[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150872":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150872,803,1,"单选题","下列不属于承包单位分包管理职责的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","审查分包单位资质",false,{"key":16,"text":17,"correct":14},"B","对分包单位的再次分包负责",{"key":19,"text":20,"correct":14},"C","管理分包工程进度和质量",{"key":22,"text":23,"correct":24},"D","协调项目法人与分包单位签订合同",true,"2020版教材P174 \u002F 2019版教材P176 《水利建没工程施工分包管理规定》对项目法人分包管理职责。水利水电工程承包单位分包管理职责。承包人和分包人应当依法签订分包合同，并履行合同约定的义务。分包合同必须遵循承包合同的各项原则，满足承包合同中技术、经济条款。承包人应在分包合同签订后7个工作日内，送发包人备案。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]