[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150932":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150932,803,1,"单选题","某大型泵站施工需进行一段河流改道作为其引渠，其相关资料如表1F420040—1 所示，则最终发包人应向承包人支付的该段河流改道土方开挖的价款应为（）万元。 巢大型泵站施工资料 表1F420040-1",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","64",false,{"key":16,"text":17,"correct":14},"B","62",{"key":19,"text":20,"correct":14},"C","60",{"key":22,"text":23,"correct":24},"D","58",true,"2020版教材P201 \u002F 2019版教材P204 已标价工程量清单中的单价子目工程量为估算工程量，结算工程量是承包人实际完后的，并按合同约定的计量方法进行计量的工程量。因此，10×5.8=58万元。 @##",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]