[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-39":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":741},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,39,50,2019,[13,38,52,67,82,97,112,127,142,157,172,186,200,214,229,243,257,272,286,300,314,328,343,358,373,387,401,416,430,444,458,472,486,500,515,529,543,558,573,587,601,615,629,643,657,671,685,699,713,727],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149873,2,"多选题","浇筑大体积混凝土质量控制措施主要有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","混凝土养护得当",true,{"key":24,"text":25,"correct":22},"B","浇筑与振捣措施",{"key":27,"text":28,"correct":29},"C","缩短混凝土的凝结时间",false,{"key":31,"text":32,"correct":22},"D","优化混凝土配合比",{"key":34,"text":35,"correct":29},"E","增加水泥用量","ABD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":36,"analysis":37},1149874,"城市桥梁工程在进行混凝土浇筑时，常采用的方法有（ ）浇筑。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"全面分层",{"key":24,"text":45,"correct":22},"分段分层",{"key":27,"text":47,"correct":29},"局部分层",{"key":31,"text":49,"correct":22},"斜面分层",{"key":34,"text":51,"correct":29},"全面连续",{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":66,"analysis":37},1149875,"对预应力施工，下列叙述正确的有（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":22},"承担预应力施工的单位应具有相应的施工资质",{"key":24,"text":59,"correct":29},"张拉设备的校准期限不得超过1年，且不得超过300次张拉作业",{"key":27,"text":61,"correct":22},"预应力张拉施工应由工程项目技术负责人主持",{"key":31,"text":63,"correct":29},"锚固完毕经检验合格后，可方使用电弧焊切割端头多余的预应力筋",{"key":34,"text":65,"correct":22},"预应力筋及孔道的品种、规格、数量必须符合设计要求","ACE",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},1149876,"钢管混凝土应具有（ ）特征。",[71,73,75,77,79],{"key":20,"text":72,"correct":22},"低泡",{"key":24,"text":74,"correct":29},"低流动",{"key":27,"text":76,"correct":22},"收缩补偿",{"key":31,"text":78,"correct":22},"延迟初凝",{"key":34,"text":80,"correct":22},"早强","ACDE",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1149877,"下列属于木模板制作检查一般项目的有（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"版面局部不平",{"key":24,"text":89,"correct":29},"面板端偏斜",{"key":27,"text":91,"correct":22},"相邻模板表面高低差",{"key":31,"text":93,"correct":29},"肋高",{"key":34,"text":95,"correct":29},"板面和板侧挠度","AC",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1149878,"支架上现浇箱梁检查项目有（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"轴线偏位",{"key":24,"text":104,"correct":22},"结构表面应无宽度超过0.15mm的收缩裂缝",{"key":27,"text":106,"correct":22},"横坡",{"key":31,"text":108,"correct":22},"平整度",{"key":34,"text":110,"correct":29},"梁顶板无局部不平整","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1149879,"下列关于悬臂浇筑检查项目正确的有（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"悬臂浇筑须对称进行，桥墩两侧平衡偏差经过验算确定，轴线挠度必须在设计规定范围内",{"key":24,"text":119,"correct":29},"梁体表面不得出现受力裂缝",{"key":27,"text":121,"correct":22},"悬臂合龙时，量侧梁体的高差必须在设计允许范围内",{"key":31,"text":123,"correct":22},"梁体线性平顺，相邻段接缝处无明显折弯和错台",{"key":34,"text":125,"correct":22},"梁体表面无孔洞、露筋、蜂窝麻面和宽度超过0.15mm收缩裂缝","CDE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1149880,"模板、支架和拱架制作及安装应符合施工设计图（施工方案）的规定，且稳固牢靠，接缝严密，支柱基础有足够的（ ）措施。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"支撑面",{"key":24,"text":134,"correct":29},"平整",{"key":27,"text":136,"correct":22},"排水",{"key":31,"text":138,"correct":22},"防冻融",{"key":34,"text":140,"correct":29},"压实","ACD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1149881,"关于地铁车站结构施工说法，正确的有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"混凝土结构施工前，施工单位应制定检测和试验计划，并应经监理单位批准后实施",{"key":24,"text":149,"correct":29},"墙体施工缝留置位置：水平施工缝在高出底板50～100mm处",{"key":27,"text":151,"correct":29},"顶、底板均可留置水平施工缝",{"key":31,"text":153,"correct":22},"模板及支架应根据安装、使用及拆除工况进行设计，并满足承载力、刚度、整体稳固性要求",{"key":34,"text":155,"correct":22},"钢筋进场时应抽取试件做力学性能和工艺性能试验","ADE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1149882,"地下车站基坑开挖时，应进行中间验收的项目有（ ）。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"基坑平面位置、宽度及基坑高程",{"key":24,"text":164,"correct":22},"基坑降水",{"key":27,"text":166,"correct":22},"基坑放坡开挖的坡度",{"key":31,"text":168,"correct":29},"基坑底土的压实度",{"key":34,"text":170,"correct":22},"基坑便桥稳固情况","ABCE",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":111,"analysis":37},1149883,"地铁车站的质量控制原则有（ ）。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"编制施工组织设计，经批准后组织方可用于指导施工",{"key":24,"text":179,"correct":22},"工程施工应以批准后的设计文件为依据",{"key":27,"text":181,"correct":22},"采用的原材料、预制品、设备等，应符合国家现行的有关技术标准规定",{"key":31,"text":183,"correct":22},"施工设备应有铭牌",{"key":34,"text":185,"correct":29},"采用和推广经鉴定并批准的新设备可与常规设备一样直接应用于工程",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":156,"analysis":37},1149884,"关于地铁车站混凝土浇筑的说法，正确的有（ ）。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"混凝土灌注前，隐蔽工程检查必须合格",{"key":24,"text":193,"correct":29},"底板混凝土应左右对称、水平、分层连续灌注",{"key":27,"text":195,"correct":29},"墙体混凝土应沿线路方向分层留台阶灌注",{"key":31,"text":197,"correct":22},"顶板混凝土应连续水平、分台阶由边墙、中墙分别向结构中间方向灌注",{"key":34,"text":199,"correct":22},"混凝土柱可单独施工，并应水平、分层灌注",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":81,"analysis":37},1149885,"喷锚暗挖法施工隧道施工质量检查与验收分为（ ）等环节。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"开挖",{"key":24,"text":207,"correct":29},"预支护",{"key":27,"text":209,"correct":22},"防水",{"key":31,"text":211,"correct":22},"初衬",{"key":34,"text":213,"correct":22},"二衬",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1149886,"关于施工质量保证计划，下列说法正确的有（ ）。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"由项目负责人评估作业难易程度及质量风险，制定质量保证计划",{"key":24,"text":221,"correct":22},"对于工程的关键部位，应编制专项施工方案",{"key":27,"text":223,"correct":22},"危险性较大分部分项工程专项方案，应通过专家论证",{"key":31,"text":225,"correct":29},"节约并合理控制成本",{"key":34,"text":227,"correct":29},"确保多个专业工程综合进行","ABC",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":141,"analysis":37},1149887,"喷射混凝土施工中，下列表述正确的有（ ）。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"喷射作业分段、分层进行，喷射顺序由下而上",{"key":24,"text":236,"correct":29},"喷头应保持垂直于工作面，喷头距工作面不宜大于2m",{"key":27,"text":238,"correct":22},"分层喷射时，应在前一层混凝土终凝后进行",{"key":31,"text":240,"correct":22},"喷射混凝土终凝2h后进行养护，时间不小于14d",{"key":34,"text":242,"correct":29},"喷射混凝土养护，冬期宜洒水养护",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":126,"analysis":37},1149888,"防水施工质量控制中，下列表述正确的有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":29},"应在初期支护完全稳定，且衬砌检查合格后进行",{"key":24,"text":250,"correct":29},"清理混凝土表面，剔除尖、突部位并用混凝土压实、找平",{"key":27,"text":252,"correct":22},"衬垫材料应直顺，用垫圈固定，钉牢在基面上",{"key":31,"text":254,"correct":22},"固定衬垫的垫圈，应与防水卷材同材质，并焊接牢固",{"key":34,"text":256,"correct":22},"采用专用热合机焊接，焊缝应均匀连续",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},1149889,"土方开挖施工质量控制中，下列表述正确的有（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"隧道外轮廓线的控制，宜用隧道断面仪",{"key":24,"text":264,"correct":22},"按设计要求确定开挖方式，经试验选择开挖步序",{"key":27,"text":266,"correct":29},"每开挖一榀钢拱架的间距，应及时支护、喷锚、闭合，可适当超挖",{"key":31,"text":268,"correct":29},"在稳定性好的地层中停止开挖，或停止作业时间较长时，应及时喷射混凝土封闭开挖面",{"key":34,"text":270,"correct":29},"相向开挖的两个开挖面相距约2倍管（隧）径时，可同时开挖","AB",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":111,"analysis":37},1149890,"二衬施工质量控制中，下列表述正确的有（ ）。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"结构变形基本稳定的条件下施作",{"key":24,"text":279,"correct":22},"模板支架应预留沉降量",{"key":27,"text":281,"correct":22},"应从下向上浇筑，各部位应对称浇筑、振捣密实，且振捣器不得触及防水层",{"key":31,"text":283,"correct":22},"拆模时间应根据结构断面形式及混凝土达到的强度确定",{"key":34,"text":285,"correct":29},"减水型、缓凝型外加剂，其掺量应按设计要求确定",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":171,"analysis":37},1149891,"进出工作井的安全质量控制主要措施有（ ）等。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"按照设计要求，采取超前小导管注浆加固措施",{"key":24,"text":293,"correct":22},"在进出位置安放钢拱架并及时喷射混凝土",{"key":27,"text":295,"correct":22},"根据设计给定的暗挖施工步骤，凿除进出位置的工作井支护结构",{"key":31,"text":297,"correct":29},"监测数据信息反馈，调整设计和施工参数",{"key":34,"text":299,"correct":22},"按照设计要求，采取大管棚注浆加固措施",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":36,"analysis":37},1149892,"为了减少给水排水构筑物裂缝，在设计方面，应做到以下几点（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"避免应力集中",{"key":24,"text":307,"correct":22},"合理增配构造钢筋提高抗裂性能",{"key":27,"text":309,"correct":29},"配筋尽可能采用大直径、大间距",{"key":31,"text":311,"correct":22},"照设计规范要求，设置变形缝",{"key":34,"text":313,"correct":29},"全断面配筋率不大于0.3％",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":156,"analysis":37},1149893,"为了避免混凝土结构内外温差过大而造成给水排水构筑物出现裂缝所采取的措施有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"降低混凝土的入模温度",{"key":24,"text":321,"correct":29},"对混凝土尽快加热",{"key":27,"text":323,"correct":29},"配合比中水的含量减少1\u002F3",{"key":31,"text":325,"correct":22},"延长拆模时间",{"key":34,"text":327,"correct":22},"结构外保温",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},1149894,"给水排水构筑物施工时，抗渗混凝土宜避开（ ）和施工，减少温度裂缝产生。",[332,334,336,338,340],{"key":20,"text":333,"correct":29},"雨期",{"key":24,"text":335,"correct":22},"冬期",{"key":27,"text":337,"correct":29},"风期",{"key":31,"text":339,"correct":22},"热期",{"key":34,"text":341,"correct":29},"潮期","BD",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},1149895,"以下选项中属于减少给水排水构筑物裂缝的施工措施有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"严格控制模板的尺寸",{"key":24,"text":350,"correct":22},"合理设置后浇带",{"key":27,"text":352,"correct":22},"控制入模坍落度，做好浇筑振动工作",{"key":31,"text":354,"correct":22},"避免混凝土结构内外温差过大",{"key":34,"text":356,"correct":22},"使混凝土配合比有利于减少和避免裂缝","BCDE",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":372,"analysis":37},1149896,"滤池是给水处理构筑物之一，它由清水区、（ ）、浑水区组成。",[362,364,366,368,370],{"key":20,"text":363,"correct":29},"离子交换区",{"key":24,"text":365,"correct":29},"溶解区",{"key":27,"text":367,"correct":29},"吸附层",{"key":31,"text":369,"correct":22},"滤料层",{"key":34,"text":371,"correct":22},"滤板","DE",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":357,"analysis":37},1149897,"在未采取有效防护措施的情况下，以下（ ）环境不得进行焊接作业。",[377,379,381,383,385],{"key":20,"text":378,"correct":29},"温度低于0℃",{"key":24,"text":380,"correct":22},"相对湿度大于90％",{"key":27,"text":382,"correct":22},"焊条电弧焊时风速大于8m\u002Fs",{"key":31,"text":384,"correct":22},"气体保护焊时风速大于2m\u002Fs",{"key":34,"text":386,"correct":22},"雨、雪天气",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":111,"analysis":37},1149898,"在热力管道焊接过程中，施工控制的重点内容包括（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"焊接环境",{"key":24,"text":394,"correct":22},"焊接工艺参数",{"key":27,"text":396,"correct":22},"焊接顺序",{"key":31,"text":398,"correct":22},"焊后热处理",{"key":34,"text":400,"correct":29},"焊后检测修补",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},1149899,"关于法兰连接的叙述正确的是（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":29},"当两法兰不平行且超过规定要求时必须进行调整，可以使用多个垫片予以校正",{"key":24,"text":408,"correct":22},"法兰在与管道焊接连接时，应按标准规定双侧焊接",{"key":27,"text":410,"correct":22},"密封材料的选择应与工作介质相适应",{"key":31,"text":412,"correct":22},"选择与设备或阀件相连接的法兰时，应按不低于设备或阀件公称压力的原则选用",{"key":34,"text":414,"correct":29},"法兰与管道组装时，法兰连接的平行偏差不应大于法兰外径的1.5%","BCD",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":228,"analysis":37},1149900,"在PE管道连接中当出现（ ）情况时必须采用电熔连接方法。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"不同级别的材料",{"key":24,"text":423,"correct":22},"不同熔体质量流动速率",{"key":27,"text":425,"correct":22},"不同的标准尺寸比",{"key":31,"text":427,"correct":29},"钢管与PE管连接",{"key":34,"text":429,"correct":29},"管道与设备连接",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":271,"analysis":37},1149901,"现场常用的基层处理方法主要是（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"喷射除锈",{"key":24,"text":437,"correct":22},"工具除锈",{"key":27,"text":439,"correct":29},"生物除锈",{"key":31,"text":441,"correct":29},"化学除锈",{"key":34,"text":443,"correct":29},"火焰除锈",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":36,"analysis":37},1149902,"以下关于热熔连接的叙述正确的是（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"在热熔连接组对前，应清理连接面及加热工具表面",{"key":24,"text":451,"correct":22},"熔接时两对应的连接件应在同一轴线上",{"key":27,"text":453,"correct":29},"被连接的两管件厚度不一致对熔接无影响，不须做特殊处理",{"key":31,"text":455,"correct":22},"在保压时间、冷却时间内不得移动连接件或在连接件上施加任何外力",{"key":34,"text":457,"correct":29},"熔接后连接处应平整，不得出现凸缘",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":111,"analysis":37},1149903,"在PE管道热熔连接过程中，影响连接质量的主要参数有（ ）。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"加热时间",{"key":24,"text":465,"correct":22},"加热温度",{"key":27,"text":467,"correct":22},"热熔压力",{"key":31,"text":469,"correct":22},"保压、冷却时间",{"key":34,"text":471,"correct":29},"环境温度",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":171,"analysis":37},1149904,"关于防腐层施工，以下叙述正确的是（ ）。",[476,478,480,482,484],{"key":20,"text":477,"correct":22},"相对湿度较大的环境对施工质量的影响很大",{"key":24,"text":479,"correct":22},"涂刷类型的防腐层应按规定分层施工",{"key":27,"text":481,"correct":22},"胶带类型的防腐层施工时，应严格控制好施工温度，严禁超温加热",{"key":31,"text":483,"correct":29},"冰冻期不宜进行室外防腐层施工",{"key":34,"text":485,"correct":22},"胶带类型的防腐层施工有搭接宽度和施工顺序的要求",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":171,"analysis":37},1149905,"关于管道保温，以下叙述正确的是（ ）。",[490,492,494,496,498],{"key":20,"text":491,"correct":22},"有报警线的预制保温管，管道应在报警线下方",{"key":24,"text":493,"correct":22},"直埋保温管的接口应在保护壳气密性检查合格后，才可以进行发泡保温施工",{"key":27,"text":495,"correct":22},"支、托架处的保温层不应影响活动面的自由位移",{"key":31,"text":497,"correct":29},"保护层端头应封闭，螺钉间距不应大于150mm",{"key":34,"text":499,"correct":22},"伸缩缝内填充导热系数与保温材料相近的软质保温材料",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":514,"analysis":37},1149906,"管道焊缝内部质量检查的方法主要有（ ）检测",[504,506,508,510,512],{"key":20,"text":505,"correct":22},"射线",{"key":24,"text":507,"correct":29},"磁粉",{"key":27,"text":509,"correct":29},"渗透",{"key":31,"text":511,"correct":22},"超声波",{"key":34,"text":513,"correct":29},"敲击","AD",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":141,"analysis":37},1149907,"下列关于不合格焊缝返修说法正确的是（ ）。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"同一部位焊缝返修次数不得超过2次",{"key":24,"text":522,"correct":29},"同一焊工所焊焊缝返修次数不得超过2次",{"key":27,"text":524,"correct":22},"返修的焊缝长度不得小于50mm，返修后的焊缝应修磨成与原焊缝基本一致",{"key":31,"text":526,"correct":22},"应对形成该不合格焊缝的焊工所焊的其他焊缝按规定的检验比例、检验方法和检验标准加倍抽检",{"key":34,"text":528,"correct":29},"应对形成该不合格焊缝的焊工所焊的其他焊缝增加超声波检测",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":111,"analysis":37},1149908,"下列关于柔性管道质量标准及处理说法正确的是（ ）。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"条件相同的回填材料，每铺筑1000m2，应取样一次，每次取样至少应做两组测试",{"key":24,"text":536,"correct":22},"钢管或球墨铸铁管道变形率应不超过2％、化学建材管道变形率应不超过3％",{"key":27,"text":538,"correct":22},"用圆度测试板或芯轴仪管内拖拉量测管道变形值",{"key":31,"text":540,"correct":22},"钢管或球墨铸铁管道的变形率超过3％时，化学建材管道变形率超过5％时，应挖出管道，并会同设计研究处理",{"key":34,"text":542,"correct":29},"柔性管道回填至管顶1.5m时应在12～24h内测量并记录管道变形率",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":557,"analysis":37},1149909,"柔性管道回填土回填作业的压实遍数，按（ ），经现场确定",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"虚铺厚度",{"key":24,"text":550,"correct":22},"含水量",{"key":27,"text":552,"correct":29},"压实遍数",{"key":31,"text":554,"correct":29},"压实厚度",{"key":34,"text":556,"correct":22},"压实工具","ABE",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":572,"analysis":37},1149910,"给水排水工程中砌筑结构，对材料的基本要求（ ）。",[562,564,566,568,570],{"key":20,"text":563,"correct":29},"用于砌筑结构的机制烧结砖应边角整齐、表面平整、尺寸准确，强度等级符合设计要求，一般不低于MU10",{"key":24,"text":565,"correct":29},"用于砌筑结构的石材强度等级应符合设计要求，设计无要求时不得小于20MPa。石料应质地坚实均匀，无风化剥层和裂纹",{"key":27,"text":567,"correct":22},"用于砌筑结构的混凝土砌块应符设计要求和相关标准规定",{"key":31,"text":569,"correct":29},"砌筑砂浆应采用水泥砂浆，其强度等级应符合设计要求，且不应低于M20",{"key":34,"text":571,"correct":22},"水泥应采用砌筑水泥，并符合《砌筑水泥》GB\u002FT3183-2003标准","CE",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":111,"analysis":37},1149911,"调查基坑开挖范围内及影响范围内的各种管线，需要掌握管线的（ ）等。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"埋深",{"key":24,"text":580,"correct":22},"施工年限",{"key":27,"text":582,"correct":22},"使用状况",{"key":31,"text":584,"correct":22},"位置",{"key":34,"text":586,"correct":29},"产权变更情况",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":171,"analysis":37},1149912,"项目部安全生产资料管理应符合（ ）等要求。",[591,593,595,597,599],{"key":20,"text":592,"correct":22},"由专职安全员负责施工安全生产资料管理，随工程进度同步收集、整理",{"key":24,"text":594,"correct":22},"施工现场应保存特种作业人员登记表，作业人员安全教育记录表",{"key":27,"text":596,"correct":22},"施工现场应保存地上、地下管线及建（构）筑物资料移交单",{"key":31,"text":598,"correct":29},"施工现场应保存安全防护、文明施工措施费预算表",{"key":34,"text":600,"correct":22},"施工现场应保存项目重大危险源控制措施，生产安全事故应急预案",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":81,"analysis":37},1149913,"现场安全检查内容包括（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":22},"安全管理制度执行情况",{"key":24,"text":608,"correct":29},"人员上岗情况",{"key":27,"text":610,"correct":22},"施工现场安全隐患排查情况",{"key":31,"text":612,"correct":22},"施工现场安全生产标准化执行情况",{"key":34,"text":614,"correct":22},"生产安全事故、未遂事故和其他违规违法事件的调查、处理情况",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":171,"analysis":37},1149914,"下列关于应急预案说法正确的是（ ）。",[619,621,623,625,627],{"key":20,"text":620,"correct":22},"应急预案分为综合应预案、专项应急预案和现场处理方案",{"key":24,"text":622,"correct":22},"应急预案应对全体人员进行培训和交底，进行专项应急演练",{"key":27,"text":624,"correct":22},"由总承包单位统一组织编制应急预案",{"key":31,"text":626,"correct":29},"应制定应急预案演练计划，每半年至少组织一次综合应急预案演练或者专项应急预案演练",{"key":34,"text":628,"correct":22},"应急预案按照分级属地原则，应向安全生产监督管理部门和有关部门进行告知性备案",{"id":630,"libraryId":5,"type":15,"typeLabel":16,"stem":631,"options":632,"answer":111,"analysis":37},1149915,"下列属于安全检查目的的是（ ）。",[633,635,637,639,641],{"key":20,"text":634,"correct":22},"消除隐患",{"key":24,"text":636,"correct":22},"防止事故",{"key":27,"text":638,"correct":22},"改善劳动条件",{"key":31,"text":640,"correct":22},"提高员工安全意识",{"key":34,"text":642,"correct":29},"杜绝危险发生的可能性",{"id":644,"libraryId":5,"type":15,"typeLabel":16,"stem":645,"options":646,"answer":228,"analysis":37},1149916,"下列关于施工负责人安全技术交底，说法正确的是（ ）。",[647,649,651,653,655],{"key":20,"text":648,"correct":22},"安全技术交底应按施工工序、施工部位、分部分项工程进行",{"key":24,"text":650,"correct":22},"安全技术交底应结合施工作业场所状况、特点、工序，对危险因素、施工方案、规范标准、操作规程和应急措施进行交底",{"key":27,"text":652,"correct":22},"安全技术交底必须在施工作业前进行，应留有书面材料，由交底人、被交底人、专职安全员进行签字确认",{"key":31,"text":654,"correct":29},"对相对固定的施工作业，与施工部位没有直接关系的工种，可不进行安全技术交底",{"key":34,"text":656,"correct":29},"对项目各级管理人员，可不进行安全技术交底",{"id":658,"libraryId":5,"type":15,"typeLabel":16,"stem":659,"options":660,"answer":111,"analysis":37},1149917,"下列项目管理中，属于安全生产管理制度的是（ ）。",[661,663,665,667,669],{"key":20,"text":662,"correct":22},"安全生产值班制度",{"key":24,"text":664,"correct":22},"安全生产例会制度",{"key":27,"text":666,"correct":22},"安全生产检查制度",{"key":31,"text":668,"correct":22},"安全生产验收制度",{"key":34,"text":670,"correct":29},"安全技术管理制度",{"id":672,"libraryId":5,"type":15,"typeLabel":16,"stem":673,"options":674,"answer":228,"analysis":37},1149918,"下列哪些验收项目必须坚持“验收合格方可使用”的规定：（ ）。",[675,677,679,681,683],{"key":20,"text":676,"correct":22},"水平安全网和立网",{"key":24,"text":678,"correct":22},"起重吊装设备",{"key":27,"text":680,"correct":22},"大型模板支撑系统",{"key":31,"text":682,"correct":29},"运土汽车",{"key":34,"text":684,"correct":29},"沟槽边坡",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":126,"analysis":37},1149919,"新入场的作业人员必须接受（ ）三级安全培训教育。",[689,691,693,695,697],{"key":20,"text":690,"correct":29},"劳动部门",{"key":24,"text":692,"correct":29},"专业部门",{"key":27,"text":694,"correct":22},"公司",{"key":31,"text":696,"correct":22},"班组",{"key":34,"text":698,"correct":22},"项目部",{"id":700,"libraryId":5,"type":15,"typeLabel":16,"stem":701,"options":702,"answer":228,"analysis":37},1149920,"工程项目应建立以项目经理为组长的安全生产管理机构，工程项目施工实行总承包的，应成立由（ ）等单位的相关人员组成安全管理领导小组。",[703,705,707,709,711],{"key":20,"text":704,"correct":22},"总承包",{"key":24,"text":706,"correct":22},"专业承包",{"key":27,"text":708,"correct":22},"劳务分包",{"key":31,"text":710,"correct":29},"机械租赁",{"key":34,"text":712,"correct":29},"监理",{"id":714,"libraryId":5,"type":15,"typeLabel":16,"stem":715,"options":716,"answer":171,"analysis":37},1149921,"安全保证计划是施工组织设计的重要组成部分，下列项目属于计划内容是（ ）。",[717,719,721,723,725],{"key":20,"text":718,"correct":22},"工程项目安全目标及为安全目标规定的相关部门、岗位的职责和权限",{"key":24,"text":720,"correct":22},"危险源识别、评价和相应的控制方式",{"key":27,"text":722,"correct":22},"适用法律、法规、标准规范和其他要求",{"key":31,"text":724,"correct":29},"施工进度计划和平面布置",{"key":34,"text":726,"correct":22},"安全控制工作程序、规章制度",{"id":728,"libraryId":5,"type":15,"typeLabel":16,"stem":729,"options":730,"answer":514,"analysis":37},1149922,"专职安全员发现施工中的违章指挥和违章作业等不安全状态，正确的做法是（ ）。",[731,733,735,737,739],{"key":20,"text":732,"correct":22},"采取措施予以消除",{"key":24,"text":734,"correct":29},"制定有针对性的纠正措施",{"key":27,"text":736,"correct":29},"进行原因分析",{"key":31,"text":738,"correct":22},"纠正施工人员的不安全行为",{"key":34,"text":740,"correct":29},"进行整改结果分析和报告",[742,746,749,752,755,758],{"id":743,"name":744,"category":7,"favorite":745},1,"领导干部任职前廉政法规知识测试题",92,{"id":747,"name":748,"category":7,"favorite":743},595,"建筑结构与设备",{"id":750,"name":751,"category":7,"favorite":743},715,"招标采购专业知识与法律法规",{"id":753,"name":754,"category":7,"favorite":743},848,"市政方向-通用基础",{"id":756,"name":757,"category":7,"favorite":8},534,"BIM工程师",{"id":759,"name":757,"category":7,"favorite":8},535]