[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-34":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,34,50,2019,[13,38,53,63,78,92,105,120,135,148,163,176,191,205,220,235,248,263,277,291,305,319,333,347,361,375,389,403,418,433,447,461,475,489,503,517,531,545,559,574,588,602,617,632,646,660,672,686,700,712],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149623,2,"多选题","水中杂质按颗粒大小以及存在形态分为（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","悬浮物质",true,{"key":24,"text":25,"correct":26},"B","微生物",false,{"key":28,"text":29,"correct":26},"C","颗粒态物质",{"key":31,"text":32,"correct":22},"D","胶体",{"key":34,"text":35,"correct":22},"E","溶解物质","ADE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149624,"下列属于给水的化学氧化法预处理技术的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"氯气预氧化",{"key":24,"text":45,"correct":22},"高锰酸钾氧化",{"key":28,"text":47,"correct":22},"紫外光氧化",{"key":31,"text":49,"correct":22},"臭氧氧化",{"key":34,"text":51,"correct":26},"活性炭吸附","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},1149625,"给水预处理方法中化学氧化法预处理技术主要有（ ）。",[57,58,59,60,61],{"key":20,"text":43,"correct":22},{"key":24,"text":45,"correct":22},{"key":28,"text":47,"correct":22},{"key":31,"text":49,"correct":22},{"key":34,"text":62,"correct":26},"生物膜法",{"id":64,"libraryId":5,"type":15,"typeLabel":16,"stem":65,"options":66,"answer":77,"analysis":37},1149626,"给水处理的目的是去除或降低原水中的（ ）。",[67,69,71,73,75],{"key":20,"text":68,"correct":26},"各种离子浓度",{"key":24,"text":70,"correct":22},"有害细菌生物",{"key":28,"text":72,"correct":22},"胶体物质",{"key":31,"text":74,"correct":26},"盐分",{"key":34,"text":76,"correct":22},"悬浮物","BCE",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":91,"analysis":37},1149627,"下列属于城市污水的物理处理方法的是（ ）。",[82,84,86,88,90],{"key":20,"text":83,"correct":26},"活性污泥法",{"key":24,"text":85,"correct":22},"筛滤截留",{"key":28,"text":87,"correct":22},"重力分离",{"key":31,"text":89,"correct":22},"离心分离",{"key":34,"text":62,"correct":26},"BCD",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":91,"analysis":37},1149628,"去除污水中有机物质的方法有下列哪些（ ）。",[96,98,99,101,103],{"key":20,"text":97,"correct":26},"格栅",{"key":24,"text":62,"correct":22},{"key":28,"text":100,"correct":22},"稳定塘",{"key":31,"text":102,"correct":22},"污水土地处理",{"key":34,"text":104,"correct":26},"沉砂池",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":119,"analysis":37},1149629,"污水中关于有机物浓度的指标有（ ）。",[109,111,113,115,117],{"key":20,"text":110,"correct":26},"浊度",{"key":24,"text":112,"correct":22},"COD",{"key":28,"text":114,"correct":22},"TOD",{"key":31,"text":116,"correct":22},"BOD5",{"key":34,"text":118,"correct":22},"TOC","BCDE",{"id":121,"libraryId":5,"type":15,"typeLabel":16,"stem":122,"options":123,"answer":134,"analysis":37},1149630,"二级处理以氧化沟为例，主要去除污水中（ ）。",[124,126,128,130,132],{"key":20,"text":125,"correct":22},"呈胶体状态的有机污染物质",{"key":24,"text":127,"correct":26},"有机污染物质",{"key":28,"text":129,"correct":26},"溶解状态的污染物质",{"key":31,"text":131,"correct":22},"溶解状态的有机污染物质",{"key":34,"text":133,"correct":26},"生物污染物质","AD",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":147,"analysis":37},1149631,"城市污水二级处理通常采用的方法是微生物处理法，具体方式又主要分为：（ ）。",[139,141,142,144,145],{"key":20,"text":140,"correct":26},"生物脱氮除磷",{"key":24,"text":83,"correct":22},{"key":28,"text":143,"correct":26},"氧化还原",{"key":31,"text":62,"correct":22},{"key":34,"text":146,"correct":26},"混凝沉淀","BD",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":162,"analysis":37},1149632,"再生水回用处理技术的选择主要取决于（ ）的要求。",[152,154,156,158,160],{"key":20,"text":153,"correct":26},"再生水水量",{"key":24,"text":155,"correct":22},"回用水水质",{"key":28,"text":157,"correct":22},"再生水水源的水质",{"key":31,"text":159,"correct":26},"回用水水量",{"key":34,"text":161,"correct":26},"回用水水压","BC",{"id":164,"libraryId":5,"type":15,"typeLabel":16,"stem":165,"options":166,"answer":175,"analysis":37},1149633,"污水三级处理一般不包括哪些工艺（ ）。",[167,168,169,171,173],{"key":20,"text":140,"correct":26},{"key":24,"text":146,"correct":26},{"key":28,"text":170,"correct":26},"过滤",{"key":31,"text":172,"correct":22},"生物转盘",{"key":34,"text":174,"correct":22},"氧化沟","DE",{"id":177,"libraryId":5,"type":15,"typeLabel":16,"stem":178,"options":179,"answer":190,"analysis":37},1149634,"三级处理是在一级处理、二级处理之后，进一步处理哪些物质：（ ）。",[180,182,184,186,188],{"key":20,"text":181,"correct":26},"铁锰等络合物",{"key":24,"text":183,"correct":22},"难降解有机物",{"key":28,"text":185,"correct":26},"病原菌",{"key":31,"text":187,"correct":26},"钙镁等离子",{"key":34,"text":189,"correct":22},"氮磷等无机物","BE",{"id":192,"libraryId":5,"type":15,"typeLabel":16,"stem":193,"options":194,"answer":119,"analysis":37},1149635,"再生水回用分为五类：农、林、渔业用水以及（ ）。",[195,197,199,201,203],{"key":20,"text":196,"correct":26},"饮用水",{"key":24,"text":198,"correct":22},"城市杂用水",{"key":28,"text":200,"correct":22},"环境用水",{"key":31,"text":202,"correct":22},"补充水源水",{"key":34,"text":204,"correct":22},"工业用水",{"id":206,"libraryId":5,"type":15,"typeLabel":16,"stem":207,"options":208,"answer":219,"analysis":37},1149636,"给水与污水处理构筑物和设备安装、试验、验收完成后，正式运行前必须进行全厂试运行，试运行的内容（ ）。",[209,211,213,215,217],{"key":20,"text":210,"correct":26},"检验设备的稳定性",{"key":24,"text":212,"correct":26},"检验设备的联动性",{"key":28,"text":214,"correct":22},"检验、试验和监视运行，设备首次启动，以试验为主，通过试验掌握运行性能",{"key":31,"text":216,"correct":22},"按规定全面详细记录试验情况，整理成技术资料",{"key":34,"text":218,"correct":22},"正确评估试运行资料、质量检查和鉴定资料等，并建立档案","CDE",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":234,"analysis":37},1149637,"给水与污水处理构筑物和设备安装、试验、验收完成后，正式运行前必须进行联机运行，具体要求为（ ）。",[224,226,228,230,232],{"key":20,"text":225,"correct":22},"按工艺流程各构筑物逐个通水连机试运行正常",{"key":24,"text":227,"correct":22},"全厂联机试运行、协联运行正常",{"key":28,"text":229,"correct":22},"先采用手工操作，处理构筑物和设备全部运转正常后，方可转入自动控制运行",{"key":31,"text":231,"correct":26},"全厂联机运行应不少于48h",{"key":34,"text":233,"correct":22},"监测并记录各构筑物运行情况和运行数据","ABCE",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":247,"analysis":37},1149638,"在污水处理中，针对下列预处理方法，属于氧化预处理的是（ ）。",[239,240,242,244,245],{"key":20,"text":47,"correct":22},{"key":24,"text":241,"correct":22},"TOC生物降解",{"key":28,"text":243,"correct":26},"粉末活性炭吸附",{"key":31,"text":62,"correct":22},{"key":34,"text":246,"correct":26},"粉土吸附","ABD",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":262,"analysis":37},1149639,"下列关于水池等构筑物模板支架施工说法正确的是（ ）。",[252,254,256,258,260],{"key":20,"text":253,"correct":22},"模板安装位置正确、拼缝紧密不漏浆",{"key":24,"text":255,"correct":22},"预埋管、预埋件的安装必须牢固，位置准确，安装后应作标志",{"key":28,"text":257,"correct":26},"顶板支架与池壁模板支架应相互独立，内模立柱可同时作为顶板模板立柱",{"key":31,"text":259,"correct":22},"池壁模板应设置确保墙体直顺和防止浇筑混凝土时模板倾覆的装置",{"key":34,"text":261,"correct":22},"跨度为6m的现浇钢筋混凝土板，模板应起拱，起拱高度至少为6mm。","ABDE",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":234,"analysis":37},1149640,"下列关于橡胶止水带质量要求，说法正确的是（ ）。",[267,269,271,273,275],{"key":20,"text":268,"correct":22},"橡胶止水带的形状、尺寸应符合设计要求",{"key":24,"text":270,"correct":22},"橡胶止水带的材质、物理性能应符合设计要求",{"key":28,"text":272,"correct":22},"橡胶止水带接头应采用热接方法，接缝应平整牢固，不得有裂口、脱胶现象",{"key":31,"text":274,"correct":26},"橡胶止水带十字接头可由厂家在现场采用热接方法加工成型",{"key":34,"text":276,"correct":22},"橡胶止水带应无裂纹、无气泡",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":262,"analysis":37},1149641,"现浇（预应力）混凝土水池施工过程中，对止水带的安装技术表述正确的是（ ）。",[281,283,285,287,289],{"key":20,"text":282,"correct":22},"塑料或橡胶止水带接头应采用热接，不得采用叠接",{"key":24,"text":284,"correct":22},"金属止水带应平整、尺寸准确，其表面的铁锈、油污应清除干净，不得有砂眼、钉孔",{"key":28,"text":286,"correct":26},"金属止水带接头应按其厚度分别采用折叠咬接，不得采用搭接",{"key":31,"text":288,"correct":22},"金属止水带接头应采用双面焊接",{"key":34,"text":290,"correct":22},"不得在止水带上穿孔",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":262,"analysis":37},1149642,"下列关于金属止水带质量要求，说法正确的是（ ）。",[295,297,299,301,303],{"key":20,"text":296,"correct":22},"金属止水带应平整、尺寸准确，表面无铁锈、油污，无砂眼、钉孔",{"key":24,"text":298,"correct":22},"金属止水带接头应按其厚度分别采用折叠咬接或搭接",{"key":28,"text":300,"correct":26},"金属止水带接头咬接长度15mm，搭接长度20mm",{"key":31,"text":302,"correct":22},"咬接或搭接必须采用双面焊接",{"key":34,"text":304,"correct":22},"金属止水带在伸缩缝中的部分应涂防锈和防腐涂料",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":219,"analysis":37},1149643,"下列关于无粘结预应力安装、张拉说法有误的是（ ）。",[309,311,313,315,317],{"key":20,"text":310,"correct":26},"锚固肋数量和布置应符合设计要求",{"key":24,"text":312,"correct":26},"上下相邻两无粘结预应力筋锚固位置应错开一个锚固肋",{"key":28,"text":314,"correct":22},"预应力筋的计算长度=张拉长度十锚固肋宽度十张拉工作长度",{"key":31,"text":316,"correct":22},"预应力筋安装中出现死弯时应及时进行角度、曲率调整",{"key":34,"text":318,"correct":22},"预应力筋可采用特殊接头进行接长使用",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":262,"analysis":37},1149644,"下列关于无粘结预应力张拉说法正确的是（ ）。",[323,325,327,329,331],{"key":20,"text":324,"correct":22},"张拉段预应力筋长度小于25m时，宜采用一端张拉",{"key":24,"text":326,"correct":22},"张拉段预应力筋长度大于25m而小于50m时，宜采用两端张拉",{"key":28,"text":328,"correct":26},"张拉段预应力筋长度不得大于50m，否则应采用特制接头或分段张拉、锚固",{"key":31,"text":330,"correct":22},"对直线的无粘结预应力筋，应使张拉力的作用线与预应力筋中心重合",{"key":34,"text":332,"correct":22},"张拉后及时封锚，锚具和外露预应力筋的保护层厚度不应小于50mm",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":52,"analysis":37},1149645,"水池钢筋混凝土结构外观、内在质量是工程施工控制的重点，对其质量需进行综合控制，以确保实现设计的使用功能，下列控制方面和说法正确的是（ ）。",[337,339,341,343,345],{"key":20,"text":338,"correct":22},"原材料",{"key":24,"text":340,"correct":22},"配合比",{"key":28,"text":342,"correct":22},"混凝土供应",{"key":31,"text":344,"correct":22},"浇筑，严格执行《给水排水构筑物工程施工及验收规范》",{"key":34,"text":346,"correct":26},"养护，应遮盖洒水保湿养护不少于7d，至达到规定的强度",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":234,"analysis":37},1149646,"装配式预应力水池构件吊装方案编制的要点有（ ）。",[351,353,355,357,359],{"key":20,"text":352,"correct":22},"工程概况",{"key":24,"text":354,"correct":22},"主要技术措施，包括准备工作、吊装程序和方法、构件稳固措施及其他措施",{"key":28,"text":356,"correct":22},"质量安全保证措施",{"key":31,"text":358,"correct":26},"监控量测措施",{"key":34,"text":360,"correct":22},"吊装进度计划",{"id":362,"libraryId":5,"type":15,"typeLabel":16,"stem":363,"options":364,"answer":234,"analysis":37},1149647,"装配式预应力水池吊装的质量要点包括：（ ）。",[365,367,369,371,373],{"key":20,"text":366,"correct":22},"有裂缝的构件，应进行鉴定",{"key":24,"text":368,"correct":22},"预制柱、梁及壁板等构件应标注中心线，并在杯槽、杯口上标出中心线",{"key":28,"text":370,"correct":22},"预制构件应按设计位置起吊，曲梁宜采用三点吊装。吊绳与预制构件平面的交角不应小于45゜；当小于45゜时，应进行强度验算",{"key":31,"text":372,"correct":26},"预制构件安装就位后，应采取临时固定措施。曲梁应在梁的跨中临时支撑，待上部二期混凝土达到设计强度的50%及以上时，方可拆除支撑",{"key":34,"text":374,"correct":22},"安装的构件，必须在轴线位置及高程进行校正后焊接或浇筑接头混凝土",{"id":376,"libraryId":5,"type":15,"typeLabel":16,"stem":377,"options":378,"answer":119,"analysis":37},1149648,"满水试验的流程有（ ）。",[379,381,383,385,387],{"key":20,"text":380,"correct":26},"吹扫",{"key":24,"text":382,"correct":22},"水池注水",{"key":28,"text":384,"correct":22},"水池内水位观测",{"key":31,"text":386,"correct":22},"蒸发量测定",{"key":34,"text":388,"correct":22},"整理试验结论",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":91,"analysis":37},1149649,"关于预制拼装给水排水构筑物现浇板缝施工说法，正确的有（ ）。",[393,395,397,399,401],{"key":20,"text":394,"correct":26},"壁板接缝的内模不宜一次安装到顶",{"key":24,"text":396,"correct":22},"外模应分段随浇随支",{"key":28,"text":398,"correct":22},"分段支模高度不宜超过1.5m",{"key":31,"text":400,"correct":22},"宜采用微膨胀水泥",{"key":34,"text":402,"correct":26},"板缝混凝土应与壁板混凝土强度相同",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":417,"analysis":37},1149650,"构筑物满水试验前的必备条件有（ ）。",[407,409,411,413,415],{"key":20,"text":408,"correct":22},"池体的混凝土或砖、石砌体的砂浆已达到设计强度要求",{"key":24,"text":410,"correct":26},"选定好洁净、充足的水源",{"key":28,"text":412,"correct":22},"池体抗浮稳定性满足设计要求",{"key":31,"text":414,"correct":22},"池内外缺陷已修补完毕",{"key":34,"text":416,"correct":22},"各项保证试验安全的措施已满足要求","ACDE",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":432,"analysis":37},1149651,"下列关于水池满水试验注水施工说法错误的是（ ）。",[422,424,426,428,430],{"key":20,"text":423,"correct":22},"向池内注水宜分两次进行，每次注水为设计水深的1\u002F2",{"key":24,"text":425,"correct":22},"注水时水位上升速度不宜超过1m\u002Fd",{"key":28,"text":427,"correct":22},"相邻两次注水的间隔时间不应小于2h",{"key":31,"text":429,"correct":26},"当发现渗水量过大时，应停止注水，待做出妥善处理后方可继续注水",{"key":34,"text":431,"correct":26},"在注水过程中和注水以后，应对池体做外观检查","ABC",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":77,"analysis":37},1149652,"水池满水试验时，应按要求向池内注水，下列各项要求正确的是（ ）。",[437,439,441,443,445],{"key":20,"text":438,"correct":26},"向池内注水宜分两次进行，每次注水为设计水深的二分之一",{"key":24,"text":440,"correct":22},"向池内注水宜分三次进行，每次注水为设计水深的三分之一",{"key":28,"text":442,"correct":22},"相邻两次注水的间隔时间不应小于24h。",{"key":31,"text":444,"correct":26},"对大、中型水池，第一次注水可按小于2m／d的水位上升速度持续注水至规定深度",{"key":34,"text":446,"correct":22},"每次注水宜测读24h的水位下降值，计算渗水量",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":119,"analysis":37},1149653,"水池满水试验中，水位观测的要求有（ ）。",[451,453,455,457,459],{"key":20,"text":452,"correct":26},"测读水位的初读数与末读数之间的间隔时间一般应为12h",{"key":24,"text":454,"correct":22},"水位测针的读数精确度1\u002F10mm",{"key":28,"text":456,"correct":22},"注水至设计水深24h后，开始测读水位测针的初读数",{"key":31,"text":458,"correct":22},"利用水位标尺测针观测、记录注水时的水位值",{"key":34,"text":460,"correct":22},"测定时间必须连续",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":52,"analysis":37},1149654,"下列工作中属于沉井施工准备工作的是（ ）。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"按方案要求，进行施工平面布置，测设沉井中心桩，轴线控制桩，基坑开挖深度及边坡",{"key":24,"text":468,"correct":22},"沉井施工影响附近建（构）筑物、管线或河岸设施时，应采取控制措施，并应进行沉降和位移监测，测点应设在不受施工干扰和方便测量地方",{"key":28,"text":470,"correct":22},"地下水位应控制在沉井基坑以下0.5m，及时排除基坑内积水",{"key":31,"text":472,"correct":22},"基坑开挖应分层有序进行，保持平整和疏干状态",{"key":34,"text":474,"correct":26},"进行基础处理",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":417,"analysis":37},1149655,"下列属于沉井施工下沉控制要点的是（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"下沉应平稳、均衡、缓慢，通过调整开挖顺序和方式纠正偏斜，做到“随挖随纠、动中纠偏”",{"key":24,"text":482,"correct":26},"开挖顺序和方式没有严格要求",{"key":28,"text":484,"correct":22},"按施工方案规定的顺序和方式开挖",{"key":31,"text":486,"correct":22},"进行沉井下沉监控测量",{"key":34,"text":488,"correct":22},"沉井下沉影响范围内的地面四周不得堆放任何东西，减少车辆震动",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":234,"analysis":37},1149656,"分节制作沉井时应（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"每节制作高度应符合施工方案要求，且第一节制作高度必须高于刃脚部分",{"key":24,"text":496,"correct":22},"混凝土施工缝处理应采用凹凸缝或设置钢板止水带，施工缝应凿毛并清理干净",{"key":28,"text":498,"correct":22},"沉井每次接高时各部位的轴线位置应一致、重合，及时做好沉降和位移监测",{"key":31,"text":500,"correct":26},"井内设有底梁或支撑梁时应与刃脚分别浇捣",{"key":34,"text":502,"correct":22},"必要时应对刃脚地基承载力进行验算，并采取相应措施确保地基及结构的稳定",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":432,"analysis":37},1149657,"下列（ ）水池（构筑物）工程施工应采取降排水措施。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"受地表水、地下动水压力作用影响的地下结构工程",{"key":24,"text":510,"correct":22},"采用排水法下沉和封底的沉井工程",{"key":28,"text":512,"correct":22},"基坑底部存在承压含水层，且经验算基底开挖面至承压含水层顶板之间的土体重力不足以平衡承压水水头压力，需要减压降水的工程",{"key":31,"text":514,"correct":26},"大型沉井",{"key":34,"text":516,"correct":26},"地下水池",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":432,"analysis":37},1149658,"水池施工中的抗浮措施有（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"选择可靠的降低地下水位方法，严格进行排降水工程施工，对排降水所用机具随时做好保养维护，并有备用机具",{"key":24,"text":524,"correct":22},"完善雨期施工防汛",{"key":28,"text":526,"correct":22},"可能时，允许地下水和外来水进入构筑物，使构筑物内外无水位差，以减少浮力值",{"key":31,"text":528,"correct":26},"增加池体钢筋所占比例",{"key":34,"text":530,"correct":26},"对池体下部进行换土",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":234,"analysis":37},1149659,"常用不开槽管道施工方法有（ ）等。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"顶管法",{"key":24,"text":538,"correct":22},"盾构法",{"key":28,"text":540,"correct":22},"浅埋暗挖法",{"key":31,"text":542,"correct":26},"螺旋钻法",{"key":34,"text":544,"correct":22},"夯管法",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":52,"analysis":37},1149660,"压力管道试验准备工作包括（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":22},"试验管段所有敞口应封闭，不得有渗漏水现象",{"key":24,"text":552,"correct":22},"试验管段不得用闸阀做堵板，不得含有消火栓、水锤消除器、安全阀等附件",{"key":28,"text":554,"correct":22},"水压试验前应清除管道内的杂物",{"key":31,"text":556,"correct":22},"应做好水源引接、排水等疏导方案",{"key":34,"text":558,"correct":26},"做好管道的强度检查",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":573,"analysis":37},1149661,"采用爆管法进行旧管更新，按照爆管工具的不同，可将爆管分为（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"气动爆管",{"key":24,"text":566,"correct":26},"人工爆管",{"key":28,"text":568,"correct":22},"液动爆管",{"key":31,"text":570,"correct":26},"自动爆管",{"key":34,"text":572,"correct":22},"切割爆管","ACE",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":417,"analysis":37},1149662,"沟槽开挖过程的支撑与支护说法正确的有（ ）。",[578,580,582,584,586],{"key":20,"text":579,"correct":22},"撑板支撑应随挖土及时安装",{"key":24,"text":581,"correct":26},"条件允许时施工人员可攀登支撑上下沟槽",{"key":28,"text":583,"correct":22},"拆除撑板应制定安全措施，配合回填交替进行",{"key":31,"text":585,"correct":22},"拆除支撑前，应对沟槽两侧的建筑物、构筑物和槽壁进行安全检查，并应制定拆除支撑的作业要求和安全措施",{"key":34,"text":587,"correct":22},"支撑应经常检查，当发现支撑构件有弯曲、松动、移位或劈裂等迹象时，应及时处理；雨期及春季解冻时期应加强检查",{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":573,"analysis":37},1149663,"给水排水管道地基因排水不良被扰动时，扰动深度为300mm以内，可回填（ ）。",[592,594,596,598,600],{"key":20,"text":593,"correct":22},"卵石",{"key":24,"text":595,"correct":26},"水泥混凝土",{"key":28,"text":597,"correct":22},"块石",{"key":31,"text":599,"correct":26},"砾石砂",{"key":34,"text":601,"correct":22},"砾石",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":616,"analysis":37},1149664,"管道基础采用天然地基时，地基因排水不良被扰动时，应将扰动部分全部清除，扰动深度在100mm以内可回填（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":22},"天然级配砂石",{"key":24,"text":609,"correct":22},"天然级配砂砾",{"key":28,"text":611,"correct":26},"泥土",{"key":31,"text":613,"correct":26},"低强度混凝土",{"key":34,"text":615,"correct":26},"砂垫层","AB",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":631,"analysis":37},1149665,"涂敷操作时钢管温度应高于露点温度（ ）以上，且控制在涂料生产商推荐的范围内。混合涂料的温度不应低于（ ）。",[621,623,625,627,629],{"key":20,"text":622,"correct":22},"3℃",{"key":24,"text":624,"correct":26},"5℃",{"key":28,"text":626,"correct":22},"10℃",{"key":31,"text":628,"correct":26},"13℃",{"key":34,"text":630,"correct":26},"20℃","AC",{"id":633,"libraryId":5,"type":15,"typeLabel":16,"stem":634,"options":635,"answer":52,"analysis":37},1149666,"防腐层所有原材料均应有（ ）、出厂合格证、生产日期及有效期。环氧粉末涂料供应商应提供产品的热特性曲线等资料。",[636,638,640,642,644],{"key":20,"text":637,"correct":22},"出厂质量证明书",{"key":24,"text":639,"correct":22},"检验报告",{"key":28,"text":641,"correct":22},"使用说明书",{"key":31,"text":643,"correct":22},"安全数据单",{"key":34,"text":645,"correct":26},"复试报告",{"id":647,"libraryId":5,"type":15,"typeLabel":16,"stem":648,"options":649,"answer":52,"analysis":37},1149667,"顶管顶进方法的选择，应根据工程设计要求、工程水文地质条件、周围环境和现场条件，经技术经济比较后确定，并应符合下列规定：（ ）。",[650,652,654,656,658],{"key":20,"text":651,"correct":22},"采用敞口式（手掘式）顶管时，应将地下水位降至管底以下不小于0.5m处，并应采取措施，防止其他水源进入顶管的管道",{"key":24,"text":653,"correct":22},"当周围环境要求控制地层变形或无降水条件时，宜采用封闭式的土压平衡或泥水平衡顶管机施工",{"key":28,"text":655,"correct":22},"穿越建（构）筑物、铁路、公路、重要管线和防汛墙等时，应制定相应的保护措施",{"key":31,"text":657,"correct":22},"根据工程设计、施工方法、工程和水文地质条件，对邻近建（构）筑物、管线，应采用土体加固或其他有效的保护措施",{"key":34,"text":659,"correct":26},"大口径的金属管道，当无地层变形控制要求且顶力满足施工要求时，可采用一次顶进的挤密土层顶管法",{"id":661,"libraryId":5,"type":15,"typeLabel":16,"stem":662,"options":663,"answer":671,"analysis":37},1149668,"新建市政公用工程不开槽成品管的常用施工方法有（ ）。",[664,665,666,668,670],{"key":20,"text":536,"correct":22},{"key":24,"text":544,"correct":22},{"key":28,"text":667,"correct":26},"裂管法",{"key":31,"text":669,"correct":26},"沉管法",{"key":34,"text":538,"correct":22},"ABE",{"id":673,"libraryId":5,"type":15,"typeLabel":16,"stem":674,"options":675,"answer":119,"analysis":37},1149669,"进行浅埋暗挖施工方案的选择应考虑的因素有（ ）。",[676,678,680,682,684],{"key":20,"text":677,"correct":26},"适合于所有地层",{"key":24,"text":679,"correct":22},"工程设计（隧道断面和结构形式、埋深、长度）",{"key":28,"text":681,"correct":22},"工程水文地质条件",{"key":31,"text":683,"correct":22},"施工现场和周围环境安全等要求",{"key":34,"text":685,"correct":22},"技术经济比较",{"id":687,"libraryId":5,"type":15,"typeLabel":16,"stem":688,"options":689,"answer":262,"analysis":37},1149670,"应根据（ ）确定定向钻机的回转扭矩和回拖力。",[690,692,694,696,698],{"key":20,"text":691,"correct":22},"终孔孔径",{"key":24,"text":693,"correct":22},"轴向曲率半径",{"key":28,"text":695,"correct":26},"管道管材",{"key":31,"text":697,"correct":22},"安全储备",{"key":34,"text":699,"correct":22},"管道长度",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":417,"analysis":37},1149671,"夯管锤的锤击力应根据（ ）确定。",[704,706,708,709,711],{"key":20,"text":705,"correct":22},"管径",{"key":24,"text":707,"correct":26},"管壁厚度",{"key":28,"text":697,"correct":22},{"key":31,"text":710,"correct":22},"工程地质、水文地质和周围环境条件",{"key":34,"text":699,"correct":22},{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":91,"analysis":37},1149672,"管道闭气试验适用条件（ ）。",[716,718,720,722,724],{"key":20,"text":717,"correct":26},"任何管道",{"key":24,"text":719,"correct":22},"混凝土类的无压管道在回填土前进行的严密性试验",{"key":28,"text":721,"correct":22},"地下水位应低于管外底150mm，环境温度为-15～50℃",{"key":31,"text":723,"correct":22},"下雨时不得进行闭气试验",{"key":34,"text":725,"correct":26},"下雨时可以进行闭气试验",[727,731,734,737,740,743],{"id":728,"name":729,"category":7,"favorite":730},1,"领导干部任职前廉政法规知识测试题",92,{"id":732,"name":733,"category":7,"favorite":728},595,"建筑结构与设备",{"id":735,"name":736,"category":7,"favorite":728},715,"招标采购专业知识与法律法规",{"id":738,"name":739,"category":7,"favorite":728},848,"市政方向-通用基础",{"id":741,"name":742,"category":7,"favorite":8},534,"BIM工程师",{"id":744,"name":742,"category":7,"favorite":8},535]