[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-30":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":734},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,30,50,2019,[13,38,53,68,83,98,112,127,142,157,172,186,200,211,225,240,254,267,281,295,310,324,338,352,366,380,395,409,422,436,450,464,478,492,507,521,535,549,563,577,591,606,621,635,649,663,678,692,706,720],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149423,2,"多选题","软土路基在较大的荷载作用下易发生()，造成路基失稳。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","整体剪切",true,{"key":24,"text":25,"correct":22},"B","局部剪切",{"key":27,"text":28,"correct":29},"C","整体开裂",false,{"key":31,"text":32,"correct":29},"D","局部开裂",{"key":34,"text":35,"correct":22},"E","刺入破坏","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149424,"在大规模的道路工程中常会遇到软土路基，而常用的处理方法有()等。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"换填法",{"key":24,"text":45,"correct":29},"振动压实法",{"key":27,"text":47,"correct":29},"挤密法",{"key":31,"text":49,"correct":22},"垂直排水固结法",{"key":34,"text":51,"correct":29},"夯实法","AD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149425,"膨胀土其显著的胀缩特性可使路基发生()等严重的破坏。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"变形",{"key":24,"text":60,"correct":29},"崩塌",{"key":27,"text":62,"correct":22},"位移",{"key":31,"text":64,"correct":22},"开裂",{"key":34,"text":66,"correct":22},"隆起","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1149426,"对于季节性冻土，为了防止路面因路基冻胀发生变形而破坏，在路基施工中以下说法正确的有：()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"可增加路基总高度",{"key":24,"text":75,"correct":29},"防冻层厚度可按地区经验确定",{"key":27,"text":77,"correct":29},"地下水在冻结前或冻结过程中应渗入到路基顶部，不得渗入路基底部",{"key":31,"text":79,"correct":22},"选用不发生冻胀的路面结构层材料",{"key":34,"text":81,"correct":22},"可采用多孔矿渣作为隔温材料","ADE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1149427,"土中水有固、液、气三种形态，其中液态水有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"吸着水",{"key":24,"text":90,"correct":22},"薄膜水",{"key":27,"text":92,"correct":22},"毛细水",{"key":31,"text":94,"correct":22},"重力水",{"key":34,"text":96,"correct":29},"水蒸气","ABCD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":111,"analysis":37},1149428,"水与土体相互作用，可以导致道路路基或地下构筑物周围土体软化，并可能产生()等事故。",[102,104,106,108,109],{"key":20,"text":103,"correct":22},"沉陷",{"key":24,"text":105,"correct":22},"冻胀",{"key":27,"text":107,"correct":22},"管涌",{"key":31,"text":64,"correct":29},{"key":34,"text":110,"correct":22},"滑坡","ABCE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},1149429,"路基施工要求，当原地面标高低于设计路基标高时，需要填筑土方，其具体要求包括()。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"根据测量中心线桩和下坡脚桩，分层填土、压实",{"key":24,"text":119,"correct":29},"填方高度内的管涵顶面填土300mm以上才能用压路机碾压",{"key":27,"text":121,"correct":22},"填方段内应事先找平，当地面坡度陡于1：5时，需修成台阶形式，每层台阶高度不宜大于300mm，宽度不应小于1.0m",{"key":31,"text":123,"correct":22},"排除原地面积水，清除树根、杂草、淤泥等",{"key":34,"text":125,"correct":29},"碾压前检查铺筑土层的宽度与厚度，合格后方可碾压，碾压“先重后轻”，最后碾压应采用不小于12t级的压路机","ACD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},1149430,"土的路用工程基本指标有()等。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"天然密度",{"key":24,"text":134,"correct":22},"孔隙率",{"key":27,"text":136,"correct":29},"细度模数",{"key":31,"text":138,"correct":22},"液性指数",{"key":34,"text":140,"correct":22},"塑限","ABDE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},1149431,"承压水存在于地下两个隔水层之间，具有高水头补给特点，一般须注意其向上的排泄，即()。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"补给潜水",{"key":24,"text":149,"correct":29},"补给滞水",{"key":27,"text":151,"correct":22},"补给地表水",{"key":31,"text":153,"correct":29},"补给毛细水",{"key":34,"text":155,"correct":22},"以上升泉的形式出露","ACE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":171,"analysis":37},1149432,"水泥稳定土与石灰稳定土相比具有许多特点，以下说法正确的是()。",[161,163,165,167,169],{"key":20,"text":162,"correct":29},"板体性较差",{"key":24,"text":164,"correct":22},"抗冻性好",{"key":27,"text":166,"correct":22},"初期强度高",{"key":31,"text":168,"correct":22},"水稳性好",{"key":34,"text":170,"correct":29},"温缩特性不明显","BCD",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":156,"analysis":37},1149433,"关于石灰稳定土类基层，说法正确的是()。",[176,178,180,182,184],{"key":20,"text":177,"correct":22},"石灰稳定土有良好的板体性",{"key":24,"text":179,"correct":29},"石灰土的强度随龄期增长，但与养护温度无关",{"key":27,"text":181,"correct":22},"石灰土已被严格禁止用于高等级路面的基层，只能用作高级路面的底基层",{"key":31,"text":183,"correct":29},"其水稳性不如水泥稳定土，但抗冻性比水泥稳定土好",{"key":34,"text":185,"correct":22},"石灰稳定土的干缩和温缩特性十分明显",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":141,"analysis":37},1149434,"目前大量采用的无机结合料稳定基层，其特点主要有()。",[190,192,194,196,198],{"key":20,"text":191,"correct":22},"结构较密实",{"key":24,"text":193,"correct":22},"水稳性较好",{"key":27,"text":195,"correct":29},"孔隙率较大",{"key":31,"text":197,"correct":22},"适于机械化施工",{"key":34,"text":199,"correct":22},"透水性较小",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":97,"analysis":37},1149435,"目前大量采用的无机结合料稳定基层材料，都具备（）特点。2018真题",[204,205,206,207,209],{"key":20,"text":191,"correct":22},{"key":24,"text":199,"correct":22},{"key":27,"text":193,"correct":22},{"key":31,"text":208,"correct":22},"孔隙率较小",{"key":34,"text":210,"correct":29},"干缩性较大",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":156,"analysis":37},1149436,"常用无机结合料稳定类基层材料有()。",[215,217,219,221,223],{"key":20,"text":216,"correct":22},"水泥稳定类基层",{"key":24,"text":218,"correct":29},"沥青稳定基层",{"key":27,"text":220,"correct":22},"石灰稳定类基层",{"key":31,"text":222,"correct":29},"级配砾石基层",{"key":34,"text":224,"correct":22},"石灰工业废渣稳定类基层",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":239,"analysis":37},1149437,"城镇道路基层工程中，()是影响路面使用性能和使用寿命的最关键因素。",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"基层材料",{"key":24,"text":232,"correct":22},"施工质量",{"key":27,"text":234,"correct":29},"温度",{"key":31,"text":236,"correct":29},"地质条件",{"key":34,"text":238,"correct":29},"水文条件","AB",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":67,"analysis":37},1149438,"以下关于石灰稳定土基层运输与摊铺施工技术要点正确的是()。",[244,246,248,250,252],{"key":20,"text":245,"correct":22},"雨期施工应防止混合料淋雨",{"key":24,"text":247,"correct":29},"应在第一次重冰冻到来之前一到一个半月内完成施工",{"key":27,"text":249,"correct":22},"降雨时应停止施工，已摊铺的应尽快碾压密实",{"key":31,"text":251,"correct":22},"运输中应采取防止水分蒸发措施",{"key":34,"text":253,"correct":22},"拌成的稳定土应及时运送到铺筑现场",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":111,"analysis":37},1149439,"城镇道路基层施工时，石灰稳定土基层与水泥稳定土基层的运输与摊铺的规定有()。",[258,260,262,263,265],{"key":20,"text":259,"correct":22},"拌成的稳定土类混合料应及时运送到铺筑现场",{"key":24,"text":261,"correct":22},"厂拌石灰土类混合料摊铺时路床应湿润",{"key":27,"text":249,"correct":22},{"key":31,"text":264,"correct":29},"宜在秋末和气温较低季节施工，施工最低气温为-5℃",{"key":34,"text":266,"correct":22},"运输中应采取防止水分蒸发和防扬尘措施",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":36,"analysis":37},1149440,"下列关于水泥稳定土施工说法正确的是()。",[271,273,275,277,279],{"key":20,"text":272,"correct":22},"宜在水泥初凝前碾压成活",{"key":24,"text":274,"correct":22},"直线和不设超高的平曲线段，应由两侧向中心碾压",{"key":27,"text":276,"correct":29},"横向接缝宜设在路中线处",{"key":31,"text":278,"correct":29},"纵向接缝应尽量减少",{"key":34,"text":280,"correct":22},"稳定土养护期应封闭交通",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":156,"analysis":37},1149441,"下列关于石灰粉煤灰稳定砂砾（碎石）基层的压实与养护，叙述正确的有()。",[285,287,289,291,293],{"key":20,"text":286,"correct":22},"碾压时采用先轻型、后重型压路机碾压",{"key":24,"text":288,"correct":29},"可采用薄层贴补的方法进行找平",{"key":27,"text":290,"correct":22},"混合料的养护采用湿养",{"key":31,"text":292,"correct":29},"不得采用沥青乳液和沥青下封层进行养护",{"key":34,"text":294,"correct":22},"石灰粉煤灰稳定砂砾（碎石）基层每层最大压实厚度为200mm，且不宜小于100mm",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":309,"analysis":37},1149442,"以下关于二灰混合料的养护方法正确的是()。",[299,301,303,305,307],{"key":20,"text":300,"correct":29},"蒸养",{"key":24,"text":302,"correct":22},"施作沥青乳液封层",{"key":27,"text":304,"correct":22},"湿养",{"key":31,"text":306,"correct":29},"自然养护",{"key":34,"text":308,"correct":22},"施作沥青封层","BCE",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":111,"analysis":37},1149443,"以下选项中，()可采用土工合成材料施工。",[314,316,318,320,322],{"key":20,"text":315,"correct":22},"路堤加筋",{"key":24,"text":317,"correct":22},"台背路基填土加筋",{"key":27,"text":319,"correct":22},"路面裂缝防治",{"key":31,"text":321,"correct":29},"路基加筋",{"key":34,"text":323,"correct":22},"过滤与排水",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":97,"analysis":37},1149444,"用于路面裂缝防治的土工合成材料应满足的技术要求有()。",[328,330,332,334,336],{"key":20,"text":329,"correct":22},"抗拉强度",{"key":24,"text":331,"correct":22},"最大负荷延伸率",{"key":27,"text":333,"correct":22},"单位面积质量",{"key":31,"text":335,"correct":22},"网孔尺寸",{"key":34,"text":337,"correct":29},"搭接长度",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":111,"analysis":37},1149445,"用土工合成材料和沥青混凝土面层对旧沥青路面裂缝进行防治的施工要点是()。",[342,344,346,348,350],{"key":20,"text":343,"correct":22},"旧路面清洁与整平",{"key":24,"text":345,"correct":22},"搭接和固定",{"key":27,"text":347,"correct":22},"土工合成材料张拉",{"key":31,"text":349,"correct":29},"铺沥青面层",{"key":34,"text":351,"correct":22},"洒布粘层油",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":111,"analysis":37},1149446,"只能用作高级路面的底基层的材料有（）等。",[356,358,360,362,364],{"key":20,"text":357,"correct":22},"水泥土",{"key":24,"text":359,"correct":22},"石灰稳定土",{"key":27,"text":361,"correct":22},"水泥稳定细粒土",{"key":31,"text":363,"correct":29},"二灰稳定土粒料",{"key":34,"text":365,"correct":22},"二灰稳定土",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":141,"analysis":37},1149447,"土工合成材料施工质量检验基本要求，正确的有()。",[370,372,374,376,378],{"key":20,"text":371,"correct":22},"土工合成材料质量应符合设计要求或相关标准规定",{"key":24,"text":373,"correct":22},"外观无破损、无老化、无污染",{"key":27,"text":375,"correct":29},"在平整的下承层上按设计要求铺设，可不锚固",{"key":31,"text":377,"correct":22},"接缝连接强度应符合要求",{"key":34,"text":379,"correct":22},"上、下层土工合成材料搭接缝应交替错开",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":394,"analysis":37},1149448,"热拌沥青混合料路面施工工艺，其主要包括沥青混合料的运输、摊铺、沥青路面的压实和()等内容。",[384,386,388,390,392],{"key":20,"text":385,"correct":22},"成型",{"key":24,"text":387,"correct":22},"接缝",{"key":27,"text":389,"correct":29},"试验",{"key":31,"text":391,"correct":22},"开放交通",{"key":34,"text":393,"correct":29},"检测","ABD",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":36,"analysis":37},1149449,"沥青混合料摊铺机必须缓慢、均匀、连续不间断地摊铺，当发现沥青混合料面层出现明显的()等现象时，应分析原因，予以及时消除。",[399,401,403,405,407],{"key":20,"text":400,"correct":22},"波浪",{"key":24,"text":402,"correct":22},"裂缝",{"key":27,"text":404,"correct":29},"轮迹",{"key":31,"text":406,"correct":29},"错缝",{"key":34,"text":408,"correct":22},"离析",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":126,"analysis":37},1149450,"沥青混合料的松铺系数应根据试铺试压确定，摊铺过程中应随时检查()，并辅以使用的沥青混合料总量与面积校验平均厚度。",[413,415,417,419,421],{"key":20,"text":414,"correct":22},"路拱",{"key":24,"text":416,"correct":29},"平整度",{"key":27,"text":418,"correct":22},"横坡",{"key":31,"text":420,"correct":22},"层厚",{"key":34,"text":387,"correct":29},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":394,"analysis":37},1149451,"热拌沥青混合料路面压实成型与接缝，说法正确的有()。",[426,428,430,432,434],{"key":20,"text":427,"correct":22},"沥青路面施工应配备足够数量、状态完好的压路机",{"key":24,"text":429,"correct":22},"碾压速度做到慢而均匀",{"key":27,"text":431,"correct":29},"在超高路段和坡道上则由高处向低处碾压",{"key":31,"text":433,"correct":22},"复压应紧跟在初压后开始，不得随意停顿",{"key":34,"text":435,"correct":29},"沥青混合料路面接缝必须紧密、平顺，错缝不得用直尺检查",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":97,"analysis":37},1149452,"压路机的碾压温度应根据()等因素经试压确定。",[440,442,444,446,448],{"key":20,"text":441,"correct":22},"气温",{"key":24,"text":443,"correct":22},"铺筑层厚度",{"key":27,"text":445,"correct":22},"压路机",{"key":31,"text":447,"correct":22},"沥青混合料种类",{"key":34,"text":449,"correct":29},"下卧层表面温度",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":394,"analysis":37},1149453,"沥青混合料面层复压可采用()压路机。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"重型轮胎",{"key":24,"text":457,"correct":22},"振动",{"key":27,"text":459,"correct":29},"牵引式",{"key":31,"text":461,"correct":22},"钢筒式",{"key":34,"text":463,"correct":29},"捣实式",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":309,"analysis":37},1149454,"对沥青混凝土路面接缝的施工要求，下列说法正确的有()。",[468,470,472,474,476],{"key":20,"text":469,"correct":29},"上下层的纵缝应错开100mm",{"key":24,"text":471,"correct":22},"相邻两幅的横向接缝应错位1m以上",{"key":27,"text":473,"correct":22},"高等级道路的表面层横向接缝应采用垂直的平接缝",{"key":31,"text":475,"correct":29},"采用梯队作业摊铺时应选用冷接缝",{"key":34,"text":477,"correct":22},"铺筑新混合料接头应使接槎软化",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":141,"analysis":37},1149455,"改性沥青混合料的摊铺在满足普通沥青混合料摊铺要求外，还应做到()。",[482,484,486,488,490],{"key":20,"text":483,"correct":22},"摊铺速度宜放慢",{"key":24,"text":485,"correct":22},"铺筑路面上面层宜采用非接触式平衡梁自动找平",{"key":27,"text":487,"correct":29},"摊铺系数应通过试验段取得，一般为1.15～1.35",{"key":31,"text":489,"correct":22},"在喷洒有粘层油的路面上铺筑时，宜使用履带式摊铺机",{"key":34,"text":491,"correct":22},"SMA混合料摊铺温度应试验确定，一般不低于160℃",{"id":493,"libraryId":5,"type":15,"typeLabel":16,"stem":494,"options":495,"answer":506,"analysis":37},1149456,"下列关于水泥混凝土路面配合比参数计算取值的选项中，说法正确的是()。",[496,498,500,502,504],{"key":20,"text":497,"correct":29},"水灰比应在满足弯拉强度计算值和耐久性两者要求的水灰比中取大值",{"key":24,"text":499,"correct":22},"水灰比应在满足弯拉强度计算值和耐久性两者要求的水灰比中取小值",{"key":27,"text":501,"correct":29},"最大单位用水量应在按规范经验公式计算得到的计算值和满足工作性要求的最大单位用水量中取大值",{"key":31,"text":503,"correct":22},"最大单位用水量应在按规范经验公式计算得到的计算值和满足工作性要求的最大单位用水量中取小值",{"key":34,"text":505,"correct":29},"单位水泥用量应在根据水灰比计算得到的计算值与满足耐久性要求的最小单位水泥用量中取小值","BD",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":111,"analysis":37},1149457,"采用振动压路机进行改性沥青混合料路面压实作业应遵循()的原则。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"紧跟",{"key":24,"text":514,"correct":22},"慢压",{"key":27,"text":516,"correct":22},"高频",{"key":31,"text":518,"correct":29},"低频",{"key":34,"text":520,"correct":22},"低幅",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":171,"analysis":37},1149458,"改性沥青混合料压实作业除执行普通沥青混合料压实要求外，还应做到()。",[525,527,529,531,533],{"key":20,"text":526,"correct":29},"初压开始温度不低于130℃",{"key":24,"text":528,"correct":22},"初压开始温度不低于150℃",{"key":27,"text":530,"correct":22},"碾压终了的表面温度应不低于90℃—120℃",{"key":31,"text":532,"correct":22},"宜采用振动压路机或钢筒式压路机碾压",{"key":34,"text":534,"correct":29},"宜优先采用重型轮胎压路机进行碾压",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":111,"analysis":37},1149459,"设计水泥混凝土路面配合比时，应满足()的要求。",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"经济性",{"key":24,"text":542,"correct":22},"弯拉强度",{"key":27,"text":544,"correct":22},"工作性",{"key":31,"text":546,"correct":29},"合理性",{"key":34,"text":548,"correct":22},"耐久性",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":141,"analysis":37},1149460,"水泥混凝土路面施工时模板支搭应达到()等要求。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"稳固",{"key":24,"text":556,"correct":22},"顺直",{"key":27,"text":558,"correct":29},"模板错台小于10mm",{"key":31,"text":560,"correct":22},"平整无扭曲",{"key":34,"text":562,"correct":22},"无错位",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":309,"analysis":37},1149461,"以下关于采用微表处工艺进行城镇道路大修养护的适用条件正确的是()。",[567,569,571,573,575],{"key":20,"text":568,"correct":29},"原路面弯沉试验结果符合设计要求",{"key":24,"text":570,"correct":22},"原路面结构能满足使用要求",{"key":27,"text":572,"correct":22},"原路面的强度满足要求",{"key":31,"text":574,"correct":29},"原路面有明显的损坏，但强度能达到设计要求",{"key":34,"text":576,"correct":22},"原路面基本无损坏",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":52,"analysis":37},1149462,"旧混凝土路面作为基层加铺沥青混合料面层施工时，若原水泥混凝土路面板局部脱空，加铺前需对基底进行处理，以保证水泥混凝土路面板的整体刚性。常用基底处理方法有()等。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"换填基底材料",{"key":24,"text":584,"correct":29},"填充密封膏",{"key":27,"text":586,"correct":29},"局部修补",{"key":31,"text":588,"correct":22},"注浆填充脱空部位的空洞",{"key":34,"text":590,"correct":29},"采用微表处工艺",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":605,"analysis":37},1149463,"下列属于加铺沥青面层水平变形反射裂缝预防措施的是（）。",[595,597,599,601,603],{"key":20,"text":596,"correct":29},"使用沥青密封膏处理旧面层水平变形反射裂缝",{"key":24,"text":598,"correct":22},"在沥青混凝土加铺层与旧水泥混凝土路面之间设置应力消减层",{"key":27,"text":600,"correct":22},"采取土工织物处理技术措施",{"key":31,"text":602,"correct":29},"将板体整块凿除重新浇筑，采用局部修补的方法",{"key":34,"text":604,"correct":29},"对脱空和路面板局部破裂处的基底进行处理，并对破损的路面板进行修复","BC",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":620,"analysis":37},1149464,"旧水泥混凝土路作为基层加铺沥青混合料面层施工时，应采取措施预防水平变形反射裂缝发生，以下措施正确的是()。",[610,612,614,616,618],{"key":20,"text":611,"correct":22},"处理好原水泥混凝土路面层的胀缝、缩缝、裂缝",{"key":24,"text":613,"correct":22},"加铺层与原水泥混凝土路面之间设置应力消减层",{"key":27,"text":615,"correct":22},"在原水泥混凝土路面上铺设土工合成材料",{"key":31,"text":617,"correct":29},"直接加铺沥青混凝土",{"key":34,"text":619,"correct":29},"在原水泥混凝土路面上撒布透层油","ABC",{"id":622,"libraryId":5,"type":15,"typeLabel":16,"stem":623,"options":624,"answer":620,"analysis":37},1149465,"以下选项中属于梁式桥特点的有()。",[625,627,629,631,633],{"key":20,"text":626,"correct":22},"是在竖向荷载作用下无水平反力的结构",{"key":24,"text":628,"correct":22},"与同样跨径的其他结构体系相比，梁内产生的弯矩最大",{"key":27,"text":630,"correct":22},"需用抗弯能力强的材料来建造",{"key":31,"text":632,"correct":29},"结构自重较轻，构造简单",{"key":34,"text":634,"correct":29},"能经济合理地修建大跨度桥",{"id":636,"libraryId":5,"type":15,"typeLabel":16,"stem":637,"options":638,"answer":97,"analysis":37},1149466,"模板、支架和拱架的设计中应根据()等因素设置施工预拱度。",[639,641,643,645,647],{"key":20,"text":640,"correct":22},"受载后基础的沉降",{"key":24,"text":642,"correct":22},"受载后杆件接头处的非弹性变形",{"key":27,"text":644,"correct":22},"受载后的弹性变形",{"key":31,"text":646,"correct":22},"结构预拱度的设计值",{"key":34,"text":648,"correct":29},"受载后的稳定性",{"id":650,"libraryId":5,"type":15,"typeLabel":16,"stem":651,"options":652,"answer":141,"analysis":37},1149467,"设计预应力混凝土结构模板时，应考虑施加预应力后()等。",[653,655,657,659,661],{"key":20,"text":654,"correct":22},"构件的上拱",{"key":24,"text":656,"correct":22},"支座螺栓位移",{"key":27,"text":658,"correct":29},"构件的非弹性变形",{"key":31,"text":660,"correct":22},"预埋件位移",{"key":34,"text":662,"correct":22},"构件的弹性压缩",{"id":664,"libraryId":5,"type":15,"typeLabel":16,"stem":665,"options":666,"answer":677,"analysis":37},1149468,"计算梁的底模及拱架、支架的强度时，应采用的计算荷载有()等。",[667,669,671,673,675],{"key":20,"text":668,"correct":29},"倾倒混凝土时产生的水平冲击荷载",{"key":24,"text":670,"correct":22},"振捣混凝土时的荷载",{"key":27,"text":672,"correct":22},"施工活荷载",{"key":31,"text":674,"correct":22},"模板、拱架和支架自重",{"key":34,"text":676,"correct":22},"新浇筑混凝土自重","BCDE",{"id":679,"libraryId":5,"type":15,"typeLabel":16,"stem":680,"options":681,"answer":111,"analysis":37},1149469,"钢筋应按不同()及生产厂家分批验收，确认合格后方可使用。",[682,684,686,688,690],{"key":20,"text":683,"correct":22},"牌号",{"key":24,"text":685,"correct":22},"等级",{"key":27,"text":687,"correct":22},"规格",{"key":31,"text":689,"correct":29},"生产工艺",{"key":34,"text":691,"correct":22},"钢种",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":156,"analysis":37},1149470,"在一定条件下热轧钢筋接头可采用绑扎连接，这些条件是()。",[696,698,700,702,704],{"key":20,"text":697,"correct":22},"钢筋直径≤22mm",{"key":24,"text":699,"correct":29},"钢筋直径≤25mm",{"key":27,"text":701,"correct":22},"无焊接条件",{"key":31,"text":703,"correct":29},"受拉主筋",{"key":34,"text":705,"correct":22},"用于普通混凝土中",{"id":707,"libraryId":5,"type":15,"typeLabel":16,"stem":708,"options":709,"answer":82,"analysis":37},1149471,"关于现场绑扎钢筋的说法，正确的有()。",[710,712,714,716,718],{"key":20,"text":711,"correct":22},"钢筋的交叉点应采用绑丝绑牢，必要时可辅以点焊",{"key":24,"text":713,"correct":29},"绑扎接头搭接长度范围内的箍筋间距：当钢筋受拉时应小于10d，且不得大于200mm",{"key":27,"text":715,"correct":29},"矩形柱角部竖向钢筋的弯钩平面与模板面的夹角应为15°",{"key":31,"text":717,"correct":22},"圆形柱所有竖向钢筋弯钩平面应朝向圆心",{"key":34,"text":719,"correct":22},"梁和柱的箍筋，除设计有特殊要求外，应与受力钢筋垂直设置",{"id":721,"libraryId":5,"type":15,"typeLabel":16,"stem":722,"options":723,"answer":97,"analysis":37},1149472,"混凝土配合比的设计步骤包括()。",[724,726,728,730,732],{"key":20,"text":725,"correct":22},"初步配合比设计阶段",{"key":24,"text":727,"correct":22},"试验室配合比设计阶段",{"key":27,"text":729,"correct":22},"基准配合比设计阶段",{"key":31,"text":731,"correct":22},"施工配合比设计阶段",{"key":34,"text":733,"correct":29},"配合比实施使用阶段",[735,739,742,745,748,751],{"id":736,"name":737,"category":7,"favorite":738},1,"领导干部任职前廉政法规知识测试题",92,{"id":740,"name":741,"category":7,"favorite":736},595,"建筑结构与设备",{"id":743,"name":744,"category":7,"favorite":736},715,"招标采购专业知识与法律法规",{"id":746,"name":747,"category":7,"favorite":736},848,"市政方向-通用基础",{"id":749,"name":750,"category":7,"favorite":8},534,"BIM工程师",{"id":752,"name":750,"category":7,"favorite":8},535]