[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150544":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150544,803,1,"单选题","变形观测的基点，应尽量利用施工控制网中较为稳固可靠的控制点，也可建立独立的、相对的控制点，其精度应不低于()等网的标准。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","一",false,{"key":16,"text":17,"correct":14},"B","二",{"key":19,"text":20,"correct":14},"C","三",{"key":22,"text":23,"correct":24},"D","四",true,"2020\u002F2019教材P10 施工期间外部变形监测精度控制网的标准，属于记忆类题目，变形观测的基点，应尽量利用施工控制网中较为稳固可靠的控制点，也可建立独立的、相对的控制点，其精度应不低于四等网的标准。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]