[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150247":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1150247,803,1,"单选题","以下关于土石坝坝面质量检查取样方法的说法中，错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","黏性土使用环刀法取样测定",false,{"key":16,"text":17,"correct":18},"B","砂使用灌水法取样测定",true,{"key":20,"text":21,"correct":14},"C","反滤料使用灌砂法取样测定",{"key":23,"text":24,"correct":14},"D","堆石料使用灌水法取样测定","砂应使用环刀法进行取样测定。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]