[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150651":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1150651,803,1,"单选题","中型基坑初期排水，排水时间可采用()d。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","3～5",true,{"key":16,"text":17,"correct":18},"B","4～6",false,{"key":20,"text":21,"correct":18},"C","5～7",{"key":23,"text":24,"correct":18},"D","6～8","2020\u002F2019教材P58 排水时间的确定，应考虑基坑工期的紧迫程度、基坑水位允许下降的速度、各期抽水设备及相应用电负荷的均匀性等因素，进行比较后选定。一般情况下，大型基坑可采用 5-7 d ,中型基坑可采用3-5d。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]