[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150096":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150096,803,1,"单选题","（2012年）碾压混凝土坝的混凝土强度在施工过程中是以（ ）进行控制的。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","钻孔取芯",false,{"key":16,"text":17,"correct":14},"B","压水试验",{"key":19,"text":20,"correct":21},"C","监测密度",true,{"key":23,"text":24,"correct":14},"D","留置试块","碾压混凝土的强度在施工过程中是以监测密度进行控制的，并通过钻孔取芯样校核其强度是否满足设计要求。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]