[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150762":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1150762,803,1,"单选题","疏浚工程的横断面中心线偏移应（ ）m。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","小于1.0",true,{"key":16,"text":17,"correct":18},"B","大于1.0",false,{"key":20,"text":21,"correct":18},"C","小于1.5",{"key":23,"text":24,"correct":18},"D","大于1.5","2020版教材P121 \u002F 2019版教材P123 疏浚工程应按下列规定进行质量控制：（1）断面中心线偏移不应大于1.0m。（2）应以横断面为主进行检验测量，必要时可进行纵断面测量。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]