[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150171":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150171,803,1,"单选题","（2018年真题）根据《水利建筑工程预算定额》，现浇混凝土定额中不包括（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","清仓",false,{"key":16,"text":17,"correct":14},"B","平仓振捣",{"key":19,"text":20,"correct":14},"C","铺水泥砂浆",{"key":22,"text":23,"correct":24},"D","模板制作",true,"本题考查的是水利水电工程定额。根据《水利建筑工程预算定额》，现浇混凝土定额不含模板制作、安装、拆除、修整。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]