[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1150051":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1150051,803,1,"单选题","（2012年）帷幕灌浆施工完成后的质量检查应以检査（ ）为主。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","灌浆施工过程记录",false,{"key":16,"text":17,"correct":14},"B","灌浆结果标准",{"key":19,"text":20,"correct":21},"C","孔压水试验成果",true,{"key":23,"text":24,"correct":14},"D","孔岩芯获得率","帷幕灌浆质量检查应以检查孔压水试验成果为主，结合对竣工资料和测试成果的分析，综合评定。",{"id":6,"name":27,"category":28,"favorite":29},"一建水利水电工程实务","建筑工程",0]