[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150123":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150123,803,1,"单选题","（2017年）根据《水利部关于调整水利工程建设项目施工准备开工条件的通知》（水建管[2017]177号)，不属于施工准备条件的是（ )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","可行性研究报告已批准",false,{"key":16,"text":17,"correct":14},"B","环境影响评价文件已批准",{"key":19,"text":20,"correct":21},"C","办理施工报建",true,{"key":23,"text":24,"correct":14},"D","年度水利投资计划下达","水利工程建设项目施工准备开工的条件调整为：项目可行性研究报告已经批准，环境影响评价文件等已经批准，年度投资计划已下达或建设资金已落实，项目法人即可开展施工准备，开工建设。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]