[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,4,50,2019,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,212,224,236,248,260,272,284,296,308,320,332,343,354,366,378,390,402,414,426,438,450,458,470,482,494,506,516,528,540,552,564,576,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1148087,1,"单选题","（2018 年真题）下列施工中，不适用于综合管廊的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","夯管法",true,{"key":24,"text":25,"correct":26},"B","盖挖法",false,{"key":28,"text":29,"correct":26},"C","盾构法",{"key":31,"text":32,"correct":26},"D","明挖法","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1148088,"（2018 年真题）关于GCL 垫质量控制要点，说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"釆用顺坡搭接，即采用上压下的搭接方式",{"key":24,"text":41,"correct":22},"应避免出现品形分布，尽量采用十字搭接",{"key":28,"text":43,"correct":26},"遇有雨雪天气应停止施工",{"key":31,"text":45,"correct":26},"摊铺时应拉平GCL 垫，确保无褶皱、无悬空现象",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1148089,"（2012 年真题）GCL 主要用于密封和（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"防渗",{"key":24,"text":53,"correct":26},"干燥",{"key":28,"text":55,"correct":26},"粘接",{"key":31,"text":57,"correct":26},"缝合",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1148090,"（2019 年真题）关于泥质防水层质量控制的说法，正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"含水量最大偏差不宜超过8%",{"key":24,"text":65,"correct":26},"全部采用砂性土压实做填埋层的防渗层",{"key":28,"text":67,"correct":26},"施工企业必须持有道路工程施工的相关资质",{"key":31,"text":69,"correct":22},"振动压路机碾压控制在4-6 遍",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1148091,"（2010 年真题）垃圾填埋场进行泥质防水层施工，质量检验项目包括渗水试验和（ ）检测。",[74,76,78,80],{"key":20,"text":75,"correct":26},"平整度",{"key":24,"text":77,"correct":26},"厚度",{"key":28,"text":79,"correct":22},"压实度",{"key":31,"text":81,"correct":26},"坡度",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1148092,"（2017 年真题）生活垃圾填埋场填埋区防渗系统结构层,自上而下材料排序,正确的是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"土工布、GCL 热,HDPE 膜",{"key":24,"text":89,"correct":22},"土工布、HDPE 膜、GCL 垫",{"key":28,"text":91,"correct":26},"HDPE 膜、土工布、GCL 垫",{"key":31,"text":93,"correct":26},"HDPE 膜、GCL 垫、土工布",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},1148093,"（2016 年真题）生活垃圾填埋场一般应选在（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"直接与航道相通的地区",{"key":24,"text":101,"correct":26},"石灰坑及熔岩区",{"key":28,"text":103,"correct":26},"当地夏季主导风向的上风向",{"key":31,"text":105,"correct":22},"远离水源和居民区的荒地",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1148094,"（2011 年真题）垃圾场设城市所在地区的（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"夏季主导风向下风向",{"key":24,"text":113,"correct":26},"春季主导风向下风向",{"key":28,"text":115,"correct":26},"夏季主导风向上风向",{"key":31,"text":117,"correct":26},"春季主导风向上风向",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1148095,"（2018 年真题 广东海南）HDPE 膜焊缝非破坏性检测的传统老方法是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"真空检测",{"key":24,"text":125,"correct":26},"气压检测",{"key":28,"text":127,"correct":26},"水压检测",{"key":31,"text":129,"correct":26},"电火花检测",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1148096,"（2013 年真题）垃圾填埋场泥质防水层施工技术的核心是掺加（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"石灰",{"key":24,"text":137,"correct":22},"膨润土",{"key":28,"text":139,"correct":26},"淤泥质土",{"key":31,"text":141,"correct":26},"粉煤灰",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1148097,"（2020年真题）渗沥液收集导排系统施工控制要点中，导排层所用卵石的（）含量必须小于10%。",[146,148,150,152],{"key":20,"text":147,"correct":26},"碳酸钠（Na2CO3）",{"key":24,"text":149,"correct":26},"氧化镁（MgO）",{"key":28,"text":151,"correct":22},"碳酸钙（CaCO3）",{"key":31,"text":153,"correct":26},"氧化硅（SiO2）",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1148098,"（2019 年真题）施工测量是一项琐碎而细致的工作，作业人员应遵循（ ）的原则开展测量工作。",[158,160,162,164],{"key":20,"text":159,"correct":26},"“由局部到整体，先细部后控制”",{"key":24,"text":161,"correct":26},"“由局部到整体，先控制后细部”",{"key":28,"text":163,"correct":22},"“由整体到局部，先控制后细部”",{"key":31,"text":165,"correct":26},"“由整体到局部，先细部后控制”",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},1148099,"（2018 年真题）采用水准仪测量工作井高程时，测定高程为3.460m，后视读数为1.360m，已知前视测点高程为3.580m，前视读数应为（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"0.960m",{"key":24,"text":173,"correct":26},"1.120m",{"key":28,"text":175,"correct":22},"1.240m",{"key":31,"text":177,"correct":26},"2.000m",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},1148100,"（2017 年真题）关于施工测量的说法,错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":26},"规划批复和设计文件是施工测量的依据",{"key":24,"text":185,"correct":26},"施工测量贯穿于工程实施的全过程",{"key":28,"text":187,"correct":22},"施工测量应遵循“由局部到整体,先细部后控制”的原则",{"key":31,"text":189,"correct":26},"综合性工程使用不同的设计文件时,应进行平面控制网联测",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1148101,"（2015 年真题）施工平面控制网测量时，用于水平角度测量的仪器为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"水准仪",{"key":24,"text":197,"correct":22},"全站仪",{"key":28,"text":199,"correct":26},"激光准直仪",{"key":31,"text":201,"correct":26},"激光测距仪",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},1148102,"（2016 年真题）不能进行角度测量的仪器是（ ）",[206,207,209,210],{"key":20,"text":197,"correct":26},{"key":24,"text":208,"correct":26},"准直仪",{"key":28,"text":195,"correct":22},{"key":31,"text":211,"correct":26},"GPS",{"id":213,"libraryId":5,"type":15,"typeLabel":16,"stem":214,"options":215,"answer":31,"analysis":33},1148103,"（2018 年真题 广东海南）测量工作中，现测记录的原始数据有误，一般采取（ ）方法修正。",[216,218,220,222],{"key":20,"text":217,"correct":26},"擦改",{"key":24,"text":219,"correct":26},"涂改",{"key":28,"text":221,"correct":26},"转抄",{"key":31,"text":223,"correct":22},"划线改正",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":20,"analysis":33},1148104,"（2014 年真题）市政公用工程施工中，每一个单位（子单位）工程完成后，应进行（ ）测量。",[228,230,232,234],{"key":20,"text":229,"correct":22},"竣工",{"key":24,"text":231,"correct":26},"复核",{"key":28,"text":233,"correct":26},"校核",{"key":31,"text":235,"correct":26},"放灰线",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":28,"analysis":33},1148105,"（2018 年真题 广东海南）基坑工程施工后，受委托的第三方应编制监控量测方案，需经（ ）认可方才有效。",[240,242,244,246],{"key":20,"text":241,"correct":26},"建设单位、施工单位、监理单位",{"key":24,"text":243,"correct":26},"建设单位、设计单位、施工单位",{"key":28,"text":245,"correct":22},"建设单位、设计单位，监理单位",{"key":31,"text":247,"correct":26},"设计单位、施工单位、监理单位",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":28,"analysis":33},1148107,"（2012 年真题）最常用的投标技巧是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":26},"报价法",{"key":24,"text":255,"correct":26},"突然降价法",{"key":28,"text":257,"correct":22},"不平衡报价法",{"key":31,"text":259,"correct":26},"先亏后盈法",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":20,"analysis":33},1148108,"（2012 年真题 广东海南）投标保证金属于投标文件组成中的（ ）内容。",[264,266,268,270],{"key":20,"text":265,"correct":22},"商务部分",{"key":24,"text":267,"correct":26},"经济部分",{"key":28,"text":269,"correct":26},"技术部分",{"key":31,"text":271,"correct":26},"其他部分",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},1148109,"（2020年真题）下列投标文件内容中，属于经济部分的是（）。",[276,278,280,282],{"key":20,"text":277,"correct":26},"投标保证金",{"key":24,"text":279,"correct":22},"投标报价",{"key":28,"text":281,"correct":26},"投标函",{"key":31,"text":283,"correct":26},"施工方案",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":20,"analysis":33},1148110,"（2010 年真题）根据《建设工程清单计价规范》，分部分项工程量清单综合单价由（ ）组成。",[288,290,292,294],{"key":20,"text":289,"correct":22},"人工费、材料费、机械费、管理费、利润",{"key":24,"text":291,"correct":26},"直接费、间接费、措施费、管理费、利润",{"key":28,"text":293,"correct":26},"直接费、间接费、规费、管理费、利润",{"key":31,"text":295,"correct":26},"直接费、安全文明施工费、规费、管理费、利润",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":28,"analysis":33},1148111,"（2015 年真题）根据《建筑工程工程测量清单计价桂发》（GB0500-2013），下列措施项目费用中不能作为竞争性费用的是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":26},"脚手架工程费",{"key":24,"text":303,"correct":26},"夜间施工增加费",{"key":28,"text":305,"correct":22},"安全文明施工费",{"key":31,"text":307,"correct":26},"冬、雨期施工增加费",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":28,"analysis":33},1148112,"（2013 年真题）由于不可抗力事件导致的费用中，属于承包人承担的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":26},"工程本身的损害",{"key":24,"text":315,"correct":26},"施工现场用于施工的材料损失",{"key":28,"text":317,"correct":22},"承包人施工机械设备的损坏",{"key":31,"text":319,"correct":26},"工程所需清理、修复费用",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":28,"analysis":33},1148113,"（2020年真题）在施工合同常见的风险种类与识别中，水电、建材不能正常供应属于（）。",[324,326,328,330],{"key":20,"text":325,"correct":26},"工程项目的经济风险",{"key":24,"text":327,"correct":26},"业主资格风险",{"key":28,"text":329,"correct":22},"外界环境风险",{"key":31,"text":331,"correct":26},"隐含的风险条款",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":31,"analysis":33},1148114,"（2019 年真题）施工组织设计的核心部分是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":26},"管理体系",{"key":24,"text":339,"correct":26},"质量、安全保证计划",{"key":28,"text":341,"correct":26},"技术规范及检验标准",{"key":31,"text":283,"correct":22},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},1148115,"（2013 年真题）不属于施工组织设计内容的是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"施工成本计划",{"key":24,"text":350,"correct":26},"施工部署",{"key":28,"text":352,"correct":26},"质量保证措施",{"key":31,"text":283,"correct":26},{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1148116,"（2019 年真题）在施工现场入口处设置的戴安全帽的标志，属于（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":26},"警告标志",{"key":24,"text":361,"correct":22},"指令标志",{"key":28,"text":363,"correct":26},"指示标志",{"key":31,"text":365,"correct":26},"禁止标志",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":20,"analysis":33},1148117,"（2017 年真题）下图双代号网络图中，下部的数字表示的含义是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"工作持续时间",{"key":24,"text":373,"correct":26},"施工顺序",{"key":28,"text":375,"correct":26},"节点排序",{"key":31,"text":377,"correct":26},"工作名称",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":31,"analysis":33},1148118,"（2011 年真题）沥青面层压实度检测的方法有（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"环刀法",{"key":24,"text":385,"correct":26},"灌砂法",{"key":28,"text":387,"correct":26},"灌水法",{"key":31,"text":389,"correct":22},"钻芯法",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1148119,"（2019 年真题）根据《城镇道路工程施工与质量验收规范》（CJJ1-2008），土方路基压实度检测的方法是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"环刀法、灌砂法和灌水法",{"key":24,"text":397,"correct":26},"环刀法、钻芯法和灌水法",{"key":28,"text":399,"correct":26},"环刀法、钻芯法和灌砂法",{"key":31,"text":401,"correct":26},"灌砂法、钻芯法和灌水法",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":31,"analysis":33},1148120,"（2011 年真题）石灰稳定性基层施工错误的是（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":26},"宜采用塑性指数10~15 的粉质粘土、粘土，宜采用1~3 级的新石灰",{"key":24,"text":409,"correct":26},"磨细石灰可不经消解直接使用",{"key":28,"text":411,"correct":26},"块灰应在使用前2~3d 完成消解",{"key":31,"text":413,"correct":22},"消解石灰的粒径不得大于20mm",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1148121,"（2011 年真题）雨期面层施工说法正确的是（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":26},"应该坚持拌多少、铺多少、压多少、完成多少",{"key":24,"text":421,"correct":26},"下雨来不及完成时，要尽快碾压，防止雨水渗透",{"key":28,"text":423,"correct":26},"坚持当天挖完、填完、压完，不留后患",{"key":31,"text":425,"correct":22},"水泥混凝土路面应快振、磨平、成型",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1148122,"（2019 年真题）冬期施工质量控制要求的说法，错误的是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"粘层、透层、封层严禁冬期施工",{"key":24,"text":433,"correct":26},"水泥混凝土拌合料温度应不高于35℃",{"key":28,"text":435,"correct":22},"水泥混凝土拌合料可加防冻剂、缓凝剂，搅拌时间适当延长",{"key":31,"text":437,"correct":26},"水泥混凝土板弯拉强度低于1MPa 或抗压强度低于5MPa 时，不得受冻",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":28,"analysis":33},1148123,"（2016 年真题）关于水泥混凝土面层施工的说法，错误的是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"模板的选择应与摊铺施工方式相匹配",{"key":24,"text":445,"correct":26},"摊铺厚度应符合不同的施工方式",{"key":28,"text":447,"correct":22},"常温下应在下层养护3d 后方可摊铺上层材料",{"key":31,"text":449,"correct":26},"运输车辆要有防止混合料漏浆和离析的措施",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1148124,"（2016 年真题）适用于检测沥青路面压实度的方法是（ ）。",[454,455,456,457],{"key":20,"text":383,"correct":26},{"key":24,"text":389,"correct":22},{"key":28,"text":385,"correct":26},{"key":31,"text":387,"correct":26},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":28,"analysis":33},1148125,"（2010 年真题）后张法预应力筋张拉后孔道压浆采用的水泥浆强度在设计无要求时，不得低于（ ）MPa。",[462,464,466,468],{"key":20,"text":463,"correct":26},"15",{"key":24,"text":465,"correct":26},"20",{"key":28,"text":467,"correct":22},"30",{"key":31,"text":469,"correct":26},"35",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":20,"analysis":33},1148126,"（2010 年真题）下列属于悬臂浇筑主控项目的是（ ）。",[474,476,478,480],{"key":20,"text":475,"correct":22},"合龙时两侧梁体的高差",{"key":24,"text":477,"correct":26},"轴线偏位",{"key":28,"text":479,"correct":26},"顶面高程",{"key":31,"text":481,"correct":26},"断面尺寸",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":28,"analysis":33},1148127,"（2010 年真题 广东海南）预应力张拉施工应由工程项目（ ）主持。",[486,488,490,492],{"key":20,"text":487,"correct":26},"项目经理",{"key":24,"text":489,"correct":26},"施工负责人",{"key":28,"text":491,"correct":22},"技术负责人",{"key":31,"text":493,"correct":26},"质检负责人",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":24,"analysis":33},1148128,"（2016 年真题）大体积混凝土出现的裂缝按深度不同分为表面裂缝、深层裂缝和（ ）三种。",[498,500,502,504],{"key":20,"text":499,"correct":26},"收缩裂缝",{"key":24,"text":501,"correct":22},"贯穿裂缝",{"key":28,"text":503,"correct":26},"应力裂缝",{"key":31,"text":505,"correct":26},"结构裂缝",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":24,"analysis":33},1148129,"（2010 年真题 广东海南）过早拆除混凝土模板、支架或支撑，支架变形下沉会引发（ ）。",[510,512,513,515],{"key":20,"text":511,"correct":26},"表面裂缝",{"key":24,"text":505,"correct":22},{"key":28,"text":514,"correct":26},"深层裂缝",{"key":31,"text":501,"correct":26},{"id":517,"libraryId":5,"type":15,"typeLabel":16,"stem":518,"options":519,"answer":31,"analysis":33},1148130,"（2019 年真题）下列混凝土性能中，不适宜用于钢管混凝土拱的是（ ）。",[520,522,524,526],{"key":20,"text":521,"correct":26},"早强",{"key":24,"text":523,"correct":26},"补偿收缩",{"key":28,"text":525,"correct":26},"缓凝",{"key":31,"text":527,"correct":22},"干硬",{"id":529,"libraryId":5,"type":15,"typeLabel":16,"stem":530,"options":531,"answer":24,"analysis":33},1148131,"（2018 年真题）用于检验混凝土强度的试件应在（ ）随机抽取。",[532,534,536,538],{"key":20,"text":533,"correct":26},"混疑土拌合后30min 后",{"key":24,"text":535,"correct":22},"浇筑地点",{"key":28,"text":537,"correct":26},"混凝土拌合后60min 后",{"key":31,"text":539,"correct":26},"搅拌地点",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":24,"analysis":33},1148132,"（2012 年真题）钢筋混凝土管片不得有内外贯通裂缝和宽度大于（ ）mm 的裂缝及混凝土剥落现象。",[544,546,548,550],{"key":20,"text":545,"correct":26},"0.1",{"key":24,"text":547,"correct":22},"0.2",{"key":28,"text":549,"correct":26},"0.5",{"key":31,"text":551,"correct":26},"0.8",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":31,"analysis":33},1148133,"（2019 年真题）给水排水混凝土构筑物渗漏构造配筋设计时，尽可能采用（ ）。",[556,558,560,562],{"key":20,"text":557,"correct":26},"大直径、大间距",{"key":24,"text":559,"correct":26},"大直径、小间距",{"key":28,"text":561,"correct":26},"小直径、大间距",{"key":31,"text":563,"correct":22},"小直径、小间距",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":20,"analysis":33},1148134,"（2013 年真题下列控制水工构筑物池壁裂缝的措施中，属于施工措施的是（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"控制混凝土入模温度",{"key":24,"text":571,"correct":26},"提高混凝土抗渗等级",{"key":28,"text":573,"correct":26},"设置变形缝",{"key":31,"text":575,"correct":26},"合理增配构造筋",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":28,"analysis":33},1148135,"（2020年真题）柔性管道工程施工质量控制的关键是（）。",[580,582,584,586],{"key":20,"text":581,"correct":26},"管道接口",{"key":24,"text":583,"correct":26},"管道基础",{"key":28,"text":585,"correct":22},"沟槽回填",{"key":31,"text":587,"correct":26},"管道坡度",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},1148136,"(2018真题)下列属于专项安全检查内容的是（）。",[592,594,596,598],{"key":20,"text":593,"correct":22},"临时用电检查",{"key":24,"text":595,"correct":26},"防汛检查",{"key":28,"text":597,"correct":26},"防风检查",{"key":31,"text":599,"correct":26},"每周检查",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":24,"analysis":33},1148137,"（2014 年真题）基坑工程中，应由（ ）委托第三方检测。",[604,606,608,610],{"key":20,"text":605,"correct":26},"施工方",{"key":24,"text":607,"correct":22},"建设方",{"key":28,"text":609,"correct":26},"设计方",{"key":31,"text":611,"correct":26},"质量监督机构",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]