[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151108":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1151108,803,1,"单选题","泵站每台机组投入运行前，均应进行机组启动（阶段）验收，按照规定，可由项目法人主持的机组启动（阶段）验收有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","第一台次和第二台次",false,{"key":16,"text":17,"correct":14},"B","第一台次和最后一台次",{"key":19,"text":20,"correct":21},"C","除第一台次和最后一台次的其他台次",true,{"key":23,"text":24,"correct":14},"D","第一台次","2020版教材P275 \u002F 2019版教材P278 首（末）台机组启动验收应由竣工验收主持单位或其委托单位的机组启动验收委员会负责，中间机组启动验收应由项目法人组织的机组启动验收工作组负责。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]