[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150088":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1150088,803,1,"单选题","(2009年)混凝土重力坝浇筑块成型后的偏差，不应超模板安装允许偏差的（）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","20%～30%",false,{"key":16,"text":17,"correct":14},"B","30%～40%",{"key":19,"text":20,"correct":14},"C","40%～50%",{"key":22,"text":23,"correct":24},"D","50%～100%",true,"对于大体积混凝土浇筑块，成型后的偏差，不应超过模板安装允许偏差的50%～100%， 取值大小视结构物的重要性而定。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]