[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150921":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1150921,803,1,"单选题","某大型水利水电工程施工合同签订后，根据承包人的申请，发包人向其提供了有关本工程的其他水文和地质勘探资料，但未列入合同文件，承包人使用上述资料引发的后果应由（ ）负责。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","发包人",false,{"key":16,"text":17,"correct":18},"B","承包人",true,{"key":20,"text":21,"correct":14},"C","监理人",{"key":23,"text":24,"correct":14},"D","上述资料的编写者","2020版教材P194 \u002F 2019版教材P197 发包人应将其持有的现场地质勘探资料、水文气象资料提供给承包人，并对其准确性负责；承包人应对其阅读发包人提供的有关资料后作出的解释和推断负责。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]