[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151050":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1151050,803,1,"单选题","设计、运行等单位均应在分部分项工程验收签证上签字或签署意见，（ ）签署验收结论。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","项目法人",false,{"key":16,"text":17,"correct":18},"B","监理单位",true,{"key":20,"text":21,"correct":14},"C","质量监督单位",{"key":23,"text":24,"correct":14},"D","施工单位","2020版教材P246 \u002F 2019版教材P249 根据《水电建设工程质量管理暂行办法》（电水农[1997]220号），有关施工质量管理的内容中施工质量检查与工程验收。管理的主要内容分部分项工程验收签证，应在施工单位进行一次系统的整体检查验收的基础上，由监理单位组织进行联合检查验收。设计、运行等单位均应在分部分项工程验收签证上签字或签署意见，监理单位签署验收结论。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]