[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-38":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":733},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,38,50,2019,[13,38,53,68,83,98,112,127,141,156,171,185,200,215,229,243,258,271,286,300,314,328,342,356,370,384,399,413,427,441,455,469,483,495,510,524,538,552,566,580,594,608,622,636,650,664,677,691,705,719],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149823,2,"多选题","施工方案应包括的主要内容有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","施工方法的确定",true,{"key":24,"text":25,"correct":22},"B","技术措施的确定",{"key":27,"text":28,"correct":22},"C","施工机具的选择",{"key":30,"text":31,"correct":32},"D","工艺技术的选择",false,{"key":34,"text":35,"correct":22},"E","施工顺序的确定","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149824,"工程施工阶段按照施工总平面图要求，设置道路、组织排水以及（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"搭建临时设施",{"key":24,"text":45,"correct":22},"堆放物料",{"key":27,"text":47,"correct":22},"停放机具设备",{"key":30,"text":49,"correct":32},"设置交通警示牌",{"key":34,"text":51,"correct":32},"设置防火须知牌","ABC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149825,"关于围挡（墙）叙述正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"围挡（墙）不得留有缺口",{"key":24,"text":60,"correct":32},"围挡（墙）材料可用竹笆或安全网",{"key":27,"text":62,"correct":32},"围挡一般应高于1.8m，在市区内应高于2.1m",{"key":30,"text":64,"correct":22},"禁止在围挡内侧堆放泥土、砂石等散状材料以及架管、模板等",{"key":34,"text":66,"correct":22},"雨后、大风后以及春融季节应当检查围挡的稳定性，发现问题及时处理","ADE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1149826,"以下符合总平面布置原则的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"平面布置合理、紧凑，尽可能减少施工用地",{"key":24,"text":75,"correct":32},"合理组织运输，保证场内道路畅通，各种材料能按计划同时进场，避免二次搬运",{"key":27,"text":77,"correct":22},"因地制宜划分施工区域的和临时占用场地，减少各工种之间的干扰",{"key":30,"text":79,"correct":32},"在保证施工顺利进行的条件下，尽可能在施工现场附近搭设施工临时设施",{"key":34,"text":81,"correct":22},"施工现场临时设施的布置，福利设施应在生活区范围之内","ACE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1149827,"根据国家有关规定，（ ）等处应当设置明显的安全警示标志。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"楼梯口",{"key":24,"text":90,"correct":32},"大门口",{"key":27,"text":92,"correct":22},"桥梁口",{"key":30,"text":94,"correct":22},"出入通道口",{"key":34,"text":96,"correct":22},"隧道口","ACDE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":36,"analysis":37},1149828,"安全警示标志的类型主要有（ ）标志。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"警告",{"key":24,"text":105,"correct":22},"指令",{"key":27,"text":107,"correct":22},"指示",{"key":30,"text":109,"correct":32},"提醒",{"key":34,"text":111,"correct":22},"禁止",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1149829,"安全警示标志设置后的管理工作主要内容包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":32},"检查",{"key":24,"text":119,"correct":22},"记录",{"key":27,"text":121,"correct":32},"核实",{"key":30,"text":123,"correct":32},"维护",{"key":34,"text":125,"correct":22},"填表","BE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":97,"analysis":37},1149830,"临时设施的种类包括（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"办公设施",{"key":24,"text":134,"correct":32},"安全设施",{"key":27,"text":136,"correct":22},"生活设施",{"key":30,"text":138,"correct":22},"辅助设施",{"key":34,"text":140,"correct":22},"生产设施",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1149831,"为减少扬尘污染，施工现场应采取（ ）措施。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"场地硬化处理",{"key":24,"text":148,"correct":22},"洒水降尘",{"key":27,"text":150,"correct":32},"现场少存材料",{"key":30,"text":152,"correct":32},"土方堆成大堆",{"key":34,"text":154,"correct":22},"专人清扫社会交通线","ABE",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},1149832,"对劳务队实行实名制管理，推行IC卡对提高项目管理水平有着积极的作用，其中IC卡可实现的管理功能有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"人员信息管理",{"key":24,"text":163,"correct":22},"工资管理",{"key":27,"text":165,"correct":22},"考勤管理",{"key":30,"text":167,"correct":22},"门禁管理",{"key":34,"text":169,"correct":32},"现场治安管理","ABCD",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":82,"analysis":37},1149833,"项目部应每月进行一次劳务实名制管理检查，属于检查的内容有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"上岗证",{"key":24,"text":178,"correct":32},"家庭背景",{"key":27,"text":180,"correct":22},"身份证",{"key":30,"text":182,"correct":32},"处罚记录",{"key":34,"text":184,"correct":22},"考勤表",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1149834,"以下（ ）是编制施工进度计划的一部分根据。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"技术条件",{"key":24,"text":192,"correct":22},"资源情况",{"key":27,"text":194,"correct":32},"质量标准",{"key":30,"text":196,"correct":22},"定额材料",{"key":34,"text":198,"correct":22},"设计图纸","ABDE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1149835,"常用的表达工程进度计划方法有（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"横道图",{"key":24,"text":207,"correct":22},"网络计划图",{"key":27,"text":209,"correct":32},"频率图",{"key":30,"text":211,"correct":32},"直方图",{"key":34,"text":213,"correct":32},"正态分布图","AB",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":155,"analysis":37},1149836,"以下说法（ ）是正确的。",[219,221,223,225,227],{"key":20,"text":220,"correct":22},"分包人的施工进度计划必须依据承包人的施工进度计划编制",{"key":24,"text":222,"correct":22},"承包人应将分包的施工进度计划纳入总进度计划的控制范畴，总,分包之间相互协调",{"key":27,"text":224,"correct":32},"分包人可以根据自行编制进度计划",{"key":30,"text":226,"correct":32},"承包人没有义务协助分包人解决进度控制中的相关问题",{"key":34,"text":228,"correct":22},"承包人应协助分包人解决项目进度控制中的相关问题",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":155,"analysis":37},1149837,"施工进度控度总目标应进行分解，不同的工程项目可分解为（ ）分目标。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"交工",{"key":24,"text":236,"correct":22},"时间",{"key":27,"text":238,"correct":32},"完工",{"key":30,"text":240,"correct":32},"单项",{"key":34,"text":242,"correct":22},"阶段",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},1149838,"施工进度计划在实施过程中进行的必要调整，调整内容不包括（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":32},"起止时间",{"key":24,"text":250,"correct":22},"检查方法",{"key":27,"text":252,"correct":32},"持续时间",{"key":30,"text":254,"correct":22},"考核办法",{"key":34,"text":256,"correct":32},"资源供应","BD",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":52,"analysis":37},1149839,"落实进度控制的措施应具体到（ ）。",[262,264,266,268,270],{"key":20,"text":263,"correct":22},"执行人",{"key":24,"text":265,"correct":22},"目标",{"key":27,"text":267,"correct":22},"任务",{"key":30,"text":269,"correct":32},"作业队",{"key":34,"text":250,"correct":32},{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},1149840,"在施工进度计划调整中，工作关系的调整主要是指施工（ ）的重新确认，目的在于利用施工的时间和空间进行合理的衔接。",[275,277,279,281,283],{"key":20,"text":276,"correct":22},"顺序的局部改变",{"key":24,"text":278,"correct":32},"操作工具",{"key":27,"text":280,"correct":22},"相互协作方式",{"key":30,"text":282,"correct":32},"材料供应",{"key":34,"text":284,"correct":32},"居住场地","AC",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":170,"analysis":37},1149841,"进度计划检查审核的部分内容是（ ）。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"能否保证工程施工质量",{"key":24,"text":293,"correct":22},"施工的均衡性",{"key":27,"text":295,"correct":22},"能否保证工程施工安全",{"key":30,"text":297,"correct":22},"计划内容是否全面",{"key":34,"text":299,"correct":32},"进度计划调整",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":97,"analysis":37},1149842,"施工进度报告的内容包括进度计划执行情况综述、实际施工进度图、解决问题的措施以及（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"工程变更与价格调整",{"key":24,"text":307,"correct":32},"监理工程师的指令",{"key":27,"text":309,"correct":22},"索赔及工程款收支情况",{"key":30,"text":311,"correct":22},"进度偏差状况及原因",{"key":34,"text":313,"correct":22},"计划调整意见",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":52,"analysis":37},1149843,"施工进度控制总结应包括的内容：合同工期目标及计划工期目标完成情况、施工进度控制经验与体会，以及（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"存在的问题及分析",{"key":24,"text":321,"correct":22},"科学方法的应用情况",{"key":27,"text":323,"correct":22},"改进意见",{"key":30,"text":325,"correct":32},"制定调整方案",{"key":34,"text":327,"correct":32},"外界干扰情况",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":97,"analysis":37},1149844,"编制进度总结时应依据（ ）资料。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"进度计划",{"key":24,"text":335,"correct":32},"大事记",{"key":27,"text":337,"correct":22},"计划执行的实际记录",{"key":30,"text":339,"correct":22},"计划的检查结果",{"key":34,"text":341,"correct":22},"计划的调整资料",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":199,"analysis":37},1149845,"施工质量保证计划内容包括：明确质量目标以及（ ）。",[346,348,350,352,354],{"key":20,"text":347,"correct":22},"确定组织机构",{"key":24,"text":349,"correct":22},"质量管理措施",{"key":27,"text":351,"correct":32},"编制依据",{"key":30,"text":353,"correct":22},"质量控制流程",{"key":34,"text":355,"correct":22},"确定管理体系",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":369,"analysis":37},1149846,"质量保证计划应包括的内容有（ ）。",[360,362,364,366,368],{"key":20,"text":361,"correct":32},"不合格产品控制",{"key":24,"text":363,"correct":22},"明确质量目标",{"key":27,"text":365,"correct":32},"质量负责人",{"key":30,"text":367,"correct":22},"确定管理体系与组织机构",{"key":34,"text":353,"correct":22},"BDE",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":369,"analysis":37},1149847,"质量控制“三检制”流程内容为（ ）。",[374,376,378,380,382],{"key":20,"text":375,"correct":32},"监理检查",{"key":24,"text":377,"correct":22},"质量工程专业检查",{"key":27,"text":379,"correct":32},"企业检查",{"key":30,"text":381,"correct":22},"工序或工种间互检",{"key":34,"text":383,"correct":22},"实施班组自检",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":398,"analysis":37},1149848,"施工准备阶段质量控制，重点是（ ）。",[388,390,392,394,396],{"key":20,"text":389,"correct":32},"质量监督",{"key":24,"text":391,"correct":22},"技术准备",{"key":27,"text":393,"correct":22},"质量计划",{"key":30,"text":395,"correct":32},"质量目标",{"key":34,"text":397,"correct":32},"考核评价","BC",{"id":400,"libraryId":5,"type":15,"typeLabel":16,"stem":401,"options":402,"answer":369,"analysis":37},1149849,"关于质量计划的验证，下述叙述正确的有（ ）。",[403,405,407,409,411],{"key":20,"text":404,"correct":32},"项目负责人定期组织质检人员进行内部质量审核",{"key":24,"text":406,"correct":22},"项目技术负责人应定期组织项目管理人员进行内部质量审核",{"key":27,"text":408,"correct":32},"项目负责人应定期组织具有资质的质检人员进行内部质量审核",{"key":30,"text":410,"correct":22},"对重复出现的不合格质量问题，责任人按规定承担责任",{"key":34,"text":412,"correct":22},"对重复出现的不合格质量问题，依据验证评价的结果对责任人进行处罚",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":426,"analysis":37},1149850,"施工质量因素控制的内容有（ ）。",[417,419,421,423,425],{"key":20,"text":418,"correct":22},"人员控制",{"key":24,"text":420,"correct":22},"材料质量控制",{"key":27,"text":422,"correct":32},"质量通病控制",{"key":30,"text":424,"correct":22},"机械设备质量控制",{"key":34,"text":361,"correct":32},"ABD",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":170,"analysis":37},1149851,"关于质量管理与控制重点，下述叙述正确的有（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":22},"关键工序",{"key":24,"text":434,"correct":22},"实行分包的分项、分部工程",{"key":27,"text":436,"correct":22},"应用“四新技术”",{"key":30,"text":438,"correct":22},"隐蔽工程",{"key":34,"text":440,"correct":32},"不合格",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":170,"analysis":37},1149852,"关于施工准备阶段质量管理内容，下述叙述正确的有（ ）。 A、项目部进场后应由技术负责人组织工程现场和周围环境调研和详勘",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"建立以项目经理为第一责任人的管理组织机构和质量管理体系，明确各级岗位责任制及职能分工",{"key":24,"text":448,"correct":22},"在满足施工质量和进度的前提下合理组织和安排施工队伍",{"key":27,"text":450,"correct":22},"施工项目部组织全体施工人员进行质量管理和质量标准的培训，并应保存培训记录",{"key":30,"text":452,"correct":22},"对设计技术交底、交桩给定的工程测量控制点进行复测，当发现问题时，应与监理协商处理，并形成记录",{"key":34,"text":454,"correct":32},"A是质量管理要求不是质量管理内容",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":36,"analysis":37},1149853,"不合格处置应根据不合格的严重程度按（ ）等情况处置。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"返工",{"key":24,"text":462,"correct":22},"报废",{"key":27,"text":464,"correct":22},"让步接收",{"key":30,"text":466,"correct":32},"继续使用",{"key":34,"text":468,"correct":22},"降级使用",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":257,"analysis":37},1149854,"在施工项目质量控制过程中，对（ ）工程必须实施纠正方案及措施",[473,475,477,479,481],{"key":20,"text":474,"correct":32},"质量有缺陷的",{"key":24,"text":476,"correct":22},"严重不合格的",{"key":27,"text":478,"correct":32},"质量偏差影响下一工序的",{"key":30,"text":480,"correct":22},"重大质量事故",{"key":34,"text":482,"correct":32},"影响结构安全的",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":67,"analysis":37},1149855,"项目经理部应对项目质量计划执行情况组织（ ）验证实施效果。",[487,488,490,492,494],{"key":20,"text":117,"correct":22},{"key":24,"text":489,"correct":32},"调查",{"key":27,"text":491,"correct":32},"外部评审",{"key":30,"text":493,"correct":22},"内部审核",{"key":34,"text":397,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":509,"analysis":37},1149856,"石灰稳定土、水泥稳定土、石灰粉煤灰稳定砂砾等无机结合料稳定基层质量检验项目主要有：集料级配、混合料配合比、含水量、（ ）等。",[499,501,503,505,507],{"key":20,"text":500,"correct":32},"颗料直径",{"key":24,"text":502,"correct":32},"材料性能试验",{"key":27,"text":504,"correct":22},"拌合均匀性",{"key":30,"text":506,"correct":22},"基层压实度",{"key":34,"text":508,"correct":22},"7d无侧限抗压强度","CDE",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":170,"analysis":37},1149857,"我国行业标准规定沥青混凝土面层外观质量要求有：表面应平整、坚实，不得有脱落、裂缝、推挤、粗细料集中现象，以及（ ）等项内容。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"不得有掉渣",{"key":24,"text":517,"correct":22},"不得有烂边",{"key":27,"text":519,"correct":22},"不得积水",{"key":30,"text":521,"correct":22},"不得有明显轮迹",{"key":34,"text":523,"correct":32},"中线高程符合要求",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":369,"analysis":37},1149858,"城镇道路工程与施工质量验收规范规定沥青面层施工质量检测与验收项目包括（ ）",[528,530,532,534,536],{"key":20,"text":529,"correct":32},"积水面积",{"key":24,"text":531,"correct":22},"厚度",{"key":27,"text":533,"correct":32},"烂边长度",{"key":30,"text":535,"correct":22},"平整度",{"key":34,"text":537,"correct":22},"中线偏位",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":369,"analysis":37},1149859,"在水泥混凝土路面施工时，普通混凝土配合比在兼顾经济性的同时应满足（ ）三项技术要求。",[542,544,546,548,550],{"key":20,"text":543,"correct":32},"坍落度",{"key":24,"text":545,"correct":22},"弯拉强度",{"key":27,"text":547,"correct":32},"和易性",{"key":30,"text":549,"correct":22},"工作性",{"key":34,"text":551,"correct":22},"耐久性",{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":170,"analysis":37},1149860,"水泥混凝土路面在混凝土摊铺前应全面检查模板的间隔、润滑及（ ）等项内容。",[556,558,560,562,564],{"key":20,"text":557,"correct":22},"高度",{"key":24,"text":559,"correct":22},"支撑稳定情况",{"key":27,"text":561,"correct":22},"钢筋位置",{"key":30,"text":563,"correct":22},"传力杆装置",{"key":34,"text":565,"correct":32},"摊铺厚度",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":97,"analysis":37},1149861,"道路雨期施工基本要求有（ ）等。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"以预防为主，掌握主动权",{"key":24,"text":573,"correct":32},"按常规安排工期",{"key":27,"text":575,"correct":22},"做好排水系统，防排结合",{"key":30,"text":577,"correct":22},"发现积水、挡水处及时疏通",{"key":34,"text":579,"correct":22},"准备好防雨物资",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":82,"analysis":37},1149862,"《城镇道路工程施工与质量验收规范》CJJ1-2008中强制性条文规定：沥青混合料面层不得在（ ）时施工。",[584,586,588,590,592],{"key":20,"text":585,"correct":22},"下雨天",{"key":24,"text":587,"correct":32},"刮风天",{"key":27,"text":589,"correct":22},"下雪天",{"key":30,"text":591,"correct":32},"大雾天",{"key":34,"text":593,"correct":22},"最高气温低于5℃",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":126,"analysis":37},1149863,"压实质量的评定中，对于压实度，下列叙述不正确的是（ ）。",[598,600,602,604,606],{"key":20,"text":599,"correct":32},"土基、路基、沥青路面工程施工质量检验项目中，压实度均为主控项目，必须达到100%合格",{"key":24,"text":601,"correct":22},"压实度必须达到90％以上的合格率",{"key":27,"text":603,"correct":32},"压实度达不到要求值时，应采取措施加强碾压",{"key":30,"text":605,"correct":32},"压实度是由湿（质量）密度和含水量计算出干（质量）密度后而计算得到的",{"key":34,"text":607,"correct":22},"环刀法适用于粉砂压实度检测",{"id":609,"libraryId":5,"type":15,"typeLabel":16,"stem":610,"options":611,"answer":82,"analysis":37},1149864,"道路施工的压实度检测方法较多，对于路基、基层可采用的方法有（ ）。",[612,614,616,618,620],{"key":20,"text":613,"correct":22},"环刀法",{"key":24,"text":615,"correct":32},"马歇尔击实试验",{"key":27,"text":617,"correct":22},"灌砂法",{"key":30,"text":619,"correct":32},"核子密度仪检测",{"key":34,"text":621,"correct":22},"灌水法",{"id":623,"libraryId":5,"type":15,"typeLabel":16,"stem":624,"options":625,"answer":170,"analysis":37},1149865,"下列选项中，哪些是造成钻孔灌注桩质量事故主要原因（ ）。",[626,628,630,632,634],{"key":20,"text":627,"correct":22},"桩端持力层判别错误",{"key":24,"text":629,"correct":22},"孔底沉渣过厚",{"key":27,"text":631,"correct":22},"混凝土灌筑过程因故中断",{"key":30,"text":633,"correct":22},"孔口高程误差",{"key":34,"text":635,"correct":32},"混凝土收缩变形",{"id":637,"libraryId":5,"type":15,"typeLabel":16,"stem":638,"options":639,"answer":257,"analysis":37},1149866,"钻孔灌注桩施工时，为防止钻孔深度误差造成钻孔灌注桩质量事故，正确的钻孔深度测量方法有（ ）。",[640,642,644,646,648],{"key":20,"text":641,"correct":32},"用测绳",{"key":24,"text":643,"correct":22},"丈量钻杆",{"key":27,"text":645,"correct":32},"用钢尺",{"key":30,"text":647,"correct":22},"钻孔到达桩端持力层后应及时取样鉴定，确定钻孔是否进入桩端持力层",{"key":34,"text":649,"correct":32},"用水准仪",{"id":651,"libraryId":5,"type":15,"typeLabel":16,"stem":652,"options":653,"answer":97,"analysis":37},1149867,"钻孔灌注桩施工时，造成钻孔垂直度不符合规范要求的主要原因有（ ）。",[654,656,658,660,662],{"key":20,"text":655,"correct":22},"场地平整度和密实度差，钻机安装不平整或钻进过程发生不均匀沉降",{"key":24,"text":657,"correct":32},"未在钻杆上加设扶整器",{"key":27,"text":659,"correct":22},"钻杆弯曲、钻杆接头间隙太大",{"key":30,"text":661,"correct":22},"钻头翼板磨损不一，钻头受力不均",{"key":34,"text":663,"correct":22},"钻进遇软硬土层交界面或倾斜岩面时，钻压过高使钻头受力不均",{"id":665,"libraryId":5,"type":15,"typeLabel":16,"stem":666,"options":667,"answer":170,"analysis":37},1149868,"造成钻孔灌注桩塌孔的主要原因有（ ）。",[668,670,672,674,676],{"key":20,"text":669,"correct":22},"地层复杂",{"key":24,"text":671,"correct":22},"钻孔时进尺过快",{"key":27,"text":673,"correct":22},"护壁泥浆性能差",{"key":30,"text":675,"correct":22},"成孔后没有及时灌注",{"key":34,"text":629,"correct":32},{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":170,"analysis":37},1149869,"钻孔灌注桩施工时，由于孔内泥浆悬浮的砂粒太多导致的问题可能有（ ）。",[681,683,685,687,689],{"key":20,"text":682,"correct":22},"桩身混凝土夹渣",{"key":24,"text":684,"correct":22},"灌注混凝土过程钢筋骨架上浮",{"key":27,"text":686,"correct":22},"断桩",{"key":30,"text":688,"correct":22},"灌筑混凝土时堵管",{"key":34,"text":690,"correct":32},"混凝土强度低或离析",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":285,"analysis":37},1149870,"大体积混凝土出现的裂缝，具有危害性的有（ ）。",[695,697,699,701,703],{"key":20,"text":696,"correct":22},"贯穿裂缝",{"key":24,"text":698,"correct":32},"斜裂缝",{"key":27,"text":700,"correct":22},"深层裂缝",{"key":30,"text":702,"correct":32},"直裂缝",{"key":34,"text":704,"correct":32},"表面裂缝",{"id":706,"libraryId":5,"type":15,"typeLabel":16,"stem":707,"options":708,"answer":509,"analysis":37},1149871,"城市桥梁工程大体积混凝土出现的裂缝按深度的不同，分为（ ）裂缝。",[709,711,713,715,717],{"key":20,"text":710,"correct":32},"局部",{"key":24,"text":712,"correct":32},"内层",{"key":27,"text":714,"correct":22},"贯穿",{"key":30,"text":716,"correct":22},"深层",{"key":34,"text":718,"correct":22},"表面",{"id":720,"libraryId":5,"type":15,"typeLabel":16,"stem":721,"options":722,"answer":732,"analysis":37},1149872,"浇筑大体积混凝土产生裂缝的原因有（ ）。",[723,725,727,728,730],{"key":20,"text":724,"correct":32},"混凝土结构体积",{"key":24,"text":726,"correct":22},"水泥水化热引起的温度应力和温度变形",{"key":27,"text":635,"correct":22},{"key":30,"text":729,"correct":22},"气温变化",{"key":34,"text":731,"correct":22},"内外约束条件","BCDE",[734,738,741,744,747,750],{"id":735,"name":736,"category":7,"favorite":737},1,"领导干部任职前廉政法规知识测试题",92,{"id":739,"name":740,"category":7,"favorite":735},595,"建筑结构与设备",{"id":742,"name":743,"category":7,"favorite":735},715,"招标采购专业知识与法律法规",{"id":745,"name":746,"category":7,"favorite":735},848,"市政方向-通用基础",{"id":748,"name":749,"category":7,"favorite":8},534,"BIM工程师",{"id":751,"name":749,"category":7,"favorite":8},535]