[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150915":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1150915,803,1,"单选题","根据《水利水电工程标准施工招标文件》，施工临时占地由（ ）提供。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","发包人",true,{"key":16,"text":17,"correct":18},"B","承包人",false,{"key":20,"text":21,"correct":18},"C","地方政府",{"key":23,"text":24,"correct":18},"D","另由合同约定","2020版教材P191 \u002F 2019版教材P194 3.施工场地包括永久占地和临时占地。发包人提供施工场地的要求如下：（1）发包人应在合同双方签订合同协议书后的14天内，将本合同工程的施X场地范围图提交给承包人。发包人提供的施工场地范围图应标明场地范围内永久占地与临时占地的范围和界限。（2）发包人提供的施工用地范围在专用合同条款中约定。（3）除专用合同条款另有约定外，发包人应按技术标准和要求（合同技术条款）的约定，向承包人提供施工场地内的工程地质图纸和报告，以及地下障碍物图纸等施工场地有关资料，并保证资料的真实、准确、完整。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]