[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150184":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150184,803,1,"单选题","以下不属于基坑初期排水的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","围堰在设计水头的渗流量",false,{"key":16,"text":17,"correct":14},"B","覆盖层中的含水量",{"key":19,"text":20,"correct":14},"C","排水时降水量",{"key":22,"text":23,"correct":24},"D","施工弃水量",true,"1.初期排水总量：应按围堰闭气后的基坑积水量、抽水过程中围堰及地基渗水量、堰身及基坑覆盖层中的含水量，以及可能的降水量等组成计算。施工弃水量属于经常性排水。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]