[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,3,50,2019,[13,34,46,58,70,78,90,102,114,126,138,149,161,173,185,197,209,221,233,245,257,269,281,293,305,317,329,341,353,365,377,389,401,413,425,437,449,461,473,485,497,509,521,533,545,557,569,581,593,605],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1148037,1,"单选题","（2010 年真题）现浇混凝土水池的外观和内在质量的设计要求中，没有（ ）要求。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","抗冻",false,{"key":24,"text":25,"correct":26},"B","抗碳化",true,{"key":28,"text":29,"correct":22},"C","抗裂",{"key":31,"text":32,"correct":22},"D","抗渗","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1148038,"（2012 年真题）关于预制安装水池现浇壁板接缝混凝土施工措施的说法，错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"强度较预制壁板应提高一级",{"key":24,"text":41,"correct":22},"宜采用微膨胀混凝土",{"key":28,"text":43,"correct":26},"应在壁板间缝较小时段灌注",{"key":31,"text":45,"correct":22},"应采取必要的养护措施",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1148039,"（2018 年真题）当水质条件为水库水，悬浮物含量小于100mg\u002FL 时，应采用的水处理工艺是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"原水→筛网隔滤或消毒",{"key":24,"text":53,"correct":26},"原水→接触过滤→消毒",{"key":28,"text":55,"correct":22},"原水→混凝、沉淀或澄清→过滤→消毒",{"key":31,"text":57,"correct":22},"原水→调蓄预沉→混凝、沉淀戓澄清→过滤→消毒",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1148040,"（2010 年真题）一般地表水处理厂采用的常规处理流程为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"原水-沉淀-混凝-过滤-消毒",{"key":24,"text":65,"correct":26},"原水-混凝-沉淀-过滤-消毒",{"key":28,"text":67,"correct":22},"原水-过滤-混凝-沉淀-消毒",{"key":31,"text":69,"correct":22},"原水-混凝-消毒-过滤-沉淀",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},1148041,"（2011 年真题）曲面异面的构筑物（ ）。 A.矩形水池 B.圆柱形消化池 C.卵形消化池D 圆形蓄水池",[74,75,76,77],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":22},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":20,"analysis":33},1148042,"（2011 年真题）水质较好处理过程是（ ）。",[82,84,86,88],{"key":20,"text":83,"correct":26},"原水-筛网过滤或消毒",{"key":24,"text":85,"correct":22},"原水-沉淀-过滤",{"key":28,"text":87,"correct":22},"原水-接触过滤-消毒",{"key":31,"text":89,"correct":22},"原水-调蓄预沉-澄清",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":24,"analysis":33},1148043,"（2012 年真题）在渗水量不大、稳定的黏土层中，深5m，直径2m，的圆形沉井宜采用（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":22},"水力机械排水下沉",{"key":24,"text":97,"correct":26},"人工挖土排水下沉",{"key":28,"text":99,"correct":22},"水力机械不排水下沉",{"key":31,"text":101,"correct":22},"人工挖土不排水下沉",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":20,"analysis":33},1148044,"（2017 年真题）给水与污水处理厂试运行内容不包括（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":26},"性能标定",{"key":24,"text":109,"correct":22},"单机试车",{"key":28,"text":111,"correct":22},"联机运行",{"key":31,"text":113,"correct":22},"空载运行",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":31,"analysis":33},1148045,"（2018 年真题）下列场站构筑物组成中，属于污水构筑物的是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"吸水井",{"key":24,"text":121,"correct":22},"污泥脱水机房",{"key":28,"text":123,"correct":22},"管廊桥架",{"key":31,"text":125,"correct":26},"进水泵房",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},1148046,"（2014 年真题）属于给水处理构筑物的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"消化池",{"key":24,"text":133,"correct":22},"曝气池",{"key":28,"text":135,"correct":22},"氧化沟",{"key":31,"text":137,"correct":26},"混凝沉淀池",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":31,"analysis":33},1148047,"（2013 年真题）下列构筑物中，属于污水处理构筑物的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"混凝土沉淀池",{"key":24,"text":145,"correct":22},"清水池",{"key":28,"text":147,"correct":22},"吸滤池",{"key":31,"text":133,"correct":26},{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},1148048,"（2020年真题）关于沉井施工技术的说法，正确的是（）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"在粉细砂土层采用不排水下沉时，井内水位应高出井外水位0.5m",{"key":24,"text":156,"correct":26},"沉井下沉时，需对沉井的标高、轴线位移进行测量",{"key":28,"text":158,"correct":22},"大型沉井应进行结构内力监测及裂缝观测",{"key":31,"text":160,"correct":22},"水下封底混凝土强度达到设计强度等级的75%时，可将井内水抽除",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":28,"analysis":33},1148049,"（2020年真题）关于水处理构筑物特点的说法中，错误的是（）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"薄板结构",{"key":24,"text":168,"correct":22},"抗渗性好",{"key":28,"text":170,"correct":26},"抗地层变位性好",{"key":31,"text":172,"correct":22},"配筋率高",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":31,"analysis":33},1148050,"（2010 年真题）某贮水池设计水深6m，满水试验时，池内注满水所需最短时间为（ ）d。",[177,179,181,183],{"key":20,"text":178,"correct":22},"3.5",{"key":24,"text":180,"correct":22},"4.0",{"key":28,"text":182,"correct":22},"4.5",{"key":31,"text":184,"correct":26},"5.0",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":31,"analysis":33},1148051,"（2018 年真题）关于沉井不排水下沉水下封底技术要求的说法正确的是（ ）。",[189,191,193,195],{"key":20,"text":190,"correct":22},"保持地下位距坑底不小于1m",{"key":24,"text":192,"correct":22},"导管埋入混凝土的深度不宜小于0.5m",{"key":28,"text":194,"correct":22},"封底前应设置泄水井",{"key":31,"text":196,"correct":26},"混凝土浇筑顺序应从低处开始，逐渐向周围扩大",{"id":198,"libraryId":5,"type":15,"typeLabel":16,"stem":199,"options":200,"answer":28,"analysis":33},1148052,"（2019 年真题）关于沉井施工分节制作工艺的说法，正确的是（ ）。",[201,203,205,207],{"key":20,"text":202,"correct":22},"第一节制作高度必须与刃脚部分齐平",{"key":24,"text":204,"correct":22},"设计无要求时，混凝土强度应达到设计强度等级60%，方可拆除模板",{"key":28,"text":206,"correct":26},"混凝土施工缝应采用凹凸缝并应凿毛清理干净",{"key":31,"text":208,"correct":22},"设计要求分多节制作的沉井，必须全部接高后方可下沉",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":20,"analysis":33},1148053,"（2016 年真题）沉井下沉过程中，不可用于减少摩阻力的措施是（ ）。",[213,215,217,219],{"key":20,"text":214,"correct":26},"排水下城",{"key":24,"text":216,"correct":22},"空气幕助沉",{"key":28,"text":218,"correct":22},"在井外壁与土体间灌入黄沙",{"key":31,"text":220,"correct":22},"触变泥浆套",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":24,"analysis":33},1148054,"（2014 年真题关于沉井下沉监控测量的说法，错误的是（ ）。",[225,227,229,231],{"key":20,"text":226,"correct":22},"下沉时标高、轴线位移每班至少测量一次",{"key":24,"text":228,"correct":26},"封底前自沉速率应大于10mm\u002F8h",{"key":28,"text":230,"correct":22},"如发生异常情况应加密量测",{"key":31,"text":232,"correct":22},"大型沉井应进行结构变形和裂缝观测",{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":20,"analysis":33},1148055,"（2010 年真题）下列现浇钢筋混凝土水池伸缩缝橡胶止水带固定方法中，正确的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":26},"设架立钢筋",{"key":24,"text":240,"correct":22},"穿孔后用铁丝绑扎",{"key":28,"text":242,"correct":22},"螺栓对拉",{"key":31,"text":244,"correct":22},"用AB 胶粘结。",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":28,"analysis":33},1148056,"（2018 年真题）关于装配式预应力混凝土水池预制构件安装的说法，正确的是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"曲梁应在跨中临时支撑，待上部混凝土达到设计强度的50%，方可拆除支撑",{"key":24,"text":252,"correct":22},"吊绳与预制构件平面的交角不小于35°",{"key":28,"text":254,"correct":26},"预制曲梁宜采用三点吊装",{"key":31,"text":256,"correct":22},"安装的构件在轴线位置校正后焊接",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":31,"analysis":33},1148057,"（2018 年真题 广东海南）在预制构件吊装方案编制中，吊装程序和方法应写入（ ）中。",[261,263,265,267],{"key":20,"text":262,"correct":22},"工程概况",{"key":24,"text":264,"correct":22},"质量保证措施",{"key":28,"text":266,"correct":22},"安全保证措施",{"key":31,"text":268,"correct":26},"主要技术措施",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":24,"analysis":33},1148058,"（2018 年真题 广东海南）在沉井的构造中，沉井的主要组成部分是（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"刃脚",{"key":24,"text":276,"correct":26},"井筒",{"key":28,"text":278,"correct":22},"横梁",{"key":31,"text":280,"correct":22},"底板",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},1148059,"（2013 年真题）采用排水下沉施工的沉井封底措施中，错误的是（ ）。",[285,287,289,291],{"key":20,"text":286,"correct":22},"封底前设置泄水井",{"key":24,"text":288,"correct":26},"封底前停止降水",{"key":28,"text":290,"correct":22},"封底前，井内应无渗漏水",{"key":31,"text":292,"correct":22},"封底前用石块将刃脚垫实",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":20,"analysis":33},1148060,"（2016 年真题）关于无压管道功能性试验的说法，正确的是（ ）。",[297,299,301,303],{"key":20,"text":298,"correct":26},"当管道内径大于700mm 时，可抽取1\u002F3 井段数量进行试验",{"key":24,"text":300,"correct":22},"污水管段长度300mm 时，可不作试验",{"key":28,"text":302,"correct":22},"可采用水压试验",{"key":31,"text":304,"correct":22},"试验期间渗水量的观测时间不得小于20 分钟",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":24,"analysis":33},1148061,"（2019 年真题）关于沟槽开挖的说法，正确的是（ ）。",[309,311,313,315],{"key":20,"text":310,"correct":22},"机械开挖时，可以直接挖至槽底高程",{"key":24,"text":312,"correct":26},"槽底土层为杂填土时，应全部挖除",{"key":28,"text":314,"correct":22},"沟槽开挖的坡率与沟槽的深度无关",{"key":31,"text":316,"correct":22},"无论土质如何，槽壁必须垂直平顺",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":24,"analysis":33},1148062,"（2011 年真题）管道施工中速度快、成本低、不开槽的施工方法是（ ）。",[321,323,325,327],{"key":20,"text":322,"correct":22},"浅埋暗挖法",{"key":24,"text":324,"correct":26},"夯管法",{"key":28,"text":326,"correct":22},"定向钻施工",{"key":31,"text":328,"correct":22},"盾构",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},1148063,"（2010 年真题）关于排水管道闭水试验的条件中，错误的是（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":22},"管道及检查井外观质量已验收合格",{"key":24,"text":336,"correct":26},"管道与检查井接口处已回填",{"key":28,"text":338,"correct":22},"全部预留口已封堵，不渗漏",{"key":31,"text":340,"correct":22},"管道两端堵板密封且承载附加税满足要求",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":28,"analysis":33},1148064,"（2018 年真题）关于沟槽开挖与支护相关规定的说法，正确的是（ ）。",[345,347,349,351],{"key":20,"text":346,"correct":22},"机械开挖可一次挖至设计高程",{"key":24,"text":348,"correct":22},"每次人工开挖槽沟的深度可达3m",{"key":28,"text":350,"correct":26},"槽底土层为腐蚀性土时，应按设计要求进行换填",{"key":31,"text":352,"correct":22},"槽底被水浸泡后，不宜采用石灰土回填",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},1148065,"（2018 年真题 广东海南）给水管道水压试验时，向管道内注水浸泡的时间，正确的是（ ）。",[357,359,361,363],{"key":20,"text":358,"correct":22},"有水泥砂浆衬里的球墨铸铁管不少于12h",{"key":24,"text":360,"correct":26},"有水泥砂浆衬里的钢管不少于24h",{"key":28,"text":362,"correct":22},"内径不大于1000mm 的自应力混凝土管不少于36h",{"key":31,"text":364,"correct":22},"内径大于1000mm 的自应力混凝土管不少于48h",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},1148066,"（2013 年真题）不属于排水管道圈形检查井的砌筑做法是（ ）。",[369,371,373,375],{"key":20,"text":370,"correct":22},"砌块应垂直砌筑",{"key":24,"text":372,"correct":22},"砌筑砌块时应同时安装踏步",{"key":28,"text":374,"correct":22},"检查井内的流槽宜与井壁同时进行砌筑",{"key":31,"text":376,"correct":26},"采用退茬法砌筑时每块砌块退半块留茬",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},1148067,"（2014 年真题）施工精度高，适用各种土层的不开槽管道施工方法是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"夯管",{"key":24,"text":384,"correct":22},"定向钻",{"key":28,"text":386,"correct":22},"浅埋暗挖",{"key":31,"text":388,"correct":26},"密闭式顶管",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":20,"analysis":33},1148068,"（2014 年真题）用于城市地下管道全断面修复的方法是（ ）。",[393,395,397,399],{"key":20,"text":394,"correct":26},"内衬法",{"key":24,"text":396,"correct":22},"补丁法",{"key":28,"text":398,"correct":22},"密封法",{"key":31,"text":400,"correct":22},"灌浆法",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":24,"analysis":33},1148069,"（2020年真题）下列关于给水排水构筑物施工的说法，正确的是（）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"砌体的沉降缝应与基础沉降缝贯通，变形缝应错开",{"key":24,"text":408,"correct":26},"砖砌拱圈应自两侧向拱中心进行，反拱砌筑顺序反之",{"key":28,"text":410,"correct":22},"检查井砌筑完成后再安装踏步",{"key":31,"text":412,"correct":22},"预制拼装构筑物施工速度快、造价低，应推广使用",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":31,"analysis":33},1148070,"（2017 年真题）某供热管网设计压力为0.4MPa，其严密性试验压力为（ ）MPa。",[417,419,421,423],{"key":20,"text":418,"correct":22},"0.42",{"key":24,"text":420,"correct":22},"0.46",{"key":28,"text":422,"correct":22},"0.50",{"key":31,"text":424,"correct":26},"0.60",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},1148071,"（2013 年真题补偿器芯管的外露长度或其端部与套管内挡圈的距离应大于设计要求的变形量，属于（ ）补偿器的安装要求之一。",[429,431,433,435],{"key":20,"text":430,"correct":22},"波形",{"key":24,"text":432,"correct":22},"球形",{"key":28,"text":434,"correct":22},"Z 形",{"key":31,"text":436,"correct":26},"填料式",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":28,"analysis":33},1148072,"（2015 年真题）在供热管网补偿器的两侧应设置（ ）支架。",[441,443,445,447],{"key":20,"text":442,"correct":22},"滑动",{"key":24,"text":444,"correct":22},"滚动",{"key":28,"text":446,"correct":26},"导向",{"key":31,"text":448,"correct":22},"滚珠",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":31,"analysis":33},1148073,"（2018 年真题 广东海南）关于供热管道工程试运行的说法，正确的是（ ）。",[453,455,457,459],{"key":20,"text":454,"correct":22},"试运行完成后方可进行单位工程验收",{"key":24,"text":456,"correct":22},"试运行连续运行时间为48h",{"key":28,"text":458,"correct":22},"管道自由端应进行临时加固",{"key":31,"text":460,"correct":26},"试运行过程中应重点检查支架的工作状况",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":24,"analysis":33},1148074,"（2018 年真题）关于供热站内管道和设备严密性试验的实施要点的说法，正确的是（ ）。",[465,467,469,471],{"key":20,"text":466,"correct":22},"仪表组件应全部参与试验",{"key":24,"text":468,"correct":26},"仪表组件可采取加盲板方法进行隔离",{"key":28,"text":470,"correct":22},"安全阀应全部参与试验",{"key":31,"text":472,"correct":22},"闸阀应全部釆取加盲板方法进行隔离",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":24,"analysis":33},1148075,"（2015 年真题）地上敷设的供热管道与电气化铁路交叉时，管道的金属部分应（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"绝缘",{"key":24,"text":480,"correct":26},"接地",{"key":28,"text":482,"correct":22},"消磁",{"key":31,"text":484,"correct":22},"热处理",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":20,"analysis":33},1148076,"（2016 年真题）供热管道施工前的准备工作中，履行相关的审批手续属于（ ）准备。",[489,491,493,495],{"key":20,"text":490,"correct":26},"技术",{"key":24,"text":492,"correct":22},"设计",{"key":28,"text":494,"correct":22},"物质",{"key":31,"text":496,"correct":22},"现场",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":24,"analysis":33},1148077,"（2010 年真题）下列供热管道的补偿器中，属于自然补偿方式的是（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"波形补偿器",{"key":24,"text":504,"correct":26},"Z 型补偿器",{"key":28,"text":506,"correct":22},"方形补偿器",{"key":31,"text":508,"correct":22},"填充式补偿器",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},1148078,"（2018 年真题）关于供热管道固定支架安装的说法，正确的是（ ）。",[513,515,517,519],{"key":20,"text":514,"correct":22},"固定支架必严格按照设计位置，并结合管道温差变形量进行安装",{"key":24,"text":516,"correct":22},"固定支架应与固定角板进行点焊固定",{"key":28,"text":518,"correct":26},"固定支架应与土建结构结合牢固",{"key":31,"text":520,"correct":22},"固定支架的混凝土浇筑完成后，即可与管道进行固定",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},1148079,"（2013 年真题）对供热水利系统管网的阻力和压差等加以调节和控制，以满足管网系统按规定要求正常和高效运行的阀门是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"安全阀",{"key":24,"text":528,"correct":22},"减压阀",{"key":28,"text":530,"correct":26},"平衡阀",{"key":31,"text":532,"correct":22},"疏水阀",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":24,"analysis":33},1148080,"（2014 年真题）供热管道安装补偿器的目的是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"保护固定支架",{"key":24,"text":540,"correct":26},"消除温度应力",{"key":28,"text":542,"correct":22},"方便管道焊接",{"key":31,"text":544,"correct":22},"利于设备更换",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},1148081,"（2014 年真题）热动力疏水阀应安装在（ ）管道上。",[549,551,553,555],{"key":20,"text":550,"correct":22},"热水",{"key":24,"text":552,"correct":22},"排潮",{"key":28,"text":554,"correct":26},"蒸汽",{"key":31,"text":556,"correct":22},"凝结水",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":20,"analysis":33},1148082,"（2020年真题）金属供热管道安装时，焊缝可设置于（）。",[561,563,565,567],{"key":20,"text":562,"correct":26},"管道与阀门连接处",{"key":24,"text":564,"correct":22},"管道支架处",{"key":28,"text":566,"correct":22},"保护套管中",{"key":31,"text":568,"correct":22},"穿过构筑物结构处",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":20,"analysis":33},1148083,"（2015 年真题）随桥敷设燃气管道的输送压力不应大于（ ）。",[573,575,577,579],{"key":20,"text":574,"correct":26},"0.4MPa",{"key":24,"text":576,"correct":22},"0.6MPa",{"key":28,"text":578,"correct":22},"0.8MPa",{"key":31,"text":580,"correct":22},"1.0MPa",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":24,"analysis":33},1148084,"（2016 年真题）大城市输配管网系统外环网的燃气管道压力一般为（ ）。",[585,587,589,591],{"key":20,"text":586,"correct":22},"高压A",{"key":24,"text":588,"correct":26},"高压B",{"key":28,"text":590,"correct":22},"中压A",{"key":31,"text":592,"correct":22},"中压B",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":28,"analysis":33},1148085,"（2017 年真题）下列燃气和热水管网附属设备中，属于燃气管网独有的是（ ）。",[597,599,601,603],{"key":20,"text":598,"correct":22},"阀门",{"key":24,"text":600,"correct":22},"补偿装置",{"key":28,"text":602,"correct":26},"凝水缸",{"key":31,"text":604,"correct":22},"排气装置",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":28,"analysis":33},1148086,"（2014 年真题）穿越铁路的燃气管道应在套管上装设（ ）。",[609,611,613,615],{"key":20,"text":610,"correct":22},"放散管",{"key":24,"text":612,"correct":22},"排气管",{"key":28,"text":614,"correct":26},"检漏管",{"key":31,"text":616,"correct":22},"排污管",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]