[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150137":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1150137,803,1,"单选题","（2016年）根据《水利水电工程标准施工招标文件》（2009年版），在承包人索赔处理程序中，如承包人接受索赔处理结果，发包人最迟应在作出索赔处理结果答复后（）天内完成赔付。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","14",false,{"key":16,"text":17,"correct":18},"B","28",true,{"key":20,"text":21,"correct":14},"C","42",{"key":23,"text":24,"correct":14},"D","56","承包人接受索赔处理结果的，发包人应在作出索赔处理结果答复后28天内完成赔付。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]