[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":731},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,31,50,2019,[13,38,53,68,83,98,112,127,140,154,169,184,198,209,223,237,251,266,280,294,309,323,337,352,367,381,395,409,424,438,452,466,480,495,509,523,537,551,564,578,592,606,620,634,648,661,675,689,703,717],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149473,2,"多选题","混凝土常用原材料包括水泥和()。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","粗细骨料",true,{"key":24,"text":25,"correct":22},"B","矿物掺合料",{"key":27,"text":28,"correct":22},"C","外加剂",{"key":30,"text":31,"correct":22},"D","水",{"key":33,"text":34,"correct":35},"E","纤维",false,"ABCD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149474,"预应力混凝土常用外加剂有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"减水剂",{"key":24,"text":45,"correct":22},"早强剂",{"key":27,"text":47,"correct":22},"缓凝剂",{"key":30,"text":49,"correct":35},"发泡剂",{"key":33,"text":51,"correct":22},"防冻剂","ABCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149475,"关于钢筋的混凝土保护层厚度的说法，正确的有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":35},"钢筋机械连接件的最小保护层厚度不得小于连接件直径的1\u002F2",{"key":24,"text":60,"correct":22},"当受拉区主筋的混凝土保护层厚度大于50mm时，应按规定在保护层内设置钢筋网",{"key":27,"text":62,"correct":22},"应在钢筋与模板之间设置垫块，垫块应与钢筋绑扎牢固、错开布置",{"key":30,"text":64,"correct":22},"普通钢筋和预应力直线形钢筋的最小混凝土保护层厚度不得小于钢筋公称直径",{"key":33,"text":66,"correct":35},"后张法构件预应力直线形钢筋不得小于20mm","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1149476,"现行国家标准《混凝土强度检验评定标准》GB\u002FT50107-2010中规定的评定混凝土强度的方法有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"标准差已知统计方法",{"key":24,"text":75,"correct":22},"非统计方法",{"key":27,"text":77,"correct":22},"标准差未知统计方法",{"key":30,"text":79,"correct":35},"算术平均法",{"key":33,"text":81,"correct":35},"加权平均法","ABC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1149477,"有关混凝土养护的说法，正确的有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"一般混凝土浇筑完成后，应在收浆后尽快予以覆盖和洒水养护",{"key":24,"text":90,"correct":35},"采用硅酸盐水泥、普通硅酸盐水泥或矿渣硅酸盐水泥的混凝土，不得少于5d",{"key":27,"text":92,"correct":22},"采用涂刷薄膜养护剂养护时，养护剂应通过试验确定，并应制定操作工艺",{"key":30,"text":94,"correct":22},"掺用缓凝型外加剂或有抗渗等要求以及高强度混凝土，不少于14d",{"key":33,"text":96,"correct":35},"使用真空吸水的混凝土，可在保证强度条件下适当加长养护时间","ACD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":82,"analysis":37},1149478,"混凝土的()之和不应超过混凝土的初凝时间。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"运输时间",{"key":24,"text":105,"correct":22},"浇筑时间",{"key":27,"text":107,"correct":22},"间歇时间",{"key":30,"text":109,"correct":35},"拌合时间",{"key":33,"text":111,"correct":35},"出料时间",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1149479,"浇筑混凝土前，应检查模板、支架的()，检查钢筋及预埋件的位置，规格，并做好记录。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"承载力",{"key":24,"text":119,"correct":35},"数量",{"key":27,"text":121,"correct":22},"刚度",{"key":30,"text":123,"correct":35},"材质",{"key":33,"text":125,"correct":22},"稳定性","ACE",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":139,"analysis":37},1149480,"混凝土的运输能力应满足()的要求。",[131,133,134,136,137],{"key":20,"text":132,"correct":22},"凝结速度",{"key":24,"text":105,"correct":35},{"key":27,"text":135,"correct":22},"浇筑速度",{"key":30,"text":103,"correct":35},{"key":33,"text":138,"correct":35},"检测时间","AC",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":52,"analysis":37},1149481,"在计算预应力筋下料长度时，应考虑的因素有()。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"结构的孔道长度",{"key":24,"text":147,"correct":22},"锚夹具长度",{"key":27,"text":149,"correct":22},"千斤顶长度",{"key":30,"text":151,"correct":35},"工作长度",{"key":33,"text":153,"correct":22},"外露长度",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},1149482,"有关预应力筋制作的说法，正确的有()。",[158,160,162,164,166],{"key":20,"text":159,"correct":35},"预应力筋宜使用砂轮锯或切断机切断，可采用电弧切割",{"key":24,"text":161,"correct":22},"预应力筋采用镦头锚固时，高强度钢丝宜采用液压冷镦",{"key":27,"text":163,"correct":35},"钢丝和钢绞线束移运时支点距离不得大于5m",{"key":30,"text":165,"correct":22},"冷拔低碳钢丝可采用冷冲镦粗",{"key":33,"text":167,"correct":22},"预应力筋由多根钢丝或钢绞线组成时，在同束预应力钢筋内，应采用强度相等的预应力钢材","BDE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1149483,"后张有粘结预应力混凝土结构中，预应力筋的孔道应满足如下要求()。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"足够的强度",{"key":24,"text":176,"correct":22},"足够的刚度",{"key":27,"text":178,"correct":35},"壁厚要求",{"key":30,"text":180,"correct":22},"不允许漏浆",{"key":33,"text":182,"correct":22},"能按要求传递粘结力","ABDE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":183,"analysis":37},1149484,"后张预应力锚具和连接器按照锚固方式不同可分为()。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"夹片式",{"key":24,"text":191,"correct":22},"组合式",{"key":27,"text":193,"correct":35},"锥塞式",{"key":30,"text":195,"correct":22},"握裹式",{"key":33,"text":197,"correct":22},"支承式",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":208,"analysis":37},1149485,"后张预应力锚具和连接器按照锚固方式不同，可分为()等锚具。",[202,203,204,206,207],{"key":20,"text":189,"correct":22},{"key":24,"text":197,"correct":22},{"key":27,"text":205,"correct":35},"铰接式",{"key":30,"text":195,"correct":22},{"key":33,"text":193,"correct":35},"ABD",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":97,"analysis":37},1149486,"预应力钢筋混凝土不宜或不得使用下列品种的水泥()。",[213,215,217,219,221],{"key":20,"text":214,"correct":22},"矿渣水泥",{"key":24,"text":216,"correct":35},"硅酸盐水泥",{"key":27,"text":218,"correct":22},"火山灰水泥",{"key":30,"text":220,"correct":22},"粉煤灰水泥",{"key":33,"text":222,"correct":35},"普通硅酸盐水泥",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":67,"analysis":37},1149487,"后张法预应力管道安装要求中说法正确的有()。",[227,229,231,233,235],{"key":20,"text":228,"correct":35},"金属管道应采用钢管连接",{"key":24,"text":230,"correct":22},"管道应采用定位钢筋牢固地固定于设计位置",{"key":27,"text":232,"correct":22},"管道检查合格后应及时封堵端面",{"key":30,"text":234,"correct":22},"管道应留压浆孔与溢浆孔",{"key":33,"text":236,"correct":35},"管道安装后，需在其附近进行焊接作业时，可不对管道采取保护措施",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":36,"analysis":37},1149488,"进行桥面防水层施工前，应检查基层混凝土的()。",[241,243,245,247,249],{"key":20,"text":242,"correct":22},"强度",{"key":24,"text":244,"correct":22},"含水率",{"key":27,"text":246,"correct":22},"表面粗糙度",{"key":30,"text":248,"correct":22},"表面平整度",{"key":33,"text":250,"correct":35},"粘结强度",{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":265,"analysis":37},1149489,"防水基层处理剂应根据()选用。",[255,257,259,261,263],{"key":20,"text":256,"correct":22},"防水层类型",{"key":24,"text":258,"correct":35},"基层混凝土平整度",{"key":27,"text":260,"correct":22},"基层混凝土龄期",{"key":30,"text":262,"correct":22},"基层混凝土含水率",{"key":33,"text":264,"correct":22},"铺设防水层前对处理剂的要求","ACDE",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":126,"analysis":37},1149490,"桥面卷材防水层铺设前应先做好()等部位的局部处理，然后再进行大面积铺设。",[270,272,274,276,278],{"key":20,"text":271,"correct":22},"节点",{"key":24,"text":273,"correct":35},"伸缩缝",{"key":27,"text":275,"correct":22},"转角",{"key":30,"text":277,"correct":35},"缘石衔接处",{"key":33,"text":279,"correct":22},"排水口",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":126,"analysis":37},1149491,"桥面防水层体系的施工，严禁在()时进行。",[284,286,288,290,292],{"key":20,"text":285,"correct":22},"下雨",{"key":24,"text":287,"correct":35},"环境气温高于5℃",{"key":27,"text":289,"correct":22},"下雪",{"key":30,"text":291,"correct":35},"基面层的温度高于0℃",{"key":33,"text":293,"correct":22},"风力≥5级",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":308,"analysis":37},1149492,"不属于土石围堰类型的有()。",[298,300,302,304,306],{"key":20,"text":299,"correct":35},"土围堰",{"key":24,"text":301,"correct":22},"钢套箱围堰",{"key":27,"text":303,"correct":35},"木桩竹条土围堰",{"key":30,"text":305,"correct":35},"竹、铅丝笼围堰",{"key":33,"text":307,"correct":22},"双壁围堰","BE",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":208,"analysis":37},1149493,"对现场填筑土围堰的施工要求是()。",[313,315,317,319,321],{"key":20,"text":314,"correct":22},"围堰填筑应自上游开始至下游合龙",{"key":24,"text":316,"correct":22},"筑堰材料宜用黏性土、粉质黏土或砂质黏土",{"key":27,"text":318,"correct":35},"打木桩固定",{"key":30,"text":320,"correct":22},"必须将堰底下河床底上的杂物、石块及树根等清除干净",{"key":33,"text":322,"correct":35},"填出水面之前要分层夯实",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":36,"analysis":37},1149494,"施工中经常采用的土袋围堰的施工要求是()。",[327,329,331,333,335],{"key":20,"text":328,"correct":22},"土袋中宜装不渗水的黏性土",{"key":24,"text":330,"correct":22},"堰外边坡为1:0.5～1:1，内边坡为1:0.2～1:0.5",{"key":27,"text":332,"correct":22},"围堰中心部分可填筑黏土及黏性土芯墙",{"key":30,"text":334,"correct":22},"堆袋应自上游开始至下游合龙",{"key":33,"text":336,"correct":35},"要分层夯实",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":351,"analysis":37},1149495,"钢围堰浮运定位时，应对()时的稳定性进行验算。",[341,343,345,347,349],{"key":20,"text":342,"correct":35},"下沉",{"key":24,"text":344,"correct":22},"就位",{"key":27,"text":346,"correct":22},"浮运",{"key":30,"text":348,"correct":35},"吊装",{"key":33,"text":350,"correct":22},"着床","BCE",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":366,"analysis":37},1149496,"城市桥梁工程常用的桩基础，按成桩的施工方法可分为()。",[356,358,360,362,364],{"key":20,"text":357,"correct":35},"旋喷桩",{"key":24,"text":359,"correct":35},"护壁桩",{"key":27,"text":361,"correct":22},"沉入（锤击）桩",{"key":30,"text":363,"correct":22},"钻孔灌注桩",{"key":33,"text":365,"correct":22},"人工挖孔桩","CDE",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":52,"analysis":37},1149497,"沉入桩施工桩锤的选用应根据()等因素确定。",[371,373,375,377,379],{"key":20,"text":372,"correct":22},"桩型",{"key":24,"text":374,"correct":22},"桩的密集程度",{"key":27,"text":376,"correct":22},"施工条件",{"key":30,"text":378,"correct":35},"辅助施工方法",{"key":33,"text":380,"correct":22},"单桩竖向承载力",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":97,"analysis":37},1149498,"关于沉入桩沉桩顺序的说法，正确的有()。",[385,387,389,391,393],{"key":20,"text":386,"correct":22},"宜先大桩后小桩，先长桩后短桩",{"key":24,"text":388,"correct":35},"宜先小桩后大桩，先短桩后长桩",{"key":27,"text":390,"correct":22},"自中间向两个方向对称施打",{"key":30,"text":392,"correct":22},"自中间向四周对称施打",{"key":33,"text":394,"correct":35},"自四周向中间对称施打",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":351,"analysis":37},1149499,"钻孔灌注桩施工所用泥浆配合比应根据()设计。",[399,401,403,405,407],{"key":20,"text":400,"correct":35},"清孔方法",{"key":24,"text":402,"correct":22},"地质条件",{"key":27,"text":404,"correct":22},"钻孔工艺",{"key":30,"text":406,"correct":35},"钻孔速度",{"key":33,"text":408,"correct":22},"钻孔设备",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":423,"analysis":37},1149500,"关于正、反循环钻孔施工的说法，正确的有()。",[413,415,417,419,421],{"key":20,"text":414,"correct":35},"每钻进4～5m应验孔一次",{"key":24,"text":416,"correct":22},"设计未要求时摩擦型桩的沉渣厚度不应大于300mm",{"key":27,"text":418,"correct":22},"泥浆护壁成孔时根据泥浆补给情况控制钻进速度；保持钻机稳定",{"key":30,"text":420,"correct":22},"发生斜孔、塌孔和护筒周围冒浆、失稳等现象时，应先停钻",{"key":33,"text":422,"correct":22},"钻孔达到设计深度，灌注混凝土之前，孔底沉渣厚度应符合设计要求","BCDE",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":265,"analysis":37},1149501,"有关泥浆护壁冲击钻成孔叙述，正确的有()。",[428,430,432,434,436],{"key":20,"text":429,"correct":22},"冲击钻开孔时，应低锤密击，反复冲击造壁，保持孔内泥浆面稳定",{"key":24,"text":431,"correct":35},"每钻进6～8m应验孔一次，在更换钻头前或容易缩孔处，均应验孔并应做记录",{"key":27,"text":433,"correct":22},"排渣过程中应及时补给泥浆",{"key":30,"text":435,"correct":22},"稳定性差的孔壁应采用泥浆循环或抽渣筒排渣",{"key":33,"text":437,"correct":22},"清孔后灌注混凝土之前的泥浆指标符合要求",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":366,"analysis":37},1149502,"关于灌注桩水下混凝土灌注用导管要求的说法，正确的有()。",[442,444,446,448,450],{"key":20,"text":443,"correct":35},"导管直径宜为20～30cm，节长宜为3m",{"key":24,"text":445,"correct":35},"导管不得漏水，试压的压力宜为孔底静水压力的1.2倍",{"key":27,"text":447,"correct":22},"导管采用法兰盘接头宜加锥形活套",{"key":30,"text":449,"correct":22},"导管轴线偏差不宜超过孔深的0.5%，且不宜大于10cm",{"key":33,"text":451,"correct":22},"采用螺旋丝扣型接头时必须有防止松脱装置",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":126,"analysis":37},1149503,"关于重力式混凝土墩、台施工的说法，正确的有()。",[456,458,460,462,464],{"key":20,"text":457,"correct":22},"墩台混凝土浇筑前应对基础混凝土顶面做凿毛处理，清除锚筋污锈",{"key":24,"text":459,"correct":35},"墩台水平截面积在200㎡内的分块数量不得超过4块",{"key":27,"text":461,"correct":22},"墩台混凝土宜水平分层浇筑，每层高度宜为1.5～2m",{"key":30,"text":463,"correct":35},"墩台混凝土分块浇筑时，接缝应与墩台截面尺寸较大的一边平行",{"key":33,"text":465,"correct":22},"墩台水平截面积在300㎡以内的分块数量不得超过3块",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":67,"analysis":37},1149504,"悬臂浇筑法施工连续梁合龙段时，应符合的规定有()。",[470,472,474,476,478],{"key":20,"text":471,"correct":35},"合龙前，应在两端悬臂预加压重，直至施工完成后撤除",{"key":24,"text":473,"correct":22},"合龙前，应将合龙跨一侧桥墩的临时锚固放松",{"key":27,"text":475,"correct":22},"合龙段的混凝土强度提高一级的主要目的是尽早施加预应力",{"key":30,"text":477,"correct":22},"合龙段的长度可为2m",{"key":33,"text":479,"correct":35},"合龙段应在一天中气温最高时进行",{"id":481,"libraryId":5,"type":15,"typeLabel":16,"stem":482,"options":483,"answer":494,"analysis":37},1149505,"以下关于连续梁的合龙、体系转换和支座反力调整规定的选项中，说法正确的有()。",[484,486,488,490,492],{"key":20,"text":485,"correct":22},"合龙前应观测气温变化与梁端高程及悬臂端间距的关系",{"key":24,"text":487,"correct":22},"合龙前按设计规定将两悬臂端合龙口予以临时连接",{"key":27,"text":489,"correct":35},"合龙前在两端悬臂预加压重，浇筑混凝土前逐步撤除",{"key":30,"text":491,"correct":35},"合龙宜在一天中气温最高时进行",{"key":33,"text":493,"correct":22},"梁跨体系转换时，支座反力的调整应以高程控制为主，反力作为校核","ABE",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":36,"analysis":37},1149506,"预应力混凝土连续梁采用挂蓝悬臂浇筑工法施工，其中节段前端高程的确定是连续梁施工控制的关键。确定悬臂浇筑段前端底板标高应考虑的因素有（）。",[499,501,503,505,507],{"key":20,"text":500,"correct":22},"挂篮前端的变形值",{"key":24,"text":502,"correct":22},"预拱度",{"key":27,"text":504,"correct":22},"已浇筑段的实际标高",{"key":30,"text":506,"correct":22},"温度影响",{"key":33,"text":508,"correct":35},"墩柱沉降",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":67,"analysis":37},1149507,"钢梁制作与安装技术的要求包括()。",[513,515,517,519,521],{"key":20,"text":514,"correct":35},"钢梁制造焊接应在室内进行，相对湿度不宜高于60％",{"key":24,"text":516,"correct":22},"主要杆件应在组装后24h内焊接",{"key":27,"text":518,"correct":22},"钢梁制造焊接采用普通碳素结构钢时，焊接环境温度不应低于0℃",{"key":30,"text":520,"correct":22},"钢梁制造焊接采用低合金高强度结构钢时，焊接环境温度不应低于5℃",{"key":33,"text":522,"correct":35},"当钢材表面有锈蚀、麻点或划痕等缺陷时，其深度不得大于该钢材厚度允许负偏差值的1／3",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":536,"analysis":37},1149508,"钢梁制作基本要求中，以下表述正确的有()。",[527,529,530,532,534],{"key":20,"text":528,"correct":22},"钢梁制造焊接环境相对湿度不宜高于80%",{"key":24,"text":516,"correct":22},{"key":27,"text":531,"correct":35},"钢梁在现场必须进行试拼装，并应按设计和有关规范的要求验收",{"key":30,"text":533,"correct":35},"钢梁制作的工艺中，不需要对构件变形矫正",{"key":33,"text":535,"correct":35},"钢梁出厂后，安装企业应对钢梁质量和应交付的文件进行验收，确认合格","AB",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":168,"analysis":37},1149509,"钢梁安装前检查的内容包括()。",[541,543,545,547,549],{"key":20,"text":542,"correct":35},"钢梁的焊接质量",{"key":24,"text":544,"correct":22},"对临时支架、支承、吊机等临时结构和钢梁结构本身在不同受力状态下的强度、刚度及稳定性进行验算",{"key":27,"text":546,"correct":35},"钢梁的几何尺寸",{"key":30,"text":548,"correct":22},"对桥台、墩顶面高程、中线及各孔跨径进行复测",{"key":33,"text":550,"correct":22},"按照构件明细表核对进场的构件零件，查验产品出厂合格证及材料的质量证明书",{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":36,"analysis":37},1149510,"关于钢梁制作的基本要求的说法，正确的是()。",[555,557,558,560,562],{"key":20,"text":556,"correct":22},"低合金高强度结构钢不得低于5℃",{"key":24,"text":516,"correct":22},{"key":27,"text":559,"correct":22},"钢梁出厂前，安装企业应对钢梁质量和应交付的文件进行验收，确认合格",{"key":30,"text":561,"correct":22},"钢梁出厂前必须进行试拼装，并应按设计和有关规范的要求验收",{"key":33,"text":563,"correct":35},"钢梁制造焊接环境相对湿度不宜高于90%",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":36,"analysis":37},1149511,"钢梁制造企业应向安装企业提供的文件包括()。",[568,570,572,574,576],{"key":20,"text":569,"correct":22},"钢材质量证明书和检验报告",{"key":24,"text":571,"correct":22},"杆件发运和包装清单",{"key":27,"text":573,"correct":22},"产品合格证",{"key":30,"text":575,"correct":22},"产品试板的试验报告",{"key":33,"text":577,"correct":35},"生产许可证",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":67,"analysis":37},1149512,"钢筋（管）混凝土拱桥的拱架种类按材料分为()。",[582,584,586,588,590],{"key":20,"text":583,"correct":35},"扇架式",{"key":24,"text":585,"correct":22},"竹拱架",{"key":27,"text":587,"correct":22},"钢拱架",{"key":30,"text":589,"correct":22},"土牛拱胎架",{"key":33,"text":591,"correct":35},"排架式",{"id":593,"libraryId":5,"type":15,"typeLabel":16,"stem":594,"options":595,"answer":183,"analysis":37},1149513,"斜拉桥索塔施工必须制定整体和局部的安全措施，主要有()。",[596,598,600,602,604],{"key":20,"text":597,"correct":22},"设置塔吊起吊重量限制器",{"key":24,"text":599,"correct":22},"设置断索防护器",{"key":27,"text":601,"correct":35},"避免上部塔体施工时对下部塔体表面的污染",{"key":30,"text":603,"correct":22},"防范雷击、强风、暴雨、寒暑、飞行器对施工影响",{"key":33,"text":605,"correct":22},"应对塔吊、支架安装、使用和拆除阶段的强度稳定等进行计算和检查",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":423,"analysis":37},1149514,"斜拉桥主梁施工方法大体上分为（）等几种",[610,612,614,616,618],{"key":20,"text":611,"correct":35},"吊装法",{"key":24,"text":613,"correct":22},"平转法",{"key":27,"text":615,"correct":22},"支架法",{"key":30,"text":617,"correct":22},"顶推法",{"key":33,"text":619,"correct":22},"悬臂法",{"id":621,"libraryId":5,"type":15,"typeLabel":16,"stem":622,"options":623,"answer":265,"analysis":37},1149515,"施工过程中，必须对主梁各个施工阶段的（）等进行检测，并应及时将有关数据反馈给设计单位。",[624,626,628,630,632],{"key":20,"text":625,"correct":22},"拉索索力",{"key":24,"text":627,"correct":35},"主塔线型",{"key":27,"text":629,"correct":22},"主梁标高",{"key":30,"text":631,"correct":22},"塔梁内力",{"key":33,"text":633,"correct":22},"塔索位移量",{"id":635,"libraryId":5,"type":15,"typeLabel":16,"stem":636,"options":637,"answer":183,"analysis":37},1149516,"现浇混凝土斜拉桥主梁施工时，应采取措施防止合龙梁段施工出现的裂缝，以下措施正确的是()。",[638,640,642,644,646],{"key":20,"text":639,"correct":22},"不间断观测合龙前数日昼夜环境温度变化与合龙高程及合龙口长度变化的关系",{"key":24,"text":641,"correct":22},"可视情况进行适当压重",{"key":27,"text":643,"correct":35},"预应力索张拉后禁止施工荷载的不平衡变化",{"key":30,"text":645,"correct":22},"确定适宜的合龙时间和合龙程序",{"key":33,"text":647,"correct":22},"采取临时措施调节合龙口的应力和合龙口长度",{"id":649,"libraryId":5,"type":15,"typeLabel":16,"stem":650,"options":651,"answer":126,"analysis":37},1149517,"斜拉桥施工监控测试的主要内容有()。",[652,654,655,657,659],{"key":20,"text":653,"correct":22},"变形",{"key":24,"text":629,"correct":35},{"key":27,"text":656,"correct":22},"应力",{"key":30,"text":658,"correct":35},"支座力",{"key":33,"text":660,"correct":22},"温度",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":168,"analysis":37},1149518,"斜拉桥钢主梁施工时，应连续观测钢梁的温度变形，以便采取正确的合龙措施，以下措施正确的是()。",[665,667,669,671,673],{"key":20,"text":666,"correct":35},"确定合龙时间",{"key":24,"text":668,"correct":22},"确定合龙程序",{"key":27,"text":670,"correct":35},"调节合龙口长度",{"key":30,"text":672,"correct":22},"满足钢梁安装就位时高强螺栓定位所需的时间",{"key":33,"text":674,"correct":22},"确定合龙温度",{"id":676,"libraryId":5,"type":15,"typeLabel":16,"stem":677,"options":678,"answer":36,"analysis":37},1149519,"以下关于钢梁安装质量验收主控项目正确的有()。",[679,681,683,685,687],{"key":20,"text":680,"correct":22},"焊缝探伤检验符合设计要求",{"key":24,"text":682,"correct":22},"涂装检验符合《城市桥梁工程施工与质量验收规范》CJJ2-2008有关规定",{"key":27,"text":684,"correct":22},"高强螺栓的栓接板面（摩擦面）除锈后的抗滑移系数符合设计要求",{"key":30,"text":686,"correct":22},"高强度螺栓连接副等紧固件及其连接符合设计要求",{"key":33,"text":688,"correct":35},"预拱度符合设计要求",{"id":690,"libraryId":5,"type":15,"typeLabel":16,"stem":691,"options":692,"answer":168,"analysis":37},1149520,"钢—混凝土组合梁施工，浇筑混凝土前应对钢主梁的()进行检查验收。",[693,695,697,699,701],{"key":20,"text":694,"correct":35},"焊接质量",{"key":24,"text":696,"correct":22},"安装位置",{"key":27,"text":698,"correct":35},"几何尺寸",{"key":30,"text":700,"correct":22},"纵横向连接",{"key":33,"text":702,"correct":22},"施工支架",{"id":704,"libraryId":5,"type":15,"typeLabel":16,"stem":705,"options":706,"answer":208,"analysis":37},1149521,"钢-混凝土组合梁混凝土桥面应全断面连续浇筑，以下浇筑顺序正确的是()。",[707,709,711,713,715],{"key":20,"text":708,"correct":22},"顺桥向自跨中向支点处浇筑",{"key":24,"text":710,"correct":22},"顺桥向由一端开始浇筑",{"key":27,"text":712,"correct":35},"顺桥向自两端向跨中浇筑",{"key":30,"text":714,"correct":22},"横桥向由中间向两侧浇筑",{"key":33,"text":716,"correct":35},"横桥向由两侧向中间浇筑",{"id":718,"libraryId":5,"type":15,"typeLabel":16,"stem":719,"options":720,"answer":139,"analysis":37},1149522,"对于钢—混凝土组合连续梁，调整负弯矩区内力的方法有()。",[721,723,725,727,729],{"key":20,"text":722,"correct":22},"在负弯矩区施加预应力",{"key":24,"text":724,"correct":35},"在正弯矩区施加预应力",{"key":27,"text":726,"correct":22},"强迫位移法",{"key":30,"text":728,"correct":35},"自动位移法",{"key":33,"text":730,"correct":35},"以上都不对",[732,736,739,742,745,748],{"id":733,"name":734,"category":7,"favorite":735},1,"领导干部任职前廉政法规知识测试题",92,{"id":737,"name":738,"category":7,"favorite":733},595,"建筑结构与设备",{"id":740,"name":741,"category":7,"favorite":733},715,"招标采购专业知识与法律法规",{"id":743,"name":744,"category":7,"favorite":733},848,"市政方向-通用基础",{"id":746,"name":747,"category":7,"favorite":8},534,"BIM工程师",{"id":749,"name":747,"category":7,"favorite":8},535]