[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":592},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,5,50,2019,[13,34,46,58,67,77,86,98,110,122,130,142,154,166,177,189,201,211,223,235,247,259,269,281,289,301,313,325,337,349,361,373,385,393,405,417,429,440,452,464,474,486,498,510,520,532,544,556,568,580],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1148138,1,"单选题","（2018 年真题 广东）不得在高压线下施工作业，若附近有架空高压线时应有专人监护作业，当电压在1~10kV 时，应保证的安全施工距离是（ ）m。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","4",false,{"key":24,"text":25,"correct":26},"B","6",true,{"key":28,"text":29,"correct":22},"C","8",{"key":31,"text":32,"correct":22},"D","10","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1148139,"（2018 年真题）下列属于专项安全检查内容的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"临时用电检查",{"key":24,"text":41,"correct":22},"防汛检查",{"key":28,"text":43,"correct":22},"防风检查",{"key":31,"text":45,"correct":22},"每周检查",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1148140,"（2018 年真题）根据《建设工程文件归档规范》GB\u002FT50328-2014 的规定：停建、缓建工程的档案可暂由（ ）保管。",[50,52,54,56],{"key":20,"text":51,"correct":22},"监理单位",{"key":24,"text":53,"correct":26},"建设单位",{"key":28,"text":55,"correct":22},"施工单位",{"key":31,"text":57,"correct":22},"设计单位",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1148141,"（2013 年真题）组织单位工程竣工验收的是（ ）。",[62,63,64,65],{"key":20,"text":55,"correct":22},{"key":24,"text":51,"correct":22},{"key":28,"text":53,"correct":26},{"key":31,"text":66,"correct":22},"质量监督机构",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":31,"analysis":33},1148142,"（2017 年真题）市政工程竣工验收前,建设单位应请（ ）对施工资料进行预验收。",[71,72,74,75],{"key":20,"text":51,"correct":22},{"key":24,"text":73,"correct":22},"工程质量监督机构",{"key":28,"text":57,"correct":22},{"key":31,"text":76,"correct":26},"城建档案管理机构",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":24,"analysis":33},1148143,"（2010 年真题）《房屋建筑工程和市政基础设施工程竣工验收备案管理暂行办法》规定，工程竣工验收备案的工程质量评估报告应由（ ）提出。",[81,82,83,85],{"key":20,"text":55,"correct":22},{"key":24,"text":51,"correct":26},{"key":28,"text":84,"correct":22},"质量监督站",{"key":31,"text":53,"correct":22},{"id":87,"libraryId":5,"type":15,"typeLabel":16,"stem":88,"options":89,"answer":31,"analysis":33},1148144,"（2020年真题）为市政公用工程设施改扩建提供基础资料的是原设施的（）测量资料。",[90,92,94,96],{"key":20,"text":91,"correct":22},"施工中",{"key":24,"text":93,"correct":22},"施工前",{"key":28,"text":95,"correct":22},"勘察",{"key":31,"text":97,"correct":26},"竣工",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":28,"analysis":33},1148145,"（2018 年真题）施工成本管理的基本流程是（ ）。",[102,104,106,108],{"key":20,"text":103,"correct":22},"成本分析→成本核算→成本预测→成本计划→成本控制→成本考核",{"key":24,"text":105,"correct":22},"成本核算→成本预测→成本考核→成本分析→成本计划→成本控制",{"key":28,"text":107,"correct":26},"成本预测→成本计划→成本控制→成本核算→成本分析→成本考核",{"key":31,"text":109,"correct":22},"成本计划→成本控制→成本预测→成本核算→成本考核→成本分析",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":24,"analysis":33},1148146,"除设计有要求外，压力管道水压试验的管段长度不宜大于（ ）km。",[114,116,118,120],{"key":20,"text":115,"correct":22},"0.5",{"key":24,"text":117,"correct":26},"1",{"key":28,"text":119,"correct":22},"1.5",{"key":31,"text":121,"correct":22},"2",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":31,"analysis":33},1148147,"满水试验时水位上升速度不宜超过（ ）m\u002Fd。",[126,127,128,129],{"key":20,"text":115,"correct":22},{"key":24,"text":117,"correct":22},{"key":28,"text":119,"correct":22},{"key":31,"text":121,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1148148,"内径大于1000mm 的现浇钢筋混凝土管渠，预（自）应力混凝土管、预应力钢筒混凝土管试验管段注满水后浸泡时间应不少于（ ）h。",[134,136,138,140],{"key":20,"text":135,"correct":22},"24",{"key":24,"text":137,"correct":26},"48",{"key":28,"text":139,"correct":22},"72",{"key":31,"text":141,"correct":22},"12",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},1148149,"喷射混凝土应采用早强混凝土，要求初凝时间不得大于（ ）min，终凝时间不得大于（ ）min。",[146,148,150,152],{"key":20,"text":147,"correct":26},"5；10",{"key":24,"text":149,"correct":22},"5；8",{"key":28,"text":151,"correct":22},"3；10",{"key":31,"text":153,"correct":22},"3；8",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1148150,"破管外挤也称爆管法，下列不属于爆管法的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"气动爆管",{"key":24,"text":161,"correct":22},"液动爆管",{"key":28,"text":163,"correct":22},"切割爆管",{"key":31,"text":165,"correct":26},"爆破爆管",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1148151,"水位测针的读数精确度应达到（ ）mm。",[170,172,174,175],{"key":20,"text":171,"correct":26},"0.1",{"key":24,"text":173,"correct":22},"0.01",{"key":28,"text":117,"correct":22},{"key":31,"text":176,"correct":22},"0.001",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":28,"analysis":33},1148152,"下列哪个不是根据水质类型划分的污水的处理方法（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"物理处理法",{"key":24,"text":184,"correct":22},"生物处理法",{"key":28,"text":186,"correct":26},"自然沉淀法",{"key":31,"text":188,"correct":22},"化学处理法",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":31,"analysis":33},1148153,"现浇钢筋混凝土水池的防水层、水池外部防腐层施工以及池外回填土施工之前，应先做的是（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":22},"严密性试验",{"key":24,"text":196,"correct":22},"水池闭水试验",{"key":28,"text":198,"correct":22},"渗水试验",{"key":31,"text":200,"correct":26},"水池满水试验",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":28,"analysis":33},1148154,"因工程建设需要挖掘城市道路的，应持（ ）批准签发的文件到有关部门办理审批手续。",[205,206,207,209],{"key":20,"text":53,"correct":22},{"key":24,"text":51,"correct":22},{"key":28,"text":208,"correct":26},"城市规划部门",{"key":31,"text":210,"correct":22},"公安交通部门",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":31,"analysis":33},1148155,"在城市给水排水管道工程不开槽法施工方法中，浅埋暗挖法施工适用性强，其适用管径为（ ）mm。",[215,217,219,221],{"key":20,"text":216,"correct":22},"300—4000",{"key":24,"text":218,"correct":22},"200—1800",{"key":28,"text":220,"correct":22},"大于3000",{"key":31,"text":222,"correct":26},"大于1000",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":20,"analysis":33},1148156,"在移动模架，上浇筑预应力混凝土连续梁时，浇筑分段工作缝必须设在（ ）附近。",[227,229,231,233],{"key":20,"text":228,"correct":26},"弯矩零点",{"key":24,"text":230,"correct":22},"1\u002F4 最大弯矩点",{"key":28,"text":232,"correct":22},"1\u002F2 最大弯矩点",{"key":31,"text":234,"correct":22},"弯矩最大点",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":28,"analysis":33},1148157,"采用土袋围堰施工，堰顶的宽度可为1-2m。当采用机械挖掘时，应视机械的种类确定，但不宜小于（ ）m。",[239,241,243,245],{"key":20,"text":240,"correct":22},"2.0",{"key":24,"text":242,"correct":22},"2.5",{"key":28,"text":244,"correct":26},"3.0",{"key":31,"text":246,"correct":22},"3.5",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":31,"analysis":33},1148158,"城市轨道交通地面站台形式不包括（ ）。",[251,253,255,257],{"key":20,"text":252,"correct":22},"岛式站台",{"key":24,"text":254,"correct":22},"侧式站台",{"key":28,"text":256,"correct":22},"岛、侧混合式站台",{"key":31,"text":258,"correct":26},"中心站台",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},1148159,"钢管焊接人员间断焊接时间超过（ ）个月，再次上岗前应重新考试。",[263,265,266,268],{"key":20,"text":264,"correct":22},"3",{"key":24,"text":21,"correct":22},{"key":28,"text":267,"correct":22},"5",{"key":31,"text":25,"correct":26},{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1148160,"强度大、变位小，同时可兼作主体结构的一部分的深基坑围护结构是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"灌注桩",{"key":24,"text":276,"correct":26},"地下连续墙",{"key":28,"text":278,"correct":22},"墙板式桩",{"key":31,"text":280,"correct":22},"自立式水泥土挡墙",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1148161,"人工开挖沟槽的槽深超过（ ）m 时应该分层开挖。",[285,286,287,288],{"key":20,"text":21,"correct":22},{"key":24,"text":264,"correct":26},{"key":28,"text":121,"correct":22},{"key":31,"text":117,"correct":22},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":28,"analysis":33},1148162,"任何单位都必须经公安交通管理部门和（ ）的批准，才能按规定占用和挖掘城市道路。",[293,295,297,299],{"key":20,"text":294,"correct":22},"上级主管部门",{"key":24,"text":296,"correct":22},"当地建设管理部门",{"key":28,"text":298,"correct":26},"市政工程行政主管部门",{"key":31,"text":300,"correct":22},"市政道路养护部门",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":28,"analysis":33},1148163,"我国城市燃气管道按输气压力来分，次高压A 燃气管道压力为（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"0.4MPa\u003CP\u003CO.8MPa",{"key":24,"text":308,"correct":22},"0.8MPa\u003CP≤l.6MPa",{"key":28,"text":310,"correct":26},"1.6MPa\u003CP\u003C2.5MPa",{"key":31,"text":312,"correct":22},"2.5MPa\u003CP≤4.0MPa",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":28,"analysis":33},1148164,"张拉段无黏结预应力筋长度小于（ ）m 时宜采用一端张拉。",[317,319,321,323],{"key":20,"text":318,"correct":22},"15",{"key":24,"text":320,"correct":22},"2O",{"key":28,"text":322,"correct":26},"25",{"key":31,"text":324,"correct":22},"30",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":28,"analysis":33},1148165,"钻孔灌注桩基础成孔方式有泥浆护壁成孔、干作业成孔、护筒（沉管）灌注桩及爆破成孔。下列施工设备中，适用于淤泥、淤泥质土的是（ ）。",[329,331,333,335],{"key":20,"text":330,"correct":22},"冲抓钻",{"key":24,"text":332,"correct":22},"冲击钻",{"key":28,"text":334,"correct":26},"潜水钻",{"key":31,"text":336,"correct":22},"旋挖钻",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":24,"analysis":33},1148166,"超前小导管注浆施工应根据土质条件选择注浆法，以下关于选择注浆法说法正确的（ ）。",[341,343,345,347],{"key":20,"text":342,"correct":22},"在砂卵石地层中宜采用高压喷射注浆法",{"key":24,"text":344,"correct":26},"在黏土层中宜采用劈裂或电动硅化注浆法",{"key":28,"text":346,"correct":22},"在砂层中宜采用渗入注浆法",{"key":31,"text":348,"correct":22},"在淤泥质软土层中宜采用劈裂注浆法",{"id":350,"libraryId":5,"type":15,"typeLabel":16,"stem":351,"options":352,"answer":31,"analysis":33},1148167,"盾构法施工用于穿越地面障碍的给水排水主干管道工程，直径一般在（ ）mm 以上。",[353,355,357,359],{"key":20,"text":354,"correct":22},"6000",{"key":24,"text":356,"correct":22},"5000",{"key":28,"text":358,"correct":22},"4000",{"key":31,"text":360,"correct":26},"3000",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":24,"analysis":33},1148168,"燃气管道的阀门安装前应做（ ）试验，不渗漏为合格，不合格者不得安装。",[365,367,369,371],{"key":20,"text":366,"correct":22},"强度",{"key":24,"text":368,"correct":26},"严密性",{"key":28,"text":370,"correct":22},"材质",{"key":31,"text":372,"correct":22},"耐腐蚀",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":24,"analysis":33},1148169,"为提高对污染物的去除效果，改善和提高饮用水水质，除了常规处理工艺之外，还有预处理和深度处理工艺。下列属于深度处理技术的是（ ）。",[377,379,381,383],{"key":20,"text":378,"correct":22},"黏土吸附",{"key":24,"text":380,"correct":26},"吹脱法",{"key":28,"text":382,"correct":22},"生物膜法",{"key":31,"text":384,"correct":22},"高锰酸钾氧化",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":24,"analysis":33},1148170,"未按照批准的位置、面积、期限占用或者挖掘城市道路，由市政工程行政主管部门或者其他有关部门责令限期改正，可以处以（ ）万元以下的罚款。",[389,390,391,392],{"key":20,"text":117,"correct":22},{"key":24,"text":121,"correct":26},{"key":28,"text":264,"correct":22},{"key":31,"text":21,"correct":22},{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":28,"analysis":33},1148171,"无盖水池满水试验流程为（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"试验准备→水池内水位观测→水池注水→蒸发量测定→整理试验结论",{"key":24,"text":400,"correct":22},"试验准备→水池注水→蒸发量测定→水池内水位观测→整理试验结论",{"key":28,"text":402,"correct":26},"试验准备→水池注水→水池内水位观测→蒸发量测定→整理试验结论",{"key":31,"text":404,"correct":22},"试验准备→蒸发量测定→水池注水→整理试验结论→水池内水位观测",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":31,"analysis":33},1148172,"下列隧道施工方法中，当隧道穿过河底时不影响施工的是（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"新奥法",{"key":24,"text":412,"correct":22},"明挖法",{"key":28,"text":414,"correct":22},"浅埋暗挖法",{"key":31,"text":416,"correct":26},"盾构法",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":31,"analysis":33},1148173,"小导管注浆施工应根据土质条件选择注浆法，在淤泥质软土层中宜采用（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"渗入注浆法",{"key":24,"text":424,"correct":22},"劈裂注浆法",{"key":28,"text":426,"correct":22},"电动硅化注浆法",{"key":31,"text":428,"correct":26},"高压喷射注浆法",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1148174,"城市污水处理方法与工艺中，属于化学处理法的是（ ）。",[433,435,436,438],{"key":20,"text":434,"correct":26},"混凝法",{"key":24,"text":382,"correct":22},{"key":28,"text":437,"correct":22},"活性污泥法",{"key":31,"text":439,"correct":22},"筛滤截流法",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":20,"analysis":33},1148175,"（2017 年真题）关于聚乙烯燃气管道连接的说法,错误的是（ ）。",[444,446,448,450],{"key":20,"text":445,"correct":26},"不同标准尺寸比（SDR 值）的材料,应使用热熔连接",{"key":24,"text":447,"correct":22},"不同级别材料,必须使用电熔连接",{"key":28,"text":449,"correct":22},"施工前应对连接参数进行试验",{"key":31,"text":451,"correct":22},"在热熔连接组对前,应清除表皮的氧化层",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":31,"analysis":33},1148176,"（2012 年真题）下列污水处理构筑物中，需要进行严密性试验的是（ ）。",[456,458,460,462],{"key":20,"text":457,"correct":22},"浓缩池",{"key":24,"text":459,"correct":22},"调节池",{"key":28,"text":461,"correct":22},"曝气池",{"key":31,"text":463,"correct":26},"消化池",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":20,"analysis":33},1148177,"（2020年真题）下列水处理构筑物中，需要做气密性试验的是（）。",[468,469,471,472],{"key":20,"text":463,"correct":26},{"key":24,"text":470,"correct":22},"生物反应池",{"key":28,"text":461,"correct":22},{"key":31,"text":473,"correct":22},"沉淀池",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":33},1148178,"桥梁防水卷材施工表述错误的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"卷材防水层铺设前应先做好节点、转角、排水口等部位的局部处理",{"key":24,"text":481,"correct":22},"环境气温和卷材的温度应高于5℃",{"key":28,"text":483,"correct":26},"铺设卷材时，卷材的展开方向应与车辆的运行方向垂直",{"key":31,"text":485,"correct":22},"卷材应采用沿桥梁纵、横坡从低处向高处的铺设方法",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":24,"analysis":33},1148179,"单孔跨径为100m的桥梁为（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"特大桥",{"key":24,"text":493,"correct":26},"大桥",{"key":28,"text":495,"correct":22},"中桥",{"key":31,"text":497,"correct":22},"小桥",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},1148180,"（ ）桥是唯一在竖向荷载下无水平反力的结构。",[502,504,506,508],{"key":20,"text":503,"correct":26},"梁式",{"key":24,"text":505,"correct":22},"拱式",{"key":28,"text":507,"correct":22},"刚架",{"key":31,"text":509,"correct":22},"悬吊",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1148181,"某批桥梁锚具共80套，外观检查时应至少抽查（ ）套。",[514,515,517,518],{"key":20,"text":29,"correct":22},{"key":24,"text":516,"correct":22},"9",{"key":28,"text":32,"correct":26},{"key":31,"text":519,"correct":22},"11",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},1148182,"下列关于沉入桩施工的说法中错误的是（ ）。",[524,526,528,530],{"key":20,"text":525,"correct":22},"先深后浅",{"key":24,"text":527,"correct":22},"先大后小",{"key":28,"text":529,"correct":22},"由中间向两端或向四周施打",{"key":31,"text":531,"correct":26},"先短后长",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},1148183,"下面关于管涵施工技术要点错误的是（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"当管涵设计为砼或砌体基础时，基础上面应设砼管座，其顶部弧形面与管身紧密贴合",{"key":24,"text":539,"correct":22},"当管涵为砼基础，管体直接设置在天然地基上时，应做成与管身弧度密贴的弧形管座。",{"key":28,"text":541,"correct":26},"管涵的沉降缝不得设在管节接缝处",{"key":31,"text":543,"correct":22},"管涵进出水口沟床应整理直顺",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},1148184,"桥梁扩建加宽，新旧桥梁采用上部结构连接而下部结构分离方式时，下列说法错误的是（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"钢筋混凝土实心板桥，新旧梁板之间拼接宜采用刚性连接",{"key":24,"text":551,"correct":22},"钢筋混凝土空心板桥，新旧梁板之间拼接宜采用铰接连接",{"key":28,"text":553,"correct":22},"预应力混凝土T梁，新旧T梁之间拼接宜采用刚性连接",{"key":31,"text":555,"correct":22},"连续箱梁桥，新旧箱梁之间拼接宜采用铰接连接",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},1148185,"钢管混凝土拱桥施工中，分段现浇混凝土拱圈，间隔槽混凝土应待拱圈分段浇筑后，其强度达到（ ）设计强度，接合面按施工处理后，由拱脚向拱顶对称进行浇筑。",[560,562,564,566],{"key":20,"text":561,"correct":22},"50%",{"key":24,"text":563,"correct":22},"60%",{"key":28,"text":565,"correct":22},"70%",{"key":31,"text":567,"correct":26},"75%",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":31,"analysis":33},1148186,"斜拉桥主梁施工方法中，（ ）是斜拉桥主梁施工最常用的方法。",[572,574,576,578],{"key":20,"text":573,"correct":22},"顶推法",{"key":24,"text":575,"correct":22},"平转法",{"key":28,"text":577,"correct":22},"支架法",{"key":31,"text":579,"correct":26},"悬臂浇筑法",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":31,"analysis":33},1148187,"下面关于箱涵顶进工艺流程正确的是（ ）。",[584,586,588,590],{"key":20,"text":585,"correct":22},"工作坑开挖→工程降水→后背制作→滑板制作→铺设润滑隔离层→箱涵制作",{"key":24,"text":587,"correct":22},"工程降水→后背制作→工作坑开挖→滑板制作→铺设润滑隔离层→箱涵制作",{"key":28,"text":589,"correct":22},"工程降水→工作坑开挖→后背制作→铺设润滑隔离层→滑板制作→箱涵制作",{"key":31,"text":591,"correct":26},"工程降水→工作坑开挖→后背制作→滑板制作→铺设润滑隔离层→箱涵制作",[593,596,599,602,605,608],{"id":15,"name":594,"category":7,"favorite":595},"领导干部任职前廉政法规知识测试题",92,{"id":597,"name":598,"category":7,"favorite":15},595,"建筑结构与设备",{"id":600,"name":601,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":603,"name":604,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":606,"name":607,"category":7,"favorite":8},534,"BIM工程师",{"id":609,"name":607,"category":7,"favorite":8},535]