[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150332":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150332,803,1,"单选题","在土方开挖过程中，两次独立测量同一区域的开挖工程量其差值小于（ ）%时，可取中数作为最后值。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","5",{"key":19,"text":20,"correct":21},"C","7",true,{"key":23,"text":24,"correct":14},"D","9","土方开挖过程中，两次独立测量同一区域的开挖工程量其差值小于5%（岩石）和7%（土方）时，可取中数作为最后值。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]