[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1151017":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1151017,803,1,"单选题","水行政主管部门或者其委托的安全生产监督机构应当自收到《水利工程建设安全生产管理规定》（水利部令第26号）第九条和第十一条规定的有关备案资料后（ ）日内，将有关备案资料抄送同级安全生产监督管理部门。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","15",false,{"key":16,"text":17,"correct":14},"B","10",{"key":19,"text":20,"correct":21},"C","20",true,{"key":23,"text":24,"correct":14},"D","30","2020版教材P231 \u002F 2019版教材P234 水行政主管部门或者其委托的安全生产监督机构应“当自收到《水利工程建设安全生产管理规定》（水利部令第26号）第9条和第11条规定的有关备案资料后20日内，将有关备案资料抄送同级安全生产监督管理部门。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]