[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150394":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150394,803,1,"单选题","事故处理需要进行设计变更的，需由（ ）提出设计变更方案",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目法人",false,{"key":16,"text":17,"correct":14},"B","有资质的设计单位",{"key":19,"text":20,"correct":14},"C","原设计单位",{"key":22,"text":23,"correct":24},"D","原设计单位或有资质的单位",true,"事故处理需要进行设计变更的，需原设计单位或有资质的单位提出设计变更方案。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]