[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":598},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,8,50,2019,[13,34,46,58,70,82,94,106,118,130,139,148,160,172,184,196,205,217,229,241,253,265,277,289,299,311,320,332,344,355,367,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,567,576,588],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1148291,1,"单选题","以下属于沥青混凝土路面特点的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","其破坏取决于极限垂直变形和弯拉强度",false,{"key":24,"text":25,"correct":22},"B","由于唧泥导致的板底脱空和错台是其典型病害",{"key":27,"text":28,"correct":29},"C","抗弯强度小，荷载作用下产生积累变形",true,{"key":31,"text":32,"correct":22},"D","在行车荷载的作用下，呈现较大的刚性，弯沉变形小","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1148292,"以下无机结合料中，可用于高等级路面基层的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"石灰稳定土",{"key":24,"text":41,"correct":29},"二灰稳定粒料",{"key":27,"text":43,"correct":22},"水泥稳定土",{"key":31,"text":45,"correct":22},"二灰稳定土",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1148293,"沥青路面使用指标中，关系到行车制动距离、降低事故频率的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"安全性",{"key":24,"text":53,"correct":22},"平整度",{"key":27,"text":55,"correct":22},"温度稳定性",{"key":31,"text":57,"correct":29},"抗滑能力",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1148294,"沥青路面结构中半刚性基层材料可选用（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"石灰粉煤灰稳定砂砾",{"key":24,"text":65,"correct":22},"级配碎石",{"key":27,"text":67,"correct":22},"级配砂砾",{"key":31,"text":69,"correct":22},"级配碎砾石",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1148295,"沥青混合料的结构形式中，内摩擦角φ较高，黏聚力c 也较高的混合料是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"AC",{"key":24,"text":77,"correct":22},"AM",{"key":27,"text":79,"correct":22},"OGFC",{"key":31,"text":81,"correct":29},"SMA",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1148296,"改性沥青混合料面层施工中，不应用于碾压的施工机械是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"振动压路机",{"key":24,"text":89,"correct":29},"轮胎压路机",{"key":27,"text":91,"correct":22},"双轮钢筒式压路机",{"key":31,"text":93,"correct":22},"三轮钢筒式压路机",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1148297,"关于石方路基的施工说法正确的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"修筑填石路基码砌边部要和石料填筑同步进行",{"key":24,"text":101,"correct":22},"要根据施工经验，确定松铺系数、压实机具组合、压实遍数等施工参数后进行施工",{"key":27,"text":103,"correct":22},"路基范围内构筑物四周沟槽宜回填级配碎石",{"key":31,"text":105,"correct":29},"填石路基顶面整平层材料可选用未筛分碎石和石屑，厚度一般为100-150mm",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1148298,"安全生产的因素中物的控制不包括（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"施工机具",{"key":24,"text":113,"correct":22},"材料",{"key":27,"text":115,"correct":22},"安全防护用品",{"key":31,"text":117,"correct":29},"温度",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},1148299,"工程竣工验收报告由（ ）编制。",[122,124,126,128],{"key":20,"text":123,"correct":22},"施工单位",{"key":24,"text":125,"correct":29},"建设单位",{"key":27,"text":127,"correct":22},"监理单位",{"key":31,"text":129,"correct":22},"质量监督站",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1148301,"质量评估报告由（ ）进行评估。",[134,135,136,138],{"key":20,"text":127,"correct":29},{"key":24,"text":125,"correct":22},{"key":27,"text":137,"correct":22},"建设行政主管部门",{"key":31,"text":129,"correct":22},{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":20,"analysis":33},1148302,"竣工验收前，（ ）应请当地城建档案管理机构对施工资料进行预验收。",[143,144,145,146],{"key":20,"text":125,"correct":29},{"key":24,"text":127,"correct":22},{"key":27,"text":123,"correct":22},{"key":31,"text":147,"correct":22},"设计单位",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":24,"analysis":33},1148303,"高处坠落是指作业人员从（ ）以上的高处发生坠落造成人身伤亡的事故。",[152,154,156,158],{"key":20,"text":153,"correct":22},"1m",{"key":24,"text":155,"correct":29},"2m",{"key":27,"text":157,"correct":22},"2.5m",{"key":31,"text":159,"correct":22},"3m",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},1148304,"下面不是市政公用工程施工特点的是（ ）。",[164,166,168,170],{"key":20,"text":165,"correct":22},"产品固定，人员流动",{"key":24,"text":167,"correct":22},"露天作业多，受作业环境影响大",{"key":27,"text":169,"correct":22},"施工场地限定，施工动态变化大",{"key":31,"text":171,"correct":29},"不安全因素不随工程进度变化而变化",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":24,"analysis":33},1148305,"混凝土桩制作时，加工成型的钢筋笼、钢筋网和钢筋骨架等应水平放置，码放层数不宜超过（ ）层。",[176,178,180,182],{"key":20,"text":177,"correct":22},"2",{"key":24,"text":179,"correct":29},"3",{"key":27,"text":181,"correct":22},"4",{"key":31,"text":183,"correct":22},"5",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":20,"analysis":33},1148306,"在开挖面土壤含水量高、铁路列车不允许限速的情况下，可采用（ ）。",[188,190,192,194],{"key":20,"text":189,"correct":29},"低高度施工便梁",{"key":24,"text":191,"correct":22},"横梁加盖",{"key":27,"text":193,"correct":22},"纵横梁加固",{"key":31,"text":195,"correct":22},"轨束梁",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":24,"analysis":33},1148307,"某工程合同价8000万元，应配备专职安全员不小于（ ）人。",[200,202,203,204],{"key":20,"text":201,"correct":22},"1",{"key":24,"text":177,"correct":29},{"key":27,"text":179,"correct":22},{"key":31,"text":181,"correct":22},{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":27,"analysis":33},1148308,"临时用电、起重机械和防护用品在使用前进行安全检查称为（ ）。",[209,211,213,215],{"key":20,"text":210,"correct":22},"检查制度",{"key":24,"text":212,"correct":22},"事故隐患排查治理制度",{"key":27,"text":214,"correct":29},"验收制度",{"key":31,"text":216,"correct":22},"奖罚制度",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},1148309,"风险等级较高，风险后果严重的安全风险评价等级为（ ）。",[221,223,225,227],{"key":20,"text":222,"correct":22},"1级",{"key":24,"text":224,"correct":29},"2级",{"key":27,"text":226,"correct":22},"3级",{"key":31,"text":228,"correct":22},"4级",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":20,"analysis":33},1148310,"发生概率区间P＝0.05，其风险事件发生概率描述和等级分别为（ ）。",[233,235,237,239],{"key":20,"text":234,"correct":29},"描述为可能，等级为2级",{"key":24,"text":236,"correct":22},"描述为非常可能，等级为1级",{"key":27,"text":238,"correct":22},"描述为偶尔，等级为2级",{"key":31,"text":240,"correct":22},"描述为偶尔，等级为3级",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":24,"analysis":33},1148311,"（ ）是各项安全制度中的最基本制度。",[245,247,249,251],{"key":20,"text":246,"correct":22},"安全教育培训",{"key":24,"text":248,"correct":29},"安全生产责任制",{"key":27,"text":250,"correct":22},"安全例会制",{"key":31,"text":252,"correct":22},"安全生产验收制度",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":20,"analysis":33},1148312,"由项目负责人每周组织专职安全员等对施工现场进行联合检查称为（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":29},"定期检查",{"key":24,"text":260,"correct":22},"日常性检查",{"key":27,"text":262,"correct":22},"专项检查",{"key":31,"text":264,"correct":22},"季节性检查",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":27,"analysis":33},1148313,"消毒室属于职业健康安全风险控制措施中的（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":22},"安全技术措施",{"key":24,"text":272,"correct":22},"工业卫生技术措施",{"key":27,"text":274,"correct":29},"辅助房屋及设施",{"key":31,"text":276,"correct":22},"安全宣传教育设施",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":31,"analysis":33},1148314,"隧道采用钻爆法施工时，必须事先编制爆破方案，（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":22},"报监理批准，并经城市主管部门同意后方可实施",{"key":24,"text":284,"correct":22},"报业主批准，并经城市主管部门同意后方可实施",{"key":27,"text":286,"correct":22},"报监理批准，并经公安部门同意后方可实施",{"key":31,"text":288,"correct":29},"报城市主管部门批准，并经公安部门同意后方可实施",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":27,"analysis":33},1148315,"单位工程完工后，（ ）组织进行竣工预验收。",[293,294,296,298],{"key":20,"text":123,"correct":22},{"key":24,"text":295,"correct":22},"业主代表",{"key":27,"text":297,"correct":29},"总监",{"key":31,"text":147,"correct":22},{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":20,"analysis":33},1148316,"城建档案应分专业按（ ）分类组卷。",[303,305,307,309],{"key":20,"text":304,"correct":29},"单位工程",{"key":24,"text":306,"correct":22},"分部工程",{"key":27,"text":308,"correct":22},"检验批",{"key":31,"text":310,"correct":22},"单项工程",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":31,"analysis":33},1148317,"悬索桥索夹安装前必须测定主缆的空缆线形，（ ）确认索夹位置。",[315,316,317,319],{"key":20,"text":127,"correct":22},{"key":24,"text":123,"correct":22},{"key":27,"text":318,"correct":22},"检测单位",{"key":31,"text":147,"correct":29},{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":27,"analysis":33},1148318,"下列污水处理构筑物中，需要同时满水试验和气密性试验的是（ ）",[324,326,328,330],{"key":20,"text":325,"correct":22},"浓缩池",{"key":24,"text":327,"correct":22},"调节池",{"key":27,"text":329,"correct":29},"消化池",{"key":31,"text":331,"correct":22},"曝气池",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":27,"analysis":33},1148319,"给水管道内外防腐技术要求不正确的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"水泥砂浆内防腐层成形后，应立即将管道封堵",{"key":24,"text":339,"correct":22},"矿渣水泥砂浆养护时间不少于14d",{"key":27,"text":341,"correct":29},"通水前打开封堵，干燥通风",{"key":31,"text":343,"correct":22},"终凝后潮湿养护",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},1148324,"（ ）是施工方案的核心，具有决定性作用。",[348,350,351,353],{"key":20,"text":349,"correct":29},"施工方法",{"key":24,"text":111,"correct":22},{"key":27,"text":352,"correct":22},"施工顺序",{"key":31,"text":354,"correct":22},"季节性措施",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":27,"analysis":33},1148325,"只适用于细粒土压实度检测的方法是（ ）。",[359,361,363,365],{"key":20,"text":360,"correct":22},"核子密度仪",{"key":24,"text":362,"correct":22},"灌砂法",{"key":27,"text":364,"correct":29},"环刀法",{"key":31,"text":366,"correct":22},"蜡封法",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":31,"analysis":33},1148326,"临时设施种类中，停车场、道路属于（ ）。",[371,373,375,377],{"key":20,"text":372,"correct":22},"办公设施",{"key":24,"text":374,"correct":22},"生活设施",{"key":27,"text":376,"correct":22},"生产设施",{"key":31,"text":378,"correct":29},"辅助设施",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":24,"analysis":33},1148328,"采用三阶段设计的，扩大初步设计阶段必须编制（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":22},"设计概算",{"key":24,"text":386,"correct":29},"修正概算",{"key":27,"text":388,"correct":22},"设计估算",{"key":31,"text":390,"correct":22},"施工图预算",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},1148329,"（ ）是项目管理的核心内容。",[395,397,399,401],{"key":20,"text":396,"correct":22},"质量管理",{"key":24,"text":398,"correct":22},"工期管理",{"key":27,"text":400,"correct":22},"安全管理",{"key":31,"text":402,"correct":29},"成本管理",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},1148330,"质量管理与控制持续改进中，实施纠正措施的结果应由（ ）验证并记录。",[407,409,411,413],{"key":20,"text":408,"correct":22},"质量负责人",{"key":24,"text":410,"correct":29},"项目技术负责人",{"key":27,"text":412,"correct":22},"项目负责人",{"key":31,"text":414,"correct":22},"生产负责人",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1148331,"下列说法中，不属于控制性进度计划内容的是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"年度和季度施工计划是总进度的重要节点目标",{"key":24,"text":422,"correct":22},"总工期跨越三个年度的进度计划",{"key":27,"text":424,"correct":22},"按年度计划编制季度施工计划",{"key":31,"text":426,"correct":29},"发现进度计划受到干扰时应及时采取调整措施",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":27,"analysis":33},1148332,"关于钻孔灌注桩垂直度控制错误的是（ ）。",[431,433,435,437],{"key":20,"text":432,"correct":22},"场地平整度差",{"key":24,"text":434,"correct":22},"钻杆弯曲、接头间隙大",{"key":27,"text":436,"correct":29},"遇软硬土层交界处钻压过低",{"key":31,"text":438,"correct":22},"钻头受力不均",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},1148333,"地铁车站主体结构防水施工中，（ ）处不须铺设附加层。",[443,445,447,449],{"key":20,"text":444,"correct":22},"阴阳角",{"key":24,"text":446,"correct":22},"变形缝",{"key":27,"text":448,"correct":22},"穿墙管",{"key":31,"text":450,"correct":29},"顶板中间",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":24,"analysis":33},1148334,"给排水构筑物设计措施不正确的是（ ）。",[455,457,459,461],{"key":20,"text":456,"correct":22},"增配构造钢筋，提高抗裂性能",{"key":24,"text":458,"correct":29},"构造钢筋采用大直径、小间距",{"key":27,"text":460,"correct":22},"避免结构应力集中",{"key":31,"text":462,"correct":22},"设置变形缝或结构单元",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":27,"analysis":33},1148335,"管内径大于800mm的柔性管道，回填施工中应在管内设（ ）支撑。",[467,469,471,473],{"key":20,"text":468,"correct":22},"横向支撑",{"key":24,"text":470,"correct":22},"十字支撑",{"key":27,"text":472,"correct":29},"竖向支撑",{"key":31,"text":474,"correct":22},"斜向支撑",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":20,"analysis":33},1148336,"管道保温材料进场，检测材料的（ ）应符合设计要求。",[479,481,483,485],{"key":20,"text":480,"correct":29},"导热系数",{"key":24,"text":482,"correct":22},"防腐层厚度",{"key":27,"text":484,"correct":22},"涂料厚度",{"key":31,"text":486,"correct":22},"电阻系数",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":31,"analysis":33},1148337,"关于柔性管道的沟槽回填质量控制，以下说法错误的是（ ）。",[491,493,495,497],{"key":20,"text":492,"correct":22},"回填前，检查管道有无损伤及变形，有损伤管道应修复或更换",{"key":24,"text":494,"correct":22},"管内径大于800mm的柔性管道，回填施工中应在管内设竖向支撑",{"key":27,"text":496,"correct":22},"管道回填时间宜在一昼夜中气温最低的时刻",{"key":31,"text":498,"correct":29},"沟槽从管底基础部位开始到管顶以上0.5m范围内，采用机械或人工回填",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":24,"analysis":33},1148339,"盾构钢筋混凝土管片不得有内外贯穿裂缝和宽度大于（ ）mm的裂缝及砼剥落现象。",[503,505,507,509],{"key":20,"text":504,"correct":22},"0.15",{"key":24,"text":506,"correct":29},"0.2",{"key":27,"text":508,"correct":22},"0.25",{"key":31,"text":510,"correct":22},"0.5",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},1148340,"滤池内滤料不包括（ ）。",[515,517,519,521],{"key":20,"text":516,"correct":22},"石英砂",{"key":24,"text":518,"correct":22},"无烟煤",{"key":27,"text":520,"correct":22},"碳颗粒",{"key":31,"text":522,"correct":29},"有烟煤",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":27,"analysis":33},1148343,"管沟内的管道保温应设有（ ）。",[527,529,531,533],{"key":20,"text":528,"correct":22},"保温层",{"key":24,"text":530,"correct":22},"隔热层",{"key":27,"text":532,"correct":29},"防潮层",{"key":31,"text":534,"correct":22},"保护层",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},1148344,"综合管廊电缆排管的连接错误的是（ ）。",[539,541,543,545],{"key":20,"text":540,"correct":29},"金属电缆应采用直接对焊",{"key":24,"text":542,"correct":22},"金属电缆应采用套管焊接方式",{"key":27,"text":544,"correct":22},"硬质塑料管在套接或套接时，插接面上应涂以胶合剂粘牢密封",{"key":31,"text":546,"correct":22},"水泥管宜采用套接方式连接",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":31,"analysis":33},1148345,"管道顶管质量控制表述错误的是（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"进入接收工作井的顶管机和管端下部应设枕垫",{"key":24,"text":554,"correct":22},"管道两端露在工作井中的长度不应小于0.5m，不得有接口",{"key":27,"text":556,"correct":22},"工作井中露出的砼管道端部应及时浇筑砼基础",{"key":31,"text":558,"correct":29},"拆除注浆管路后，将管道上的注浆孔可不处理",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":24,"analysis":33},1148347,"某市政线路管道工程工程合同价配备8000 万，至少配备几个专职安全生产管理人员（ ）。",[563,564,565,566],{"key":20,"text":201,"correct":22},{"key":24,"text":177,"correct":29},{"key":27,"text":179,"correct":22},{"key":31,"text":181,"correct":22},{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":20,"analysis":33},1148348,"工程竣工验收报告，由（ ）提交。",[571,572,573,574],{"key":20,"text":125,"correct":29},{"key":24,"text":127,"correct":22},{"key":27,"text":147,"correct":22},{"key":31,"text":575,"correct":22},"质量监督机构",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":20,"analysis":33},1148349,"下列关于柔性管道回填施工做法错误的是（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":29},"回填之前，现场需要做试验段，长度应为一个井段或不少于100m",{"key":24,"text":583,"correct":22},"管内径大于800mm 的柔性管道，回填施工中应在管内设竖向支撑",{"key":27,"text":585,"correct":22},"管道回填时间宜在一昼夜中气温最低时段，从管道两侧同时回填，同时夯实",{"key":31,"text":587,"correct":22},"管道半径以下回填时应采取防止管道上浮、位移的措施",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":31,"analysis":33},1148350,"用于评定沥青混凝土面层压实度的方法是（ ）。",[592,594,595,596],{"key":20,"text":593,"correct":22},"灌水法",{"key":24,"text":362,"correct":22},{"key":27,"text":364,"correct":22},{"key":31,"text":597,"correct":29},"钻芯法",[599,602,605,608,611,614],{"id":15,"name":600,"category":7,"favorite":601},"领导干部任职前廉政法规知识测试题",92,{"id":603,"name":604,"category":7,"favorite":15},595,"建筑结构与设备",{"id":606,"name":607,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":609,"name":610,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":612,"name":613,"category":7,"favorite":8},534,"BIM工程师",{"id":615,"name":613,"category":7,"favorite":8},535]