2020版教材P273 \u002F 2019版教材P275 详见阶段验收应由竣工验收主持单位或其委托的单位主持。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]