[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-36":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,36,50,2019,[13,38,53,68,82,97,112,127,141,155,169,184,199,214,229,243,257,271,283,297,312,326,340,354,369,383,397,412,426,440,454,468,483,498,513,527,541,555,569,583,597,611,626,640,654,668,683,695,709,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149723,2,"多选题","地下燃气管道埋设的最小覆土厚度（路面至管顶）应符合下列哪些要求（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","埋设在车行道下时，不得小于0.9m",true,{"key":24,"text":25,"correct":26},"B","埋设在车行道下时，不得小于0.5m",false,{"key":28,"text":29,"correct":22},"C","埋设在非车行道下时，不得小于0.6m",{"key":31,"text":32,"correct":26},"D","埋设在非车行道下时，不得小于0.5m",{"key":34,"text":35,"correct":22},"E","埋设在水田下时，不得小于0.8m","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149724,"穿越铁路的燃气管道的套管应符合下列哪些要求（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"铁路轨道至套管顶不应小于1.20m，并应符合铁路管理部门的要求",{"key":24,"text":45,"correct":22},"套管宜采用钢管或者钢筋混凝土管",{"key":28,"text":47,"correct":26},"套管内径应比燃气管道外径大50mm以上",{"key":31,"text":49,"correct":22},"套管两端与燃气管的间隙应采用柔性的防腐、防水材料密封，其一端应装设检漏管",{"key":34,"text":51,"correct":22},"套管端部距路坡脚外距离不应小于2.0m","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149725,"燃气管道穿越河底时，应附合下列要求：（ ）",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"在埋设燃气管道位置的河流两岸上,下游应设标志",{"key":24,"text":60,"correct":26},"管道对接安装引起的误差不得大于5°",{"key":28,"text":62,"correct":22},"宜采用钢管",{"key":31,"text":64,"correct":22},"不通航时，燃气管道至河底最小覆土厚度不应小于0.5m",{"key":34,"text":66,"correct":22},"通航时，燃气管道至河底最小覆土厚度不应小于1.0m，还应考虑疏浚和投锚深度","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},1149726,"为了确保管网运行安全，并考虑到检修、接线的需要，要在管道的适当地点设置必要的附属设施，包括下面的哪些（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"阀门",{"key":24,"text":75,"correct":26},"旁通管",{"key":28,"text":77,"correct":22},"补偿器",{"key":31,"text":79,"correct":22},"凝水缸",{"key":34,"text":81,"correct":22},"放散管",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1149727,"下面关于燃气管道吹扫，叙述中正确的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":26},"管道及其附件组装完成并试压合格后，应进行通球扫线，并不少于两次",{"key":24,"text":89,"correct":26},"每次吹扫管道长度不宜超过1km，通球应按介质流动方向进行",{"key":28,"text":91,"correct":22},"扫线结果可用贴有纸或白漆的木靶板置于吹扫口检查",{"key":31,"text":93,"correct":26},"1min内没有铁锈脏物则认为合格",{"key":34,"text":95,"correct":22},"管道吹扫后将集存在阀室放散管内的脏物排出，清扫干净","CE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},1149728,"燃气管道在安装过程中需要进行压力试验，压力试验根据检验目的可以分为（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":26},"功能性试验",{"key":24,"text":104,"correct":22},"严密性试验",{"key":28,"text":106,"correct":22},"强度试验",{"key":31,"text":108,"correct":26},"通球试验",{"key":34,"text":110,"correct":26},"外观检查","BC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1149729,"下面关于燃气管道强度试验的叙述中正确的包括（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"除聚乙烯管外试验压力为设计压力1.5倍，但不得低于0.4MPa",{"key":24,"text":119,"correct":26},"钢管的试验压力不得低于0.3MPa",{"key":28,"text":121,"correct":26},"化工管的试验压力不得低于0.5MPa",{"key":31,"text":123,"correct":22},"当压力达到规定值后，应稳压1h，然后用肥皂水对管道接口进行检查，全部接口均无漏气现象为合格",{"key":34,"text":125,"correct":26},"若有漏气处，可带气维修，修复后再次试验，直至合格","AD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":52,"analysis":37},1149730,"气密性试验压力根据管道设计输气压力而定，下面关于试验压力的叙述中正确的包括（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"当设计输气压力P＜5kPa时.试验压力为20kPa",{"key":24,"text":134,"correct":22},"当设计输气压力P＞5kPa时，试验压力为设计压力的1.15倍，且不得小于0.1MPa",{"key":28,"text":136,"correct":26},"当设计输气压力P＞5kPa时，试验压力为20kPa",{"key":31,"text":138,"correct":22},"当设计输气压力P=5kPa时，试验压力应为设计压力的1.15倍，试验压力不得低于0.1MPa",{"key":34,"text":140,"correct":22},"燃气管道的气密性试验持续时间一般不少于24h",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":126,"analysis":37},1149731,"燃气管道做气密性试验需具备以下（ ）条件才可进行。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"燃气管道全部安装完毕后",{"key":24,"text":148,"correct":26},"燃气管道安装一段后",{"key":28,"text":150,"correct":26},"燃气管道安装完毕，但不必回填",{"key":31,"text":152,"correct":22},"埋地敷设时，必须回填至管顶0.5m以上",{"key":34,"text":154,"correct":26},"试验压力小于5kPa时，试验压力应为30kPa",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":67,"analysis":37},1149732,"地下燃气管道穿越或邻近既有建筑物、构筑物施工时，必须符合规定，以下选项中说法正确的是（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"地下燃气管道不得从大型构筑物下面穿越",{"key":24,"text":162,"correct":26},"地下燃气管道可以从建筑物下面穿越",{"key":28,"text":164,"correct":22},"地下燃气管道与建筑物，构筑物基础之间应保持规定的安全距离",{"key":31,"text":166,"correct":22},"无法满足安全距离时，应将地下燃气管道敷设在管道沟中",{"key":34,"text":168,"correct":22},"无法满足安全距离时，应将地下燃气管道敷设在钢性套管中",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1149733,"当遇到下列情况之一时，如（），宜采用综合管廊形式规划建设。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"交通运输繁忙或地下管线较多的城市主干道",{"key":24,"text":176,"correct":22},"城市核心区、中央商务区、地下空间高强度成片集中开发区、重要广场、主要道路的交叉口、道路与铁路或河流的交叉处、过江隧道等。",{"key":28,"text":178,"correct":22},"不宜开挖路面的路段",{"key":31,"text":180,"correct":26},"公共空间",{"key":34,"text":182,"correct":22},"道路宽度难以满足直埋敷设多种管线的路段","ABCE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1149734,"综合管廊分为（）。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"干线综合管廊",{"key":24,"text":191,"correct":22},"支线综合管廊",{"key":28,"text":193,"correct":22},"缆线综合管廊",{"key":31,"text":195,"correct":26},"节点综合管廊",{"key":34,"text":197,"correct":26},"分支综合管廊","ABC",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},1149735,"综合管廊每个舱室应设置()等。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"人员出入口和逃生口",{"key":24,"text":206,"correct":22},"管线分支口",{"key":28,"text":208,"correct":22},"吊装口",{"key":31,"text":210,"correct":22},"进风口",{"key":34,"text":212,"correct":26},"排烟口","ABCD",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},1149736,"缆线综合管廊可用于容纳（）的管廊。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"电力电缆",{"key":24,"text":221,"correct":22},"通信线缆",{"key":28,"text":223,"correct":26},"天然气",{"key":31,"text":225,"correct":26},"给水",{"key":34,"text":227,"correct":26},"再生水","AB",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":111,"analysis":37},1149737,"支线综合管廊采用（）方式建设的综合管廊。",[233,235,237,239,241],{"key":20,"text":234,"correct":26},"独立分舱",{"key":24,"text":236,"correct":22},"单舱",{"key":28,"text":238,"correct":22},"双舱",{"key":31,"text":240,"correct":26},"浅埋沟道",{"key":34,"text":242,"correct":26},"多舱",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":198,"analysis":37},1149738,"综合管廊的标准断面形式应根据容纳的管线种类及规模、建设方式、预留空间等确定，应满足管线（）作业所需要的空间要求。",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"安装",{"key":24,"text":250,"correct":22},"检修",{"key":28,"text":252,"correct":22},"维护",{"key":31,"text":254,"correct":26},"分支",{"key":34,"text":256,"correct":26},"应急",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":213,"analysis":37},1149739,"综合管廊附属设施包括（），排水系统，标识系统等。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"供电与照明系统",{"key":24,"text":264,"correct":22},"监控与报警系统",{"key":28,"text":266,"correct":22},"消防系统",{"key":31,"text":268,"correct":22},"通风系统",{"key":34,"text":270,"correct":26},"人员进出门禁系统",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":213,"analysis":37},1149740,"综合管廊应统一（），并应满足管线的使用和运营维护要求，纳入综合管廊的管线应有专项管线设计。",[275,277,279,281,282],{"key":20,"text":276,"correct":22},"规划",{"key":24,"text":278,"correct":22},"设计",{"key":28,"text":280,"correct":22},"施工",{"key":31,"text":252,"correct":22},{"key":34,"text":250,"correct":26},{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":228,"analysis":37},1149741,"综合管廊结构类型分（）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"现浇混凝土综合管廊",{"key":24,"text":290,"correct":22},"预制拼装综合管廊",{"key":28,"text":292,"correct":26},"暗挖综合管廊",{"key":31,"text":294,"correct":26},"明挖综合管廊口",{"key":34,"text":296,"correct":26},"盾构综合管廊",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":311,"analysis":37},1149742,"综合管廊主要施工方法（）等。",[301,303,305,307,309],{"key":20,"text":302,"correct":26},"现浇法",{"key":24,"text":304,"correct":22},"明挖法",{"key":28,"text":306,"correct":22},"盖挖法",{"key":31,"text":308,"correct":22},"盾构法",{"key":34,"text":310,"correct":22},"锚喷暗挖法","BCDE",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":198,"analysis":37},1149743,"综合管廊投入运营后应定期检测评定，对（）的运行状况应进行安全评估，并应及时处理安全隐患。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"综合管廊主体",{"key":24,"text":319,"correct":22},"附属设施",{"key":28,"text":321,"correct":22},"内部管线设施",{"key":31,"text":323,"correct":26},"运营维护",{"key":34,"text":325,"correct":26},"综合管廊日常管理单位",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":213,"analysis":37},1149744,"采用填埋法处理垃圾时，填埋区防渗层的常用防渗材料有()。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"黏土",{"key":24,"text":333,"correct":22},"膨润土",{"key":28,"text":335,"correct":22},"土工膜",{"key":31,"text":337,"correct":22},"土工织物膨润土垫(GCL)",{"key":34,"text":339,"correct":26},"混凝土",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":126,"analysis":37},1149745,"泥质防水层施工质量检验应严格按照合同约定的检验频率和质量检验标准同步进行，检验项目包括()。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"压实度",{"key":24,"text":347,"correct":26},"密封",{"key":28,"text":349,"correct":26},"化学稳定性",{"key":31,"text":351,"correct":22},"渗水",{"key":34,"text":353,"correct":26},"厚度",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":368,"analysis":37},1149746,"下列工序中，属于GCL垫施工主要内容的是()。",[358,360,362,364,366],{"key":20,"text":359,"correct":26},"吊运就位",{"key":24,"text":361,"correct":22},"GCL垫的摊铺",{"key":28,"text":363,"correct":22},"搭接宽度控制",{"key":31,"text":365,"correct":22},"搭接处两层GCL垫间撒膨润土",{"key":34,"text":367,"correct":26},"保护层摊铺","BCD",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":36,"analysis":37},1149747,"高密度聚乙烯（HDP E）防渗膜具有（）特点。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"防渗效果极强",{"key":24,"text":376,"correct":26},"施工受天气影响小",{"key":28,"text":378,"correct":22},"寿命长",{"key":31,"text":380,"correct":26},"造价低廉",{"key":34,"text":382,"correct":22},"不易破坏",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":183,"analysis":37},1149748,"下列关于GCL垫施工质量控制要点说法正确的是()。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"施工前均对基底进行修整和检验",{"key":24,"text":390,"correct":22},"GCL垫摊铺搭接宽度控制在250±50mm范围内，搭接处均匀撒膨润土粉，将两层垫间密封",{"key":28,"text":392,"correct":22},"GCL垫应无褶皱、无悬空现象，与基础层贴实",{"key":31,"text":394,"correct":26},"基底应顺设计坡向铺设GCL垫，采用十字或品形的上压下的搭接方式",{"key":34,"text":396,"correct":22},"GCL垫需当日铺设当日覆盖，避免雨雪天气施工，必要时采取覆盖防护措施",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":411,"analysis":37},1149749,"下列关于HDPE膜焊缝非破坏性检验方法说法正确的是（）。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"真空检测",{"key":24,"text":404,"correct":26},"剥离试验",{"key":28,"text":406,"correct":22},"气压检测",{"key":31,"text":408,"correct":22},"电火花检测",{"key":34,"text":410,"correct":26},"剪切试验","ACD",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":67,"analysis":37},1149750,"当垃圾填埋场采用HDPE膜防渗技术时，HDPE防渗膜铺设施工要点有（）。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"先边坡后场底",{"key":24,"text":419,"correct":26},"在HDPE膜调整过程中可使用普通钳子拉拽",{"key":28,"text":421,"correct":22},"斜坡上不出现横缝",{"key":31,"text":423,"correct":22},"外露的HDPE膜边缘应及时用沙袋或其他重物压上",{"key":34,"text":425,"correct":22},"铺设表面应平整、没有残渣、棱角或锋利的岩石",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":368,"analysis":37},1149751,"关于生活垃圾填埋场HDPE膜铺设的做法，错误的有()。",[430,432,434,436,438],{"key":20,"text":431,"correct":26},"总体施工顺序一般为“先边坡，后场底”",{"key":24,"text":433,"correct":22},"冬期施工时应有防冻措施",{"key":28,"text":435,"correct":22},"铺设时应反复展开并拖动，以保证铺设平整",{"key":31,"text":437,"correct":22},"HDPE膜施工完成后应立即转入下一工序，以形成对HDPE膜的覆盖和保护",{"key":34,"text":439,"correct":26},"应及时收集整理施工记录表",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":213,"analysis":37},1149752,"垃圾填埋场的选址，应考虑()等因素，位置选择得好，直接体现在投资成本和社会环境效益上。",[444,446,448,450,452],{"key":20,"text":445,"correct":22},"地质结构",{"key":24,"text":447,"correct":22},"地理水文",{"key":28,"text":449,"correct":22},"运距",{"key":31,"text":451,"correct":22},"风向",{"key":34,"text":453,"correct":26},"符合当地城乡建设总体规划要求",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":213,"analysis":37},1149753,"垃圾填埋场选址时应该慎重，注意对环境的影响，()。",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"必须远离饮用水源",{"key":24,"text":461,"correct":22},"尽量少占良田",{"key":28,"text":463,"correct":22},"利用当地地形地势",{"key":31,"text":465,"correct":22},"利用荒地",{"key":34,"text":467,"correct":26},"把减少投资放在重要考虑因素之首",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":482,"analysis":37},1149754,"下列关于垃圾填埋场有关技术规定说法正确的是()。",[472,474,476,478,480],{"key":20,"text":473,"correct":26},"封闭型垃圾填埋要求严格限制渗滤液渗入地下水层中，严格杜绝对地下水的污染",{"key":24,"text":475,"correct":26},"按照国内要求，填埋场可进行垂直和水平防渗处理",{"key":28,"text":477,"correct":26},"填埋场应重点考虑防止对地下水和地表水的污染，不必单独考虑地下水进入填埋区",{"key":31,"text":479,"correct":22},"填埋场内应铺设防渗层、渗滤液收集系统、雨水和地下水的排水系统",{"key":34,"text":481,"correct":22},"生活垃圾填埋场必须采用HDPE膜和黏土矿物相结合的复合系统进行水平防渗","DE",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":497,"analysis":37},1149755,"当垃圾填埋场采用泥质防渗层防水技术时，防渗层施工控制要点有()等项内容。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"膨润土进货质量",{"key":24,"text":490,"correct":26},"参加施工的人数",{"key":28,"text":492,"correct":26},"施工机械的完好率",{"key":31,"text":494,"correct":22},"膨润土掺加量的确定",{"key":34,"text":496,"correct":22},"质量检验","ADE",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":512,"analysis":37},1149756,"当贯通面一侧隧道长度大于1km时，一般可采取（）方法提高定向测量精度。",[502,504,506,508,510],{"key":20,"text":503,"correct":26},"增加角度测回数",{"key":24,"text":505,"correct":26},"采用精密仪器",{"key":28,"text":507,"correct":22},"钻孔投测坐标点",{"key":31,"text":509,"correct":22},"加测陀螺方位角",{"key":34,"text":511,"correct":26},"加强联系测量","CD",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":198,"analysis":37},1149757,"场区平面控制网按类型分为()。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"方格网",{"key":24,"text":520,"correct":22},"边角网",{"key":28,"text":522,"correct":22},"导线测量控制网",{"key":31,"text":524,"correct":26},"大地控制网",{"key":34,"text":526,"correct":26},"轴线网",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":111,"analysis":37},1149758,"圆形建（构）筑物应据其圆心施放()控制线。",[531,533,535,537,539],{"key":20,"text":532,"correct":26},"中心",{"key":24,"text":534,"correct":22},"轴线",{"key":28,"text":536,"correct":22},"外轮廓线",{"key":31,"text":538,"correct":26},"环线",{"key":34,"text":540,"correct":26},"半径",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":36,"analysis":37},1149759,"场区高程控制网应布设成()、()或()。",[545,547,549,551,553],{"key":20,"text":546,"correct":22},"附合环线",{"key":24,"text":548,"correct":26},"附合星型",{"key":28,"text":550,"correct":22},"附合路线",{"key":31,"text":552,"correct":26},"闭合路线",{"key":34,"text":554,"correct":22},"闭合环线",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":482,"analysis":37},1149760,"竣工总图编绘完成后，应经()审核、会签",[559,561,563,565,567],{"key":20,"text":560,"correct":26},"建设单位技术负责人",{"key":24,"text":562,"correct":26},"设计单位技术负责人",{"key":28,"text":564,"correct":26},"施工单位技术负责人",{"key":31,"text":566,"correct":22},"监理单位总监理工程师",{"key":34,"text":568,"correct":22},"施工单位项目技术负责人",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":213,"analysis":37},1149761,"下列哪些是绘制竣工图的依据()。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"设计总平面图、单位工程平面图、纵横断面图",{"key":24,"text":576,"correct":22},"设计变更资料",{"key":28,"text":578,"correct":22},"控制测量资料",{"key":31,"text":580,"correct":22},"施工检查测量及竣工测量资料",{"key":34,"text":582,"correct":26},"施工组织设计",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":497,"analysis":37},1149762,"城市道路竣工中，（ ）设施的竣工测量应在施工中进行。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"过街管道",{"key":24,"text":590,"correct":26},"过街天桥",{"key":28,"text":592,"correct":26},"道路中线",{"key":31,"text":594,"correct":22},"路边沟道",{"key":34,"text":596,"correct":22},"立交桥附属的地下管线",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":213,"analysis":37},1149763,"基坑工程巡视检查应包括以下主要内容（）。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"支护结构",{"key":24,"text":604,"correct":22},"施工工况",{"key":28,"text":606,"correct":22},"基坑周边环境",{"key":31,"text":608,"correct":22},"监控量测设施",{"key":34,"text":610,"correct":26},"监控量测设备保护措施",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":625,"analysis":37},1149764,"基坑工程监控量测报警值应以监控量测项目的（）两个值控制。",[615,617,619,621,623],{"key":20,"text":616,"correct":22},"变化速率",{"key":24,"text":618,"correct":26},"日变化量",{"key":28,"text":620,"correct":22},"累计变化量",{"key":31,"text":622,"correct":26},"变化量",{"key":34,"text":624,"correct":26},"变化量、观测值","AC",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":213,"analysis":37},1149765,"阶段性监控量测报告应包括（）。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"该监控量测期相应的工程、气象及周边环境概况",{"key":24,"text":633,"correct":22},"该监控量测期的监控量测项目及测点的布置图",{"key":28,"text":635,"correct":22},"各项监控量测数据的整理、统计及监控量测成果的过程曲线",{"key":31,"text":637,"correct":22},"各监控量测项目监控量测值的变化分析、评价及发展预测",{"key":34,"text":639,"correct":26},"周边现况交通情况检测",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":228,"analysis":37},1149766,"依法公开招标的工程，应本着（ ）的原则，依据《建设工程工程量清单计价规范》GB 50500-2013的规定编制清单或计价。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"严格",{"key":24,"text":647,"correct":22},"准确",{"key":28,"text":649,"correct":26},"科学",{"key":31,"text":651,"correct":26},"合理",{"key":34,"text":653,"correct":26},"全面",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":411,"analysis":37},1149767,"招标文件主要内容有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"投标人须知",{"key":24,"text":661,"correct":26},"招标与评标",{"key":28,"text":663,"correct":22},"合同主要条款",{"key":31,"text":665,"correct":22},"评标标准",{"key":34,"text":667,"correct":26},"招标计划",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":682,"analysis":37},1149768,"市政工程投标文件经济部分内容有（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":26},"投标保证金",{"key":24,"text":675,"correct":22},"已标价的工程量",{"key":28,"text":677,"correct":22},"投标报价",{"key":31,"text":679,"correct":26},"资金风险管理体系及措施",{"key":34,"text":681,"correct":22},"拟分包项目情况","BCE",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":694,"analysis":37},1149769,"投标文件中经济部分包括()等内容。",[687,688,690,692,693],{"key":20,"text":677,"correct":22},{"key":24,"text":689,"correct":22},"已标价的工程量清单",{"key":28,"text":691,"correct":26},"成本管理措施",{"key":31,"text":673,"correct":26},{"key":34,"text":681,"correct":22},"ABE",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":411,"analysis":37},1149770,"符合公开招标条件，有下列（ ）情形之一的，经批准可以邀请招标。",[699,701,703,705,707],{"key":20,"text":700,"correct":22},"受自然地域环境限制的",{"key":24,"text":702,"correct":26},"国有企业新建办公楼",{"key":28,"text":704,"correct":22},"涉及国家安全，适宜招标但不宜公开招标",{"key":31,"text":706,"correct":22},"只有少量几家潜在投标人",{"key":34,"text":708,"correct":26},"国际金融组织提供贷款的",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":723,"analysis":37},1149771,"工程项目招标，应满足的部分依据为（ ）。",[713,715,717,719,721],{"key":20,"text":714,"correct":26},"施工图设计已完成",{"key":24,"text":716,"correct":22},"招标人已经依法成立",{"key":28,"text":718,"correct":26},"技术措施已完备",{"key":31,"text":720,"correct":22},"初步设计及概算应当履行审批手续的，已经批准",{"key":34,"text":722,"correct":22},"招标范围、招标方式和招标组织形式等应当履行核准手续的，巳经核准","BDE",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":198,"analysis":37},1149772,"确定分包项目执行的规范标准和质量验收标准，应依据（ ）。",[728,730,732,734,736],{"key":20,"text":729,"correct":22},"工程技术",{"key":24,"text":731,"correct":22},"设计要求",{"key":28,"text":733,"correct":22},"有关规范",{"key":31,"text":735,"correct":26},"合同形式",{"key":34,"text":737,"correct":26},"分包模式",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]