[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-33":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":734},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,33,50,2019,[13,38,53,68,83,98,113,128,143,157,170,185,199,213,228,241,256,270,285,300,314,329,343,357,371,386,401,416,430,444,459,468,482,496,511,525,540,554,568,582,596,610,625,640,654,668,682,696,710,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149573,2,"多选题","关于基坑围护结构说法，正确的有（ ）。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","SMW工法桩止水性好",true,{"key":24,"text":25,"correct":22},"B","地下连续墙刚度大，但造价较高",{"key":27,"text":28,"correct":22},"C","钻孔灌注桩一般采用机械成孔",{"key":30,"text":31,"correct":32},"D","深层搅拌桩重力式支护一般变形较小",false,{"key":34,"text":35,"correct":22},"E","高压旋喷桩可以作为止水帷幕","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149574,"关于预制混凝土板桩的特点，叙述正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"刚度小，变形大，与多道支撑结合，在软弱土层中也可采用",{"key":24,"text":45,"correct":22},"桩间采用槽榫接合方式，接缝效果较好，有时需辅以止水措施",{"key":27,"text":47,"correct":22},"自重大，受起吊设备限制，不适合大深度基坑",{"key":30,"text":49,"correct":22},"预制混凝土板桩施工较为困难，对机械要求高，而且挤土现象很严重",{"key":34,"text":51,"correct":32},"施工简便，但施工有噪声","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149575,"关于基坑（槽）轻型井点降水说法，正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"当基坑（槽）宽度小于6m且降水深度不超过6m时，可采用单排井点",{"key":24,"text":60,"correct":32},"单排井点应布置在地下水下游一侧",{"key":27,"text":62,"correct":22},"当基坑（槽）宽度大于6m或土质不良，渗透系数较大时，宜采用双排井点",{"key":30,"text":64,"correct":22},"当基坑面积较大时，宜采用环形井点",{"key":34,"text":66,"correct":22},"挖土运输设备出入道可不封闭，间距可达4m，一般留在地下水下游方向","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1149576,"关于基坑轻型井点降水说法，正确的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":32},"6m宽基坑应采用环形布置",{"key":24,"text":75,"correct":22},"4m宽的出入道可不封闭",{"key":27,"text":77,"correct":32},"只能用于挖深小于6m的基坑",{"key":30,"text":79,"correct":32},"土质不良时不能采用轻型井点降水",{"key":34,"text":81,"correct":22},"不封闭端设在地下水下游方向","BE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1149577,"基坑的隔水帷幕周围的地下水渗流特征和（ ）有关，利用这些关系布置降水井可以提高降水的效率，减少降水对环境的影响。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"隔水帷幕的深度",{"key":24,"text":90,"correct":22},"含水层位置",{"key":27,"text":92,"correct":22},"降水目的",{"key":30,"text":94,"correct":32},"基坑深度",{"key":34,"text":96,"correct":32},"基坑宽度","ABC",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1149578,"管井滤管与孔壁之间不宜填充的滤料有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":32},"圆砾石",{"key":24,"text":105,"correct":32},"中粗砂",{"key":27,"text":107,"correct":22},"棱角形石渣料",{"key":30,"text":109,"correct":22},"风化料",{"key":34,"text":111,"correct":22},"黏质岩石成分的砾石","CDE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1149579,"适用于承压水层降水的方法有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":32},"集水明排",{"key":24,"text":120,"correct":32},"一级轻型井点",{"key":27,"text":122,"correct":22},"管井",{"key":30,"text":124,"correct":32},"二级轻型井点",{"key":34,"text":126,"correct":22},"喷射井点","CE",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1149580,"当基坑底有承压水时，应进行坑底突涌验算，必要时可采取（ ）保证坑底土层稳定。",[132,134,136,138,140],{"key":20,"text":133,"correct":32},"截水",{"key":24,"text":135,"correct":22},"水平封底隔渗",{"key":27,"text":137,"correct":32},"设置集水井",{"key":30,"text":139,"correct":22},"钻孔减压",{"key":34,"text":141,"correct":32},"回灌","BD",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":36,"analysis":37},1149581,"当基坑底为隔水层且层底作用有承压水时，为保证坑底土层稳定、确保基坑开挖施工安全，正确的处理措施有（ ）等。",[147,149,151,153,155],{"key":20,"text":148,"correct":22},"进行坑底突涌验算",{"key":24,"text":150,"correct":22},"必要时水平封底隔渗",{"key":27,"text":152,"correct":22},"必要时钻孔减压",{"key":30,"text":154,"correct":32},"必要时坑内压重",{"key":34,"text":156,"correct":22},"当坑底含承压水层且上部土体压重不足以抵抗承压水水头时，应布置降压井",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":169,"analysis":37},1149582,"当场地内有地下水时，应根据场地及周边区域的工程地质条件、水文地质条件、周边环境情况和支护结构与基础形式等因素，确定地下水控制方法。地下水的控制方法主要有（ ）。",[161,163,165,166,168],{"key":20,"text":162,"correct":22},"降水",{"key":24,"text":164,"correct":32},"注浆",{"key":27,"text":133,"correct":22},{"key":30,"text":167,"correct":32},"冷冻",{"key":34,"text":141,"correct":22},"ACE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1149583,"地下连续墙的主要特点包括（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":32},"强度小,变形大,隔水性好",{"key":24,"text":177,"correct":22},"刚度大,开挖深度大，可适用于所有地层，除夹有孤石、大颗粒卵砾石等局部障碍物时影响成槽效率外",{"key":27,"text":179,"correct":22},"可兼作主体结构的一部分",{"key":30,"text":181,"correct":22},"可临近建筑物,构筑物使用，环境影响小",{"key":34,"text":183,"correct":22},"造价高","BCDE",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":184,"analysis":37},1149584,"壁后注浆应根据（ ）等选择注浆方式。",[189,191,193,195,197],{"key":20,"text":190,"correct":32},"规划设计",{"key":24,"text":192,"correct":22},"工程地质条件",{"key":27,"text":194,"correct":22},"地表沉降状态",{"key":30,"text":196,"correct":22},"环境要求",{"key":34,"text":198,"correct":22},"设备性能",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":36,"analysis":37},1149585,"洞口土体加固前，要根据（ ）等因素，明确加固目的后，确定加固方案。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"地质条件与地下水位",{"key":24,"text":206,"correct":22},"隧道覆土深度",{"key":27,"text":208,"correct":22},"施工环境条件",{"key":30,"text":210,"correct":32},"工作井围护结构",{"key":34,"text":212,"correct":22},"盾构种类",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},1149586,"按平衡开挖面的土压与水压的原理不同，密闭式盾构机可分为（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"土压式",{"key":24,"text":220,"correct":32},"手掘式",{"key":27,"text":222,"correct":22},"泥水式",{"key":30,"text":224,"correct":32},"半机械挖掘式",{"key":34,"text":226,"correct":32},"机械挖掘式","AC",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":240,"analysis":37},1149587,"轨道交通工程密闭式盾构机可分为（ ）等。",[232,233,234,236,238],{"key":20,"text":218,"correct":22},{"key":24,"text":222,"correct":22},{"key":27,"text":235,"correct":32},"网格式",{"key":30,"text":237,"correct":32},"人工开挖式",{"key":34,"text":239,"correct":32},"敞开式","AB",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":255,"analysis":37},1149588,"盾构选型的主要原则包括（ ）。",[245,247,249,251,253],{"key":20,"text":246,"correct":32},"开拓性原则",{"key":24,"text":248,"correct":22},"适用性原则",{"key":27,"text":250,"correct":32},"灵活性原则",{"key":30,"text":252,"correct":22},"技术先进性原则",{"key":34,"text":254,"correct":22},"经济合理性原则","BDE",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":184,"analysis":37},1149589,"关于盾构法施工适用条件，以下说法正确的是（ ）。",[260,262,264,266,268],{"key":20,"text":261,"correct":32},"隧道应有足够的埋深，覆土深度宜不小于盾构直径",{"key":24,"text":263,"correct":22},"适用除硬岩外的相对均质的地质条件",{"key":27,"text":265,"correct":22},"采用密闭式盾构时,始发和接收区需要辅助施工法",{"key":30,"text":267,"correct":22},"截面形状可采用异形截面",{"key":34,"text":269,"correct":22},"接近既有建（构）筑物施工时，有时需要辅助措施",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":284,"analysis":37},1149590,"关于盾构施工现场设置，以下说法正确的是（ ）。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"采用气压法盾构施工时，施工现场应设置空压机房",{"key":24,"text":277,"correct":32},"采用泥水平衡盾构机施工时，施工现场应设置电机车电瓶充电间等设施",{"key":27,"text":279,"correct":32},"采用土压平衡盾构施工时，施工现场应设置泥浆处理系统",{"key":30,"text":281,"correct":32},"采用泥水平衡盾构机施工时，施工现场应设置集土坑",{"key":34,"text":283,"correct":22},"工作井施工需要采取降水措施时，应设置相当规模的降水系统","AE",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":299,"analysis":37},1149591,"采用盾构法施工时，拆除工作井内洞口围护结构前必须对洞口土体进行加固，主要原因有（ ）。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"土压平衡盾构始发掘进的一段距离内或到达接收洞口前的一段距离内难以建立起土压",{"key":24,"text":292,"correct":22},"泥水平衡盾构始发掘进的一段距离内或到达接收洞口前的一段距离内难以建立起泥水压",{"key":27,"text":294,"correct":32},"工作井围护结构易产生较大变形",{"key":30,"text":296,"correct":22},"拆除洞口围护结构会导致地下水涌入",{"key":34,"text":298,"correct":22},"拆除洞口围护结构会导致洞口土体失稳","ABDE",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":97,"analysis":37},1149592,"盾构施工步骤一般粗略分为（ ）。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"始发",{"key":24,"text":307,"correct":22},"正常掘进",{"key":27,"text":309,"correct":22},"到达",{"key":30,"text":311,"correct":32},"穿越环境风险源",{"key":34,"text":313,"correct":32},"穿越不良地质",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":328,"analysis":37},1149593,"盾构法隧道始发洞口土体常用的加固方法有（ ）。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"注浆法",{"key":24,"text":321,"correct":22},"冻结法",{"key":27,"text":323,"correct":32},"SMW桩法",{"key":30,"text":325,"correct":32},"地下连续墙法",{"key":34,"text":327,"correct":22},"高压喷射搅拌法","ABE",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":67,"analysis":37},1149594,"在土压平衡工况模式下，渣土应具有（ ）的特性。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"良好的塑流状态",{"key":24,"text":336,"correct":32},"良好的散热性",{"key":27,"text":338,"correct":22},"良好的黏稠度",{"key":30,"text":340,"correct":22},"低内摩擦力",{"key":34,"text":342,"correct":22},"低透水性",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":299,"analysis":37},1149595,"关于管片拼装呈真圆并保持真圆状态的重要性，以下说法正确的是（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"确保隧道尺寸精度",{"key":24,"text":350,"correct":22},"减少地层沉降",{"key":27,"text":352,"correct":32},"确保隧道线形",{"key":30,"text":354,"correct":22},"提高隧道止水性",{"key":34,"text":356,"correct":22},"提高施工速度",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":52,"analysis":37},1149596,"关于盾构姿态控制，根据盾构的横向和竖向偏差及滚转角，调整后盾构姿态可采取（ ）等措施。",[361,363,365,367,369],{"key":20,"text":362,"correct":32},"反转螺旋出土器",{"key":24,"text":364,"correct":22},"液压缸分组控制",{"key":27,"text":366,"correct":22},"使用仿形刀适量超挖",{"key":30,"text":368,"correct":22},"反转刀盘",{"key":34,"text":370,"correct":32},"降低千斤顶压力",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":385,"analysis":37},1149597,"关于盾构初始掘进的主要任务，以下说法正确的是（ ）。",[375,377,379,381,383],{"key":20,"text":376,"correct":32},"调整盾构掘进参数并控制地层变形",{"key":24,"text":378,"correct":22},"为正常掘进控制提供依据",{"key":27,"text":380,"correct":22},"及早把握盾构掘进方向控制特性",{"key":30,"text":382,"correct":32},"测量盾构与衬砌的位置控制隧道线形",{"key":34,"text":384,"correct":22},"判断土压（泥水压）、注浆量、注浆压力等设定值是否适当","BCE",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},1149598,"台阶开挖法中，以下表述错误的有（ ）。",[390,392,394,396,398],{"key":20,"text":391,"correct":32},"台阶开挖法适用于土质较好的隧道施工",{"key":24,"text":393,"correct":32},"对城市第四纪地层台阶长度一般控制在1D内",{"key":27,"text":395,"correct":32},"台阶开挖法将结构断面分成两个以上部分",{"key":30,"text":397,"correct":22},"台阶法可分为正台阶法和反台阶法",{"key":34,"text":399,"correct":22},"正台阶法能较早使支护闭合，有利于控制其结构变形及由此引起的地面沉降，因此地面沉降较小","DE",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},1149599,"采用环形开挖留核心土法施工时，可能使围岩变形增大的因素是（ ）。",[405,407,409,411,413],{"key":20,"text":406,"correct":22},"围岩要经多次扰动",{"key":24,"text":408,"correct":32},"在第四纪地层，一般不设或少设锚杆",{"key":27,"text":410,"correct":32},"台阶长度较长",{"key":30,"text":412,"correct":22},"形成全断面封闭的时间长",{"key":34,"text":414,"correct":32},"环形开挖进尺较短","AD",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":67,"analysis":37},1149600,"以下关于双侧壁导坑法施工作业说法正确的是（ ）。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"先开挖一侧导坑，并及时地将其初次支护闭合",{"key":24,"text":423,"correct":32},"同时开挖另一侧导坑，并建造初次支护",{"key":27,"text":425,"correct":22},"然后开挖上部核心土，建造拱部初次支护",{"key":30,"text":427,"correct":22},"再后开挖下台阶，建造底部的初次支护，使初次支护全断面闭合",{"key":34,"text":429,"correct":22},"最后拆除导坑临空部分的初次支护，施作内层衬砌",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":184,"analysis":37},1149601,"以下关于中洞法、侧洞法、柱洞法、洞桩法说法正确的是（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":32},"中洞法施工工序简单，施工引起的地面沉降较易控制",{"key":24,"text":437,"correct":22},"侧洞法两侧洞施工时，中洞上方土体受多次扰动，中洞施工若不够谨慎可能坍塌",{"key":27,"text":439,"correct":22},"柱洞法施工的关键是如何确保两侧开挖后初期支护同步作用在顶纵梁上",{"key":30,"text":441,"correct":22},"洞桩法是先挖洞，在洞内制作桩（柱）、梁和顶部结构，然后在其保护下施工",{"key":34,"text":443,"correct":22},"侧洞法施工在处理中洞顶部荷载转移时，相对于中洞法要困难一些",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":458,"analysis":37},1149602,"在各种开挖方法中，初期支护拆除量小的方法是（ ）。",[448,450,452,454,456],{"key":20,"text":449,"correct":32},"CRD法",{"key":24,"text":451,"correct":22},"CD法",{"key":27,"text":453,"correct":22},"单侧壁导坑法",{"key":30,"text":455,"correct":32},"中洞法",{"key":34,"text":457,"correct":32},"侧洞法","BC",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":255,"analysis":37},1149603,"在各种开挖方法中，初期支护拆除量大的方法是（ ）。",[463,464,465,466,467],{"key":20,"text":451,"correct":32},{"key":24,"text":449,"correct":22},{"key":27,"text":453,"correct":32},{"key":30,"text":455,"correct":22},{"key":34,"text":457,"correct":22},{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":67,"analysis":37},1149604,"竖井井口防护应符合（ ）规定。",[472,474,476,478,480],{"key":20,"text":473,"correct":22},"竖井应设置防雨棚",{"key":24,"text":475,"correct":32},"洞门土体加固",{"key":27,"text":477,"correct":22},"竖井应设置挡水墙",{"key":30,"text":479,"correct":22},"竖井应设置安全护栏，且护栏高度不应小于1.2m",{"key":34,"text":481,"correct":22},"竖井周边应架设安全警示装置",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":36,"analysis":37},1149605,"以下选项中关于喷锚暗挖法施工隧道的防水设计与施工说法正确的是（ ）。",[486,488,490,492,494],{"key":20,"text":487,"correct":22},"以结构自防水为根本",{"key":24,"text":489,"correct":22},"以接缝部位混凝土施工为控制重点",{"key":27,"text":491,"correct":22},"辅加防水层",{"key":30,"text":493,"correct":32},"以“防、排、截、引”为原则",{"key":34,"text":495,"correct":22},"以接缝部位防水层施工为控制重点",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":510,"analysis":37},1149606,"注浆工艺应简单、方便、安全，应根据土质条件选择注浆工艺（法）。以下选项中关于注浆工艺适用性说法正确的是（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"砂卵石地层中宜采用渗入注浆法",{"key":24,"text":503,"correct":22},"砂层中宜采用挤压",{"key":27,"text":505,"correct":22},"砂层中宜采用挤压、渗透注浆法",{"key":30,"text":507,"correct":22},"黏土层中宜采用劈裂注浆法",{"key":34,"text":509,"correct":32},"卵石地层宜采用电动硅化注浆法","ABCD",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":299,"analysis":37},1149607,"一般需要采用管棚超前支护的场合的有（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"隧道洞口段施工",{"key":24,"text":518,"correct":22},"通过断层破碎带等特殊地层",{"key":27,"text":520,"correct":32},"所有地质条件下修建隧道",{"key":30,"text":522,"correct":22},"修建大断面地下工程",{"key":34,"text":524,"correct":22},"穿越地下和地面结构物修建地下工程",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":539,"analysis":37},1149608,"喷锚支护是（ ）等结构组合起来的支护形式，可根据不同围岩的稳定状况，采用喷锚支护中的一种或几种结构组合。",[529,531,533,535,537],{"key":20,"text":530,"correct":32},"钢拱架喷射混凝土",{"key":24,"text":532,"correct":32},"超前小导管",{"key":27,"text":534,"correct":22},"钢筋网喷射混凝土",{"key":30,"text":536,"correct":22},"钢拱架一钢筋网喷射混凝土",{"key":34,"text":538,"correct":32},"超前管棚","CD",{"id":541,"libraryId":5,"type":15,"typeLabel":16,"stem":542,"options":543,"answer":510,"analysis":37},1149609,"《地铁设计规范》GB50157-2013规定：地下铁道隧道工程的防水设计，应根据工程与水文地质、地震烈度、结构特点、施工方法和使用要求等因素进行，所遵循的原则以下正确的是（ ）。",[544,546,548,550,552],{"key":20,"text":545,"correct":22},"综合治理",{"key":24,"text":547,"correct":22},"因地制宜",{"key":27,"text":549,"correct":22},"刚柔结合",{"key":30,"text":551,"correct":22},"以防为主",{"key":34,"text":553,"correct":32},"防、排、截、堵并重",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":255,"analysis":37},1149610,"冻结法是利用人工制冷技术，用于富水软弱地层的暗挖施工固结地层，以下关于冻结法表述正确的有（ ）。",[558,560,562,564,566],{"key":20,"text":559,"correct":32},"在冻结体的保护下进行竖井或隧道等地下工程的开挖施工，待衬砌支护完成前，冻结地层逐步解冻，最终恢复到原始状态",{"key":24,"text":561,"correct":22},"形成完整性好、强度高、不透水的临时加固体",{"key":27,"text":563,"correct":32},"冻结加固的地层强度高，对工程环境污染大",{"key":30,"text":565,"correct":22},"目的是加固地层、隔绝地下水与拟建构筑物联系",{"key":34,"text":567,"correct":22},"成本较高，有一定的技术难度",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":67,"analysis":37},1149611,"地表锚杆类型应根据地质条件、使用要求及锚固特性进行选择，可选用种类有（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":22},"中空注浆锚杆",{"key":24,"text":575,"correct":32},"钢铰线锚杆",{"key":27,"text":577,"correct":22},"树脂锚杆",{"key":30,"text":579,"correct":22},"自钻式锚杆",{"key":34,"text":581,"correct":22},"砂浆锚杆",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":97,"analysis":37},1149612,"锚杆类型应根据（ ）进行选择，可选用中空注浆锚杆、树脂锚杆、自钻式锚杆、砂浆锚杆和摩擦型锚杆。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"地质条件",{"key":24,"text":589,"correct":22},"使用要求",{"key":27,"text":591,"correct":22},"锚固特性",{"key":30,"text":593,"correct":32},"锚杆施工质量要求",{"key":34,"text":595,"correct":32},"喷锚支护结构",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":255,"analysis":37},1149613,"常规冻结法使用条件是（ ）。",[600,602,604,606,608],{"key":20,"text":601,"correct":32},"土体含水量大于10%",{"key":24,"text":603,"correct":22},"土体的含水量大于2.5%",{"key":27,"text":605,"correct":32},"地下水流速不大于7～9m\u002Fd",{"key":30,"text":607,"correct":22},"地下水含盐量不大于3%",{"key":34,"text":609,"correct":22},"地下水流速不大于40m\u002Fd",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":624,"analysis":37},1149614,"暗挖隧道外常用的技术措施包括（ ）。",[614,616,618,620,622],{"key":20,"text":615,"correct":22},"冻结法固结地层",{"key":24,"text":617,"correct":32},"设置临时仰拱",{"key":27,"text":619,"correct":22},"地表锚杆或地表注浆加固",{"key":30,"text":621,"correct":22},"降低地下水位法",{"key":34,"text":623,"correct":32},"管棚超前支护","ACD",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":639,"analysis":37},1149615,"给水排水厂站工程中的工艺管线一般要求有良好的（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"水流性能",{"key":24,"text":632,"correct":22},"抗腐蚀性",{"key":27,"text":634,"correct":32},"刚度",{"key":30,"text":636,"correct":22},"抗地层变位性",{"key":34,"text":638,"correct":32},"稳定性","ABD",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":142,"analysis":37},1149616,"根据厂站工艺管线的要求，给排水管道宜采用的管材类型有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":32},"钢筋混凝土平口管",{"key":24,"text":647,"correct":22},"PE管",{"key":27,"text":649,"correct":32},"石棉管",{"key":30,"text":651,"correct":22},"球墨铸铁管",{"key":34,"text":653,"correct":32},"钢管",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":67,"analysis":37},1149617,"关于现浇钢筋混凝土水池结构施工的基本要求，说法正确的是（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"混凝土浇筑应根据结构形式分段、分层连续进行",{"key":24,"text":661,"correct":32},"浇筑层高度最大不得超过300mm，以保证密实",{"key":27,"text":663,"correct":22},"构筑物不得有露筋、蜂窝、麻面等质量缺陷",{"key":30,"text":665,"correct":22},"混凝土实体应做到外光内实",{"key":34,"text":667,"correct":22},"混凝土的配合比、强度、抗渗、抗冻性能应符合设计要求",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":639,"analysis":37},1149618,"下列关于水处理构筑物中圆柱形混凝土池体结构施工说法正确的是（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"当池壁高度大（12～18m）时，宜采用整体现浇施工",{"key":24,"text":675,"correct":22},"可采用满堂支模法",{"key":27,"text":677,"correct":32},"当池壁高度小于15m时，可采用滑升模板法",{"key":30,"text":679,"correct":22},"滑升模板法宜在池壁高度不小于15m时采用",{"key":34,"text":681,"correct":32},"不得可采用整体现浇施工",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":458,"analysis":37},1149619,"预制拼装施工的圆形水池可采用（ ）进行壁板环向预应力施工。",[686,688,690,692,694],{"key":20,"text":687,"correct":32},"垂直张拉法",{"key":24,"text":689,"correct":22},"缠绕预应力钢丝法",{"key":27,"text":691,"correct":22},"电热张拉法",{"key":30,"text":693,"correct":32},"径向张拉法",{"key":34,"text":695,"correct":32},"环绕法",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":52,"analysis":37},1149620,"在流沙地层中，预制沉井法施工应采取不排水下沉湿式沉井方法施工，不排水下沉可分为（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":32},"水力机械下沉",{"key":24,"text":703,"correct":22},"水下抓土下沉",{"key":27,"text":705,"correct":22},"空气吸泥下沉",{"key":30,"text":707,"correct":22},"水下水力吸泥下沉",{"key":34,"text":709,"correct":32},"机械挖土下沉",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":112,"analysis":37},1149621,"预制沉井法施工采取排水下沉干式沉井方法施工时，排水下沉分为（ ）。",[714,715,717,719,721],{"key":20,"text":705,"correct":32},{"key":24,"text":716,"correct":32},"锤击下沉",{"key":27,"text":718,"correct":22},"人工挖土下沉",{"key":30,"text":720,"correct":22},"机具挖土下沉",{"key":34,"text":722,"correct":22},"水力机具下沉",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":624,"analysis":37},1149622,"在渗水量较小、稳定的黏土层中进行预制沉井施工，可采用的施工方法有（ ）。",[727,729,731,732,733],{"key":20,"text":728,"correct":22},"排水下沉干式沉井法",{"key":24,"text":730,"correct":32},"不排水下沉湿式沉井法",{"key":27,"text":718,"correct":22},{"key":30,"text":720,"correct":22},{"key":34,"text":703,"correct":32},[735,739,742,745,748,751],{"id":736,"name":737,"category":7,"favorite":738},1,"领导干部任职前廉政法规知识测试题",92,{"id":740,"name":741,"category":7,"favorite":736},595,"建筑结构与设备",{"id":743,"name":744,"category":7,"favorite":736},715,"招标采购专业知识与法律法规",{"id":746,"name":747,"category":7,"favorite":736},848,"市政方向-通用基础",{"id":749,"name":750,"category":7,"favorite":8},534,"BIM工程师",{"id":752,"name":750,"category":7,"favorite":8},535]