[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150409":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1150409,803,1,"单选题","根据《水利建设工程施工分包管理规定》（水建管[2005]304号），除发包人依法指定分包外，承包人对其分包项目的实施以及分包人的行为向发包人负（ ）责任。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","全部",true,{"key":16,"text":17,"correct":18},"B","主要",false,{"key":20,"text":21,"correct":18},"C","次要",{"key":23,"text":24,"correct":18},"D","直接","本题考查的是水利水电工程承包单位分包管理职责。除发包人依法指定分包外，承包人对其分包项目的实施以及分包人的行为向发包人负全部责任。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]