[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150513":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1150513,803,1,"单选题","根据《水利工程设计概估算编制规定（工程部分）》（水总[2014]429号文），下列属于基本直接费的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","人工费",true,{"key":16,"text":17,"correct":18},"B","冬雨期施工增加费",false,{"key":20,"text":21,"correct":18},"C","临时设施费",{"key":23,"text":24,"correct":18},"D","现场管理费","本题考查的是投标阶段成本管理。基本直接费包括人工费、材料费、施工机械使用费。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]