[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150725":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1150725,803,1,"单选题","碾压混凝土坝施工中，压实质检至少每（ ）h一次。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":18},"B","2",true,{"key":20,"text":21,"correct":14},"C","3",{"key":23,"text":24,"correct":14},"D","4","2020版教材P116 \u002F 2019版教材P118 （6）每一碾压层至少在6个不同地点，每2h至少检测一次。压实密度可采用核子水分密度仪、谐波密实度计和加速度计等方法检测,目前较多采用挖坑填砂法和核子水分密度仪法进行检测。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]