[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150763":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150763,803,1,"单选题","疏浚工程中浅埂长度为（ ）时，应进行返工处理。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","≥1m",false,{"key":16,"text":17,"correct":14},"B","≥1.5m",{"key":19,"text":20,"correct":14},"C","≥2m",{"key":22,"text":23,"correct":24},"D","\u003C2.5m",true,"2020版教材P121 \u002F 2019版教材P123 疏浚工程原则上不允许欠挖，局部欠挖如超出下列规定时，应进行返工处理：浅埂长度小于2.5m。@##",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]