[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150838":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1150838,803,1,"单选题","经过批准的初步设计报告，进行一般非重大设计变更、生产性子项目之间的调整，需要有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","上级主管部门批准",true,{"key":16,"text":17,"correct":18},"B","原批准机关复审同意",false,{"key":20,"text":21,"correct":18},"C","县级以上人民政府同意",{"key":23,"text":24,"correct":18},"D","项目法人复审同意","2020版教材P147 \u002F 2019版教材P149 初步设计报告经批准后，主要内容得修改或变更的批准机关是谁 在工程项目建设标准和概算投资范围内，依据批准的初步设计原则，一般非重大设计变更、生产性子项目之间的调整，由主管部门批准。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]