[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150911":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150911,803,1,"单选题","投标人A参加某泵站的土建标投标，其已标价工程量清单中的一部分见下表。经评审投标人A实质上响应了招标文件的要求，但评委发现其投标报价中有计算性错误，而招标文件中对此未作规定，根据《工程建设项目施工招标投标办法》(国家八部委局第30号令)，投标人A的已标价工程量清单中的“土方开挖”、“钢筋”修正后的合价应分别为（）万元。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","8．95、345．5",false,{"key":16,"text":17,"correct":14},"B","8．65、345．5",{"key":19,"text":20,"correct":21},"C","8．65、34．55",true,{"key":23,"text":24,"correct":14},"D","8．95、34．55","2020版教材P185 \u002F 2019版教材P187 评标过程中，评标委员会可以书面形式要求投标人对所提交的投标文件进行书面澄清或说明，或者对细微偏差进行补正，投标人的书面澄清、说明和补正属于投标文件的组成部分。算术性错误是可以修正的。根据调整后的合价可知，土方开挖为10000×8.65=8.65万元，钢筋为1000×345.5=34.55万元。 @##",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]