[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150510":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150510,803,1,"单选题","某水利工程使用的商品混凝土，投标人在投标报价文件中采用含税价格编制，调整为不含税价格的调整系数是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1.16",false,{"key":16,"text":17,"correct":14},"B","1.10",{"key":19,"text":20,"correct":21},"C","1.03",true,{"key":23,"text":24,"correct":14},"D","1.02","调整系数：主要材料：1.17；次要材料：1.03；砂石土料：1.02；商品混凝土：1.03。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]