[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150058":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150058,803,1,"单选题","（2018年真题）采用钻孔法检查高喷墙的防渗性能时，钻孔检查宜在相应部位高喷灌浆结束（）后进行。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","7d",false,{"key":16,"text":17,"correct":14},"B","14d",{"key":19,"text":20,"correct":21},"C","28d",true,{"key":23,"text":24,"correct":14},"D","56d","本题考查的是高压喷射灌浆。围井检查宜在围井的高喷灌浆结束7d后进行，如需开挖或取样，宜在14d后进行；钻孔检查宜在该部位高喷灌浆结束28d后进行。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]