[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150561":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1150561,803,1,"单选题","采用经纬仪代替水准仪进行土建工程放样时，放样点离高程控制点不得大于()m。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","50",true,{"key":16,"text":17,"correct":18},"B","100",false,{"key":20,"text":21,"correct":18},"C","150",{"key":23,"text":24,"correct":18},"D","200","2020\u002F2019教材P8 高程放样的方法的选择：主要根据放样点高程精度要求和现场的作业条件。可分别采用水准测量法、光电测距三角高程法、解析三角高程法和视距法等。. 采用经讳仪代替水准仪进行工程放样时，应注意以下两点： ( 1 ) 放样点离高程控制点不得大于50m。 ( 2 ) 必须用正倒镜置平法读数，并取正倒镜读数的平均值进行计算。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]