[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150448":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1150448,803,1,"单选题","以下不能满足自愿申报文明工地情况的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开展文明工地创建活动已达一年",false,{"key":16,"text":17,"correct":18},"B","工程项目已完工程量达到全部建筑安装工程量的15%",true,{"key":20,"text":21,"correct":14},"C","主体工程完工9 个月",{"key":23,"text":24,"correct":14},"D","工程进度满足总体进度计划要求","自愿申报文明工地，申报条件包括：开展文明工地创建活动半年以上；工程项目已完成的工程量，应达全部建筑安装工程量的20%及以上，或在主体工程完工一年以内；工程进度满足总体进度计划要求。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]