[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-37":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,37,50,2019,[13,38,53,68,81,94,109,123,138,153,168,182,196,210,225,239,251,265,280,293,307,322,336,350,365,379,394,408,418,433,447,461,475,489,503,517,531,545,559,573,588,602,614,628,642,656,670,683,697,711],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149773,2,"多选题","为保证评标质量，招标人应根据工程项目的（ ），合理确定评标时间。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","招标计划",false,{"key":24,"text":25,"correct":26},"B","投标人数量",true,{"key":28,"text":29,"correct":26},"C","工程造价",{"key":31,"text":32,"correct":22},"D","总工期",{"key":34,"text":35,"correct":26},"E","复杂程度","BCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149774,"投标文件应当对招标文件（ ）、招标范围等实质性内容做出响应。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"施工工期",{"key":24,"text":45,"correct":26},"投标有效期",{"key":28,"text":47,"correct":26},"质量要求",{"key":31,"text":49,"correct":26},"技术标准",{"key":34,"text":51,"correct":22},"报价要求","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149775,"投标资格审查条件应注重投标人的（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"管理体系",{"key":24,"text":60,"correct":26},"同类项目施工经验",{"key":28,"text":62,"correct":22},"经济效益",{"key":31,"text":64,"correct":26},"近三年业绩",{"key":34,"text":66,"correct":26},"履约情况","BDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},1149776,"工程量和相应工程量费用的计算应依据（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":26},"市场价格",{"key":24,"text":75,"correct":26},"相关定额",{"key":28,"text":77,"correct":26},"计价方法",{"key":31,"text":79,"correct":26},"设计图纸",{"key":34,"text":66,"correct":22},{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":93,"analysis":37},1149777,"计算报价时依据（ ）相关定额及计价方法进行。",[85,87,88,89,91],{"key":20,"text":86,"correct":26},"招标文件",{"key":24,"text":73,"correct":26},{"key":28,"text":79,"correct":26},{"key":31,"text":90,"correct":22},"市场信息",{"key":34,"text":92,"correct":26},"施工组织设计","ABCE",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":108,"analysis":37},1149778,"投标文件中技术部分包括（ ）等内容。",[98,100,102,104,106],{"key":20,"text":99,"correct":26},"主要施工方案",{"key":24,"text":101,"correct":22},"工作程序",{"key":28,"text":103,"correct":26},"安全管理体系及措施",{"key":31,"text":105,"correct":26},"项目管理机构",{"key":34,"text":107,"correct":22},"拟分包项目情况","ACD",{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":122,"analysis":37},1149779,"投标人应按招标人提供的工程量清单填报价格，填写的（ ）及工程量必须与招标人提供的一致。",[113,115,116,118,120],{"key":20,"text":114,"correct":26},"项目特征",{"key":24,"text":73,"correct":22},{"key":28,"text":117,"correct":26},"项目名称",{"key":31,"text":119,"correct":26},"计量单位",{"key":34,"text":121,"correct":26},"项目编码","ACDE",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":137,"analysis":37},1149780,"投标策略是投标人经营决策的组成部分，从投标的全过程分析主要表现有（ ）。",[127,129,131,133,135],{"key":20,"text":128,"correct":26},"生存型",{"key":24,"text":130,"correct":22},"组合型",{"key":28,"text":132,"correct":26},"竞争型",{"key":31,"text":134,"correct":22},"合理型",{"key":34,"text":136,"correct":26},"盈利型","ACE",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":152,"analysis":37},1149781,"技术标书编制重点包括（ ）。",[142,144,146,148,150],{"key":20,"text":143,"correct":26},"施工方案",{"key":24,"text":145,"correct":26},"进度计划及措施",{"key":28,"text":147,"correct":22},"投标人资格",{"key":31,"text":149,"correct":22},"资金使用计划",{"key":34,"text":151,"correct":26},"施工现场总平面图","ABE",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":167,"analysis":37},1149782,"参加开标的授权委托人应携带（ ）和复制件。",[157,159,161,163,165],{"key":20,"text":158,"correct":26},"授权委托书",{"key":24,"text":160,"correct":26},"身份证原件",{"key":28,"text":162,"correct":22},"资质证书",{"key":31,"text":164,"correct":22},"履约记录",{"key":34,"text":166,"correct":22},"主要人员简历","AB",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":36,"analysis":37},1149783,"建设项目总概算是由（ ）汇总编制而成。",[172,174,176,178,180],{"key":20,"text":173,"correct":22},"单位工程概算",{"key":24,"text":175,"correct":26},"各单项工程概算",{"key":28,"text":177,"correct":26},"工程建设其他费用概算",{"key":31,"text":179,"correct":22},"监理费用概算",{"key":34,"text":181,"correct":26},"预备费用概算",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":195,"analysis":37},1149784,"单位工程预算包括（ ）预算和（ ）预算。",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"分部工程",{"key":24,"text":189,"correct":22},"分项工程",{"key":28,"text":191,"correct":22},"附属工程",{"key":31,"text":193,"correct":26},"安装工程",{"key":34,"text":7,"correct":26},"DE",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":93,"analysis":37},1149785,"施工图预算是工程费用调整的依据，一般情况下不得调整，出现以下（ ）情况时可调整。",[200,202,204,206,208],{"key":20,"text":201,"correct":26},"地震灾害",{"key":24,"text":203,"correct":26},"洪水",{"key":28,"text":205,"correct":26},"政策性调整",{"key":31,"text":207,"correct":22},"材料涨价",{"key":34,"text":209,"correct":26},"重大设计变更",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":37},1149786,"关于市政公用工程工程量清单计价有关规定，说法正确的是（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":26},"采取工程量清单计价的建设工程造价主要内容有分部分项工程费、措施项目费、其他项目费、规费、税金",{"key":24,"text":217,"correct":22},"清单项目综合单价包括项目直接费、间接费、利润和风险费用",{"key":28,"text":219,"correct":22},"清单项目综合单价中的风险费用包括施工中可能发生的所有风险费用",{"key":31,"text":221,"correct":26},"竣工结算的工程量按发、承包双方在合同中约定的予以计量且按实际完成的工程量确定",{"key":34,"text":223,"correct":26},"规费和税金不得作为竞争性费用","ADE",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":67,"analysis":37},1149787,"工程量清单报价中，不得作为竞争性费用的有（ ）。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"材料费",{"key":24,"text":232,"correct":26},"安全文明施工费",{"key":28,"text":234,"correct":22},"企业管理费",{"key":31,"text":236,"correct":26},"规费",{"key":34,"text":238,"correct":26},"税金",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":67,"analysis":37},1149788,"我国目前推行的部分费用综合单价不包括（ ）。",[243,245,246,248,249],{"key":20,"text":244,"correct":22},"人工费",{"key":24,"text":238,"correct":26},{"key":28,"text":247,"correct":22},"施工机械费",{"key":31,"text":236,"correct":26},{"key":34,"text":250,"correct":26},"措施费",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":224,"analysis":37},1149789,"各投标人依据招标人提供的工程量清单，根据自身的（ ）填写单价和计算合价。",[255,257,259,261,263],{"key":20,"text":256,"correct":26},"技术能力",{"key":24,"text":258,"correct":22},"合同",{"key":28,"text":260,"correct":22},"劳动组织",{"key":31,"text":262,"correct":26},"管理能力",{"key":34,"text":264,"correct":26},"自身的实力",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":279,"analysis":37},1149790,"因不可抗力事件导致的费用增加，由发包人承担的有（ ）。",[269,271,273,275,277],{"key":20,"text":270,"correct":22},"机械设备的损坏",{"key":24,"text":272,"correct":26},"工程本身的损害",{"key":28,"text":274,"correct":26},"发包人人员伤亡",{"key":31,"text":276,"correct":26},"现场保卫人员费用",{"key":34,"text":278,"correct":22},"施工人员伤亡","BCD",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":292,"analysis":37},1149791,"因不可抗力事件导致的费用增加，由承包人承担的有（ ）。",[284,286,288,289,291],{"key":20,"text":285,"correct":26},"承包人自有机械设备的损坏",{"key":24,"text":287,"correct":22},"工程所需修复费用",{"key":28,"text":274,"correct":22},{"key":31,"text":290,"correct":22},"现场发包人的保卫人员费用",{"key":34,"text":278,"correct":26},"AE",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":93,"analysis":37},1149792,"下述（ ）因素出现后，发承包双方可根据合同约定，对合同价款进行变动的提出、计算和确认。",[297,299,301,303,305],{"key":20,"text":298,"correct":26},"法律法规变化",{"key":24,"text":300,"correct":26},"项目特征不符",{"key":28,"text":302,"correct":26},"工程量偏差",{"key":31,"text":304,"correct":22},"项目经理变更",{"key":34,"text":306,"correct":26},"不可抗力",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":321,"analysis":37},1149793,"施工合同中，发包人的一般义务包括（ ）。",[311,313,315,317,319],{"key":20,"text":312,"correct":26},"发出开工通知",{"key":24,"text":314,"correct":26},"协助办理有关施工证件和批件",{"key":28,"text":316,"correct":26},"组织竣工验收",{"key":31,"text":318,"correct":22},"修补工程中的任何缺陷",{"key":34,"text":320,"correct":22},"工程接受证书颁发前，负责照管和维护工程","ABC",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":137,"analysis":37},1149794,"一般施工合同由（ ）等部分组成。",[326,328,330,332,334],{"key":20,"text":327,"correct":26},"通用条款",{"key":24,"text":329,"correct":22},"施工规范",{"key":28,"text":331,"correct":26},"合同协议书",{"key":31,"text":333,"correct":22},"验收标准",{"key":34,"text":335,"correct":26},"专用条款",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":349,"analysis":37},1149795,"施工合同中，承包人的一般义务包括（ ）。",[340,342,344,345,347],{"key":20,"text":341,"correct":26},"实施、完成全部工作",{"key":24,"text":343,"correct":26},"对施工现场安全性负责",{"key":28,"text":316,"correct":22},{"key":31,"text":346,"correct":26},"除合同另有约定外，提供完成工程所需的劳务、材料、施工设备",{"key":34,"text":348,"correct":22},"组织设计交底","ABD",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":364,"analysis":37},1149796,"施工项目合同管理工作中，依《合同法》规定进行（ ）工作。",[354,356,358,360,362],{"key":20,"text":355,"correct":22},"工程洽商",{"key":24,"text":357,"correct":26},"变更",{"key":28,"text":359,"correct":26},"转让",{"key":31,"text":361,"correct":26},"终止",{"key":34,"text":363,"correct":26},"解除","BCDE",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":52,"analysis":37},1149797,"施工过程中遇到的合同变更，如（ ）等，项目负责人必须掌握变更情况，遵照有关规定及时办理变更手续。",[369,371,373,375,377],{"key":20,"text":370,"correct":26},"标高",{"key":24,"text":372,"correct":26},"工程量增减",{"key":28,"text":374,"correct":26},"基线",{"key":31,"text":376,"correct":26},"质量及特性变更",{"key":34,"text":378,"correct":22},"工种",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":393,"analysis":37},1149798,"承包方必须掌握有关法律政策和索赔知识，进行索赔须有（ ）。",[383,385,387,389,391],{"key":20,"text":384,"correct":26},"正当索赔理由",{"key":24,"text":386,"correct":26},"充分证据",{"key":28,"text":388,"correct":22},"向发包方发出的索赔意向通知",{"key":31,"text":390,"correct":26},"计算工期、费用",{"key":34,"text":392,"correct":26},"准确、合理地记录索赔事件","ABDE",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":224,"analysis":37},1149799,"由于工程投标时图纸不全，发生以承包方能力不可预见引起的索赔包括（ ）等。",[398,400,402,404,406],{"key":20,"text":399,"correct":26},"地质情况不清",{"key":24,"text":401,"correct":22},"征地拆迁",{"key":28,"text":403,"correct":22},"施工条件改变",{"key":31,"text":405,"correct":26},"工程量增加",{"key":34,"text":407,"correct":26},"施工工艺改变",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":321,"analysis":37},1149800,"属发包方原因，由于外部环境影响引起的索赔包括（ ）等。",[412,414,415,416,417],{"key":20,"text":413,"correct":26},"用地的出入权",{"key":24,"text":401,"correct":26},{"key":28,"text":403,"correct":26},{"key":31,"text":405,"correct":22},{"key":34,"text":407,"correct":22},{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":432,"analysis":37},1149801,"施工过程中的工程索赔主要是（ ）索赔。",[422,424,426,428,430],{"key":20,"text":423,"correct":26},"工期",{"key":24,"text":425,"correct":22},"设备",{"key":28,"text":427,"correct":26},"费用",{"key":31,"text":429,"correct":22},"设计不合理",{"key":34,"text":431,"correct":22},"材料不合格","AC",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":349,"analysis":37},1149802,"索赔台账应反映（ ）内容。",[437,439,441,443,445],{"key":20,"text":438,"correct":26},"索赔发生原因",{"key":24,"text":440,"correct":26},"索赔意向提交时间",{"key":28,"text":442,"correct":22},"各种记录",{"key":31,"text":444,"correct":26},"监理审核结果",{"key":34,"text":446,"correct":22},"总包方审批结果",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":52,"analysis":37},1149803,"同期记录的内容包括（ ）。",[451,453,455,457,459],{"key":20,"text":452,"correct":26},"人员设备闲置",{"key":24,"text":454,"correct":26},"对工期的延误",{"key":28,"text":456,"correct":26},"对工程损害程度",{"key":31,"text":458,"correct":26},"导致费用增加的项目",{"key":34,"text":460,"correct":22},"计算资料",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":279,"analysis":37},1149804,"索赔申请表应填写（ ）内容。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"设备闲置清单",{"key":24,"text":468,"correct":26},"索赔项目",{"key":28,"text":470,"correct":26},"索赔金额和日期",{"key":31,"text":472,"correct":26},"证明文件",{"key":34,"text":474,"correct":22},"有效票据",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":137,"analysis":37},1149805,"合同风险管理的主要内容有（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":26},"风险分析和预测",{"key":24,"text":482,"correct":22},"商务风险",{"key":28,"text":484,"correct":26},"风险预防措施",{"key":31,"text":486,"correct":22},"经济风险",{"key":34,"text":488,"correct":26},"风险控制",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":122,"analysis":37},1149806,"合同风险的规避措施有（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":26},"增设保值条款",{"key":24,"text":496,"correct":22},"减少分包方资金",{"key":28,"text":498,"correct":26},"增设风险合同条款",{"key":31,"text":500,"correct":26},"加强索赔管理",{"key":34,"text":502,"correct":26},"增设有关支付条款",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":52,"analysis":37},1149807,"施工成本管理按照类型分，有（ ）等方面。",[507,509,511,513,515],{"key":20,"text":508,"correct":26},"计划管理",{"key":24,"text":510,"correct":26},"施工组织管理",{"key":28,"text":512,"correct":26},"劳务费用管理",{"key":31,"text":514,"correct":26},"合同管理",{"key":34,"text":516,"correct":22},"成本耗费",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":167,"analysis":37},1149808,"施工企业的全部管理工作的实质就是运用科学的管理手段，（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":26},"最大限度地降低工程成本",{"key":24,"text":524,"correct":26},"获取较大利润",{"key":28,"text":526,"correct":22},"生产最多的产品",{"key":31,"text":528,"correct":22},"获得更多的奖励",{"key":34,"text":530,"correct":22},"得到更多的赞扬",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":122,"analysis":37},1149809,"为做好施工成本管理工作，必须做好（ ）等方面工作。",[535,537,539,541,543],{"key":20,"text":536,"correct":26},"加强成本管理观念",{"key":24,"text":538,"correct":22},"加强过程控制",{"key":28,"text":540,"correct":26},"完善原始记录和统计工作",{"key":31,"text":542,"correct":26},"建立考核和激励机制",{"key":34,"text":544,"correct":26},"建立健全责任制度",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":137,"analysis":37},1149810,"施工成本核算的对象是指在计算工程成本中，确定、归集和分配产生费用的具体对象，即产生费用承担的客体；划分成本核算对象正确的有（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":26},"一个单位工程由几个施工单位共同施工时，各施工单位都以同一单位工程为成本核算对象",{"key":24,"text":552,"correct":22},"规模大、工期长的单位工程，可以将工程划分为若干部位，但仍以单位工程作为成本核算对象",{"key":28,"text":554,"correct":26},"同一建设项目，又由同一施工单位施工，并在同一施工地点，属同一结构类型，开竣工时间相近的若干单位工程，可以合并作为一个成本核算对象",{"key":31,"text":556,"correct":22},"改建、扩建的零星工程，可以将开竣工时间相近，属于同一建设项目的各个单位工程合并，但仍以各个单位工程作为成本核算对象",{"key":34,"text":558,"correct":26},"土石方工程、桩基工程，可以根据实际情况和管理需要，以一个单位工程或合并若干单位工程为成本核算对象",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":393,"analysis":37},1149811,"以下选项中关于施工成本分析的任务说法正确的是（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":26},"找出产生差异的原因",{"key":24,"text":566,"correct":26},"提出进一步降低成本的措施和方案",{"key":28,"text":568,"correct":22},"按统计方法加以系统整理，探索规律性",{"key":31,"text":570,"correct":26},"对成本计划的执行情况进行正确评价",{"key":34,"text":572,"correct":26},"正确计算成本计划的执行结果，计算产生的差异",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":587,"analysis":37},1149812,"按成本项目进行的成本分析有（ ）。",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"工期成本分析",{"key":24,"text":580,"correct":22},"资金成本分析",{"key":28,"text":582,"correct":26},"间接成本分析",{"key":31,"text":584,"correct":22},"竣工成本分析",{"key":34,"text":586,"correct":26},"材料费分析","CE",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":432,"analysis":37},1149813,"市政公用工程项目的施工组织设计是市政公用工程施工项目管理的重要内容，应经（ ），且在施工前编制。",[592,594,596,598,600],{"key":20,"text":593,"correct":26},"现场踏勘",{"key":24,"text":595,"correct":22},"充分论证",{"key":28,"text":597,"correct":26},"现场调研",{"key":31,"text":599,"correct":22},"合理组织",{"key":34,"text":601,"correct":22},"合理规划",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":137,"analysis":37},1149814,"施工组织设计必须做到（ ），以期企业获得应有的利润。",[606,608,609,611,612],{"key":20,"text":607,"correct":26},"科学合理",{"key":24,"text":595,"correct":22},{"key":28,"text":610,"correct":26},"技术先进",{"key":31,"text":601,"correct":22},{"key":34,"text":613,"correct":26},"费用经济",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":364,"analysis":37},1149815,"施工总平面布置图，应标明拟建工程（ ）等。",[618,620,622,624,626],{"key":20,"text":619,"correct":22},"消防区",{"key":24,"text":621,"correct":26},"预制场地",{"key":28,"text":623,"correct":26},"生产区",{"key":31,"text":625,"correct":26},"生活区",{"key":34,"text":627,"correct":26},"材料堆场位置",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":52,"analysis":37},1149816,"对于施工方案主要内容，以下表述正确的有（ ）。",[632,634,636,638,640],{"key":20,"text":633,"correct":26},"施工方法（工艺）一经确定，机具设备和材料的选择就只能以满足它的要求为基本依据",{"key":24,"text":635,"correct":26},"施工机具选择的好与坏很大程度上决定了施工方法的优劣",{"key":28,"text":637,"correct":26},"施工组织是研究施工项目施工过程中各种资源合理组织的科学",{"key":31,"text":639,"correct":26},"施工顺序安排得好，可以加快施工进度",{"key":34,"text":641,"correct":22},"技术组织是保证选择的施工方案实施的措施，包括加快施工进度、保证工程质量、施工安全及人员安排等方面",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":93,"analysis":37},1149817,"技术组织措施是施工企业为完成施工任务，为（ ）在技术上和组织上所采取的措施。",[646,648,650,652,654],{"key":20,"text":647,"correct":26},"加快施工进度",{"key":24,"text":649,"correct":26},"保证工程质量",{"key":28,"text":651,"correct":26},"降低工程成本",{"key":31,"text":653,"correct":22},"保证文明施工",{"key":34,"text":655,"correct":26},"保证施工安全",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":167,"analysis":37},1149818,"正确地选择施工方法是确定施工方案的关键，应从若干可行的施工方法中选择（ ）的施工方法。",[660,662,664,666,668],{"key":20,"text":661,"correct":26},"最可行",{"key":24,"text":663,"correct":26},"最经济",{"key":28,"text":665,"correct":22},"最安全",{"key":31,"text":667,"correct":22},"最先进",{"key":34,"text":669,"correct":22},"最成熟",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":432,"analysis":37},1149819,"选择施工方法的依据正确的有（ ）。",[674,676,677,679,681],{"key":20,"text":675,"correct":26},"工程特点",{"key":24,"text":47,"correct":22},{"key":28,"text":678,"correct":26},"工期要求",{"key":31,"text":680,"correct":22},"文明施工",{"key":34,"text":682,"correct":22},"安全要求",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":137,"analysis":37},1149820,"危险性较大工程包括（ ）应编制专项施工方案。",[687,689,691,693,695],{"key":20,"text":688,"correct":26},"脚手架工程",{"key":24,"text":690,"correct":22},"焊接工程",{"key":28,"text":692,"correct":26},"模板工程",{"key":31,"text":694,"correct":22},"装饰工程",{"key":34,"text":696,"correct":26},"拆除、爆破工程",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":432,"analysis":37},1149821,"高大模板工程中（ ）需要进行专家论证审查。",[701,703,705,707,709],{"key":20,"text":702,"correct":26},"水平构件模板支撑体系高度超过8m",{"key":24,"text":704,"correct":22},"超过2层楼高度",{"key":28,"text":706,"correct":26},"水平混凝土构件跨度大于18m",{"key":31,"text":708,"correct":22},"集中线荷载大于15kN\u002Fm",{"key":34,"text":710,"correct":22},"施工总荷载大于10kN\u002Fm2",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":725,"analysis":37},1149822,"施工占用慢行道和便道要获得（ ）部门的批准。",[715,717,719,721,723],{"key":20,"text":716,"correct":22},"桥梁管理",{"key":24,"text":718,"correct":26},"交通管理",{"key":28,"text":720,"correct":26},"道路管理",{"key":31,"text":722,"correct":22},"建设管理",{"key":34,"text":724,"correct":22},"规划管理","BC",[727,731,734,737,740,743],{"id":728,"name":729,"category":7,"favorite":730},1,"领导干部任职前廉政法规知识测试题",92,{"id":732,"name":733,"category":7,"favorite":728},595,"建筑结构与设备",{"id":735,"name":736,"category":7,"favorite":728},715,"招标采购专业知识与法律法规",{"id":738,"name":739,"category":7,"favorite":728},848,"市政方向-通用基础",{"id":741,"name":742,"category":7,"favorite":8},534,"BIM工程师",{"id":744,"name":742,"category":7,"favorite":8},535]