[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150536":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150536,803,1,"单选题","水行政主管部门应当自受理水工程建设规划同意书申请之日起（ ）个工作日内作出决定。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","10",false,{"key":16,"text":17,"correct":14},"B","15",{"key":19,"text":20,"correct":21},"C","20",true,{"key":23,"text":24,"correct":14},"D","30","本题考查的是水资源规划及水工程建设许可的要求。水行政主管部门应当自受理水工程建设规划同意书申请之日起20个工作日内作出决定。20个工作日内不能作出决定的，经本机关负责人批准，可以延长10个工作日。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]