[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151080":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1151080,803,1,"单选题","新标准将质量检验项目统一分为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","保证项目",false,{"key":16,"text":17,"correct":14},"B","基本项目",{"key":19,"text":20,"correct":21},"C","主控项目、一般项目",true,{"key":23,"text":24,"correct":14},"D","不允许偏差项目","2020版教材P257 \u002F 2019版教材P260 新标准将质量检验项目统一分为主控项目、一般项目。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]