[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-29":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":730},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,29,50,2019,[13,38,53,68,83,98,113,128,143,157,171,186,200,215,229,244,258,273,287,302,317,331,345,360,374,388,402,417,431,445,459,473,488,499,511,525,539,553,567,581,595,610,625,639,651,665,677,691,702,716],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149363,2,"多选题","大型箱涵线路加固的方法有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","调轨梁",false,{"key":24,"text":25,"correct":22},"B","轨束梁",{"key":27,"text":28,"correct":29},"C","横梁加盖",true,{"key":31,"text":32,"correct":29},"D","纵横梁加固",{"key":34,"text":35,"correct":29},"E","钢板脱壳法","CDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149364,"下面关于工程档案资料编制要求正确的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"图纸宜采用国家标准图幅",{"key":24,"text":45,"correct":29},"图纸一般采用蓝晒图，竣工图应为新蓝图",{"key":27,"text":47,"correct":22},"计算机出图必须清晰，宜使用计算机出图的复印件",{"key":31,"text":49,"correct":29},"凡施工图结构、工艺、平面布置等有重大改变，或变更部分超过图面1\u002F3的，应当重新绘制竣工图",{"key":34,"text":51,"correct":22},"竣工图首页可不加盖竣工图章","ABD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149366,"给水管道内防腐层施工方法有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"机械喷涂",{"key":24,"text":60,"correct":22},"人工刷浆",{"key":27,"text":62,"correct":29},"人工抹压",{"key":31,"text":64,"correct":29},"拖筒",{"key":34,"text":66,"correct":29},"离心预制法","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1149367,"热力管道直埋保温接头保温和密封规定正确的是（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"保温工艺应有合格的检验报告",{"key":24,"text":75,"correct":29},"接头钢管表面应干净、干燥",{"key":27,"text":77,"correct":29},"发泡后应及时密封发泡孔",{"key":31,"text":79,"correct":22},"接头外观可出现少量层间脱离现象",{"key":34,"text":81,"correct":22},"接头外护层安全完成后，必须进行50%的气密性检验并应合格","ABC",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1149369,"危险性较大工程中的工具式模板工程包括（ ）项目。",[87,89,91,93,95],{"key":20,"text":88,"correct":29},"滑动模板",{"key":24,"text":90,"correct":22},"大块钢模板",{"key":27,"text":92,"correct":29},"飞模工程",{"key":31,"text":94,"correct":22},"水平构件模板支撑",{"key":34,"text":96,"correct":29},"爬模","ACE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1149370,"下列选项中属于施工方案主要内容的有（ ）。",[102,104,106,108,110],{"key":20,"text":103,"correct":29},"施工机械",{"key":24,"text":105,"correct":29},"施工组织",{"key":27,"text":107,"correct":22},"作业指导书",{"key":31,"text":109,"correct":22},"网络技术",{"key":34,"text":111,"correct":29},"施工顺序","ABE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},1149373,"（ ）应当建立危大工程安全管理档案。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"建设单位",{"key":24,"text":120,"correct":22},"勘察单位",{"key":27,"text":122,"correct":29},"施工单位",{"key":31,"text":124,"correct":29},"监理单位",{"key":34,"text":126,"correct":22},"监测单位","CD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":142,"analysis":37},1149374,"钻孔灌注桩施工时，钻孔塌孔或缩径的主要原因有（ ）等。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"钻进速度过慢",{"key":24,"text":135,"correct":29},"护壁泥浆性能差",{"key":27,"text":137,"correct":22},"钻孔偏斜",{"key":31,"text":139,"correct":29},"成孔后没及时灌注混凝土",{"key":34,"text":141,"correct":29},"地层复杂","BDE",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":82,"analysis":37},1149376,"顶管作业质量控制表述正确的是（ ）。",[147,149,151,153,155],{"key":20,"text":148,"correct":29},"应遵循“勤测量、勤纠偏、微纠偏”的原则",{"key":24,"text":150,"correct":29},"进入接收工作井应提前进行顶管机位置和姿态测量",{"key":27,"text":152,"correct":29},"为防止管节飘移，宜将前3～5节管节与顶管机联成一体",{"key":31,"text":154,"correct":22},"采用敞口式顶管机，在允许超挖的地层正常顶进时，管下部135度范围内可以超挖15mm",{"key":34,"text":156,"correct":22},"钢管接口焊接完成后，进行防腐层补口施工后即可顶进",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":52,"analysis":37},1149377,"刀盘式顶管机纠偏时，可采用（ ）措施。",[161,163,165,167,169],{"key":20,"text":162,"correct":29},"调整挖土方法",{"key":24,"text":164,"correct":29},"改变切削刀盘的转动方向",{"key":27,"text":166,"correct":22},"一侧超挖法",{"key":31,"text":168,"correct":29},"反向增加配重",{"key":34,"text":170,"correct":22},"木杠法",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":185,"analysis":37},1149378,"钢管严禁采用（ ）方法强行对口焊接。",[175,177,179,181,183],{"key":20,"text":176,"correct":29},"在焊口两侧加热延伸管道长度",{"key":24,"text":178,"correct":29},"螺栓强力拉紧",{"key":27,"text":180,"correct":29},"夹焊金属填充物",{"key":31,"text":182,"correct":22},"采取气体保护焊",{"key":34,"text":184,"correct":29},"使补偿器变形","ABCE",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":82,"analysis":37},1149379,"投标文件中（ ）如未填写，将作为废标文件处理。",[190,192,194,196,198],{"key":20,"text":191,"correct":29},"质量等级",{"key":24,"text":193,"correct":29},"工程总价",{"key":27,"text":195,"correct":29},"工期",{"key":31,"text":197,"correct":22},"施工措施",{"key":34,"text":199,"correct":22},"安全保证计划",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1149380,"当施工现场作业人员发生法定传染病、食物中毒、急性职业中毒时，必须在2h内向事故所在地的（ ）报告。",[204,206,208,210,212],{"key":20,"text":205,"correct":29},"建设行政主管部门",{"key":24,"text":207,"correct":22},"劳动保障部门",{"key":27,"text":209,"correct":22},"工会",{"key":31,"text":211,"correct":29},"卫生防疫部门",{"key":34,"text":213,"correct":22},"检察院","AD",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":52,"analysis":37},1149383,"劳务实名制管理手段主要有（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":29},"手工台账",{"key":24,"text":222,"correct":29},"电子EXCEL表",{"key":27,"text":224,"correct":22},"劳动合同",{"key":31,"text":226,"correct":29},"IC卡",{"key":34,"text":228,"correct":22},"人员花名册",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":243,"analysis":37},1149384,"劳务IC卡可实现（ ）功能。",[233,235,237,239,241],{"key":20,"text":234,"correct":29},"人员信息管理",{"key":24,"text":236,"correct":29},"工资管理",{"key":27,"text":238,"correct":22},"分包管理",{"key":31,"text":240,"correct":29},"考勤管理",{"key":34,"text":242,"correct":29},"门禁管理","ABDE",{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":52,"analysis":37},1149385,"水泥混凝土路面冬期施工正确的是（ ）。",[248,250,252,254,256],{"key":20,"text":249,"correct":29},"搅拌站应搭工棚",{"key":24,"text":251,"correct":29},"砼拌合料温度应不高于35℃",{"key":27,"text":253,"correct":22},"可加防冻剂、缓凝剂",{"key":31,"text":255,"correct":29},"基层无冰冻，不积冰雪",{"key":34,"text":257,"correct":22},"搅拌时间适当缩短",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},1149387,"钢管拱砼浇筑施工质量控制正确的是（ ）。",[262,264,266,268,270],{"key":20,"text":263,"correct":29},"砼泵送顺序宜先钢管后腹箱",{"key":24,"text":265,"correct":22},"质量检测以人工敲击为主，超声波为辅",{"key":27,"text":267,"correct":29},"应先泵入适量水泥浆再压注砼",{"key":31,"text":269,"correct":29},"压注砼完成后应关闭倒流截止阀",{"key":34,"text":271,"correct":22},"由一侧拱脚向拱顶连续压注完成后再压注另一侧","ACD",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":36,"analysis":37},1149389,"隧道喷锚防水施工质量控制中，下列表述正确的有（ ）。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"应在初期支护完全稳定，且衬砌检查合格后进行",{"key":24,"text":280,"correct":22},"清理混凝土表面，剔除尖、突部位并用混凝土压实、找平",{"key":27,"text":282,"correct":29},"衬垫材料应直顺，用垫圈固定，钉牢在基面上",{"key":31,"text":284,"correct":29},"固定衬垫的垫圈，应与防水卷材同材质，并焊接牢固",{"key":34,"text":286,"correct":29},"采用专用热合机焊接，焊缝应均匀连续",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":301,"analysis":37},1149390,"关于钢管法兰连接的叙述，正确的是（ ）。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"当两法兰不平行且超过规定要求时必须进行调整，可以使用多个垫片予以校正",{"key":24,"text":294,"correct":29},"法兰在与管道焊接连接时，应按标准规定双侧焊接",{"key":27,"text":296,"correct":29},"密封材料的选择应与工作介质相适应",{"key":31,"text":298,"correct":29},"选择与设备或阀件相连接的法兰时，应按不低于设备或阀件标称压力的原则选用",{"key":34,"text":300,"correct":29},"法兰与管道组装时，应用法兰弯尺检查法兰的垂直度","BCDE",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":316,"analysis":37},1149391,"现场常用的钢管基层处理方法主要是（ ）。",[306,308,310,312,314],{"key":20,"text":307,"correct":29},"喷射除锈",{"key":24,"text":309,"correct":29},"工具除锈",{"key":27,"text":311,"correct":22},"生物除锈",{"key":31,"text":313,"correct":22},"化学除锈",{"key":34,"text":315,"correct":22},"火焰除锈","AB",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":272,"analysis":37},1149392,"浅埋暗挖法施工综合管廊时，根据围岩及周边环境条件，优先选用（ ）。",[321,323,325,327,329],{"key":20,"text":322,"correct":29},"单侧壁导洞法",{"key":24,"text":324,"correct":22},"多台阶法",{"key":27,"text":326,"correct":29},"双侧壁导洞法",{"key":31,"text":328,"correct":29},"预留核心土法",{"key":34,"text":330,"correct":22},"全断面法",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":301,"analysis":37},1149393,"定向钻施工质量控制要点正确的有（ ）。",[335,337,339,341,343],{"key":20,"text":336,"correct":22},"第一根钻杆入土钻进时，应采取轻压快转方式",{"key":24,"text":338,"correct":29},"每钻进一根钻杆应进行钻进距离、深度、侧向位移等的导向探测",{"key":27,"text":340,"correct":29},"发生偏差及时纠正，采用小角度纠偏",{"key":31,"text":342,"correct":29},"钻孔轨迹偏差不得大于终孔直径",{"key":34,"text":344,"correct":29},"回拖过程应有发送装置",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":359,"analysis":37},1149395,"下列属于项目部安全检查形式的是（ ）。",[349,351,353,355,357],{"key":20,"text":350,"correct":22},"自检",{"key":24,"text":352,"correct":22},"互检",{"key":27,"text":354,"correct":29},"定期检查",{"key":31,"text":356,"correct":22},"交接检",{"key":34,"text":358,"correct":29},"日常性检查","CE",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":82,"analysis":37},1149396,"以下分部分项工程，需要编制专项方案并进行专家论证的是（ ）。",[364,366,368,370,372],{"key":20,"text":365,"correct":29},"5m 的基坑工程",{"key":24,"text":367,"correct":29},"斜拉桥索塔施工使用的模板",{"key":27,"text":369,"correct":29},"搭设高度8m 的混凝土模板",{"key":31,"text":371,"correct":22},"采用非常规起重设备、方法，且单件起吊重量80kN",{"key":34,"text":373,"correct":22},"开挖深度15m 的人工挖孔桩",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":185,"analysis":37},1149397,"城镇道路的划分以道路在城市道路网中的地位、交通功能为基础，同时也考虑对沿线的服务功能，以下说法正确的是（ ）。",[378,380,382,384,386],{"key":20,"text":379,"correct":29},"快速路完全为交通功能服务",{"key":24,"text":381,"correct":29},"主干路以交通功能为主",{"key":27,"text":383,"correct":29},"次干路是城市区域性的交通干道，兼有服务功能",{"key":31,"text":385,"correct":22},"支路为区域交通集散服务",{"key":34,"text":387,"correct":29},"支路以服务功能为主",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":243,"analysis":37},1149398,"根据《城市道路工程设计规范》CJJ37-2012分类方法，将城镇道路分为（ ）。",[392,394,396,398,400],{"key":20,"text":393,"correct":29},"快速路",{"key":24,"text":395,"correct":29},"次干路",{"key":27,"text":397,"correct":22},"环路",{"key":31,"text":399,"correct":29},"支路",{"key":34,"text":401,"correct":29},"主干路",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":416,"analysis":37},1149399,"改性沥青SMA路面有非常好的（ ），且构造深度大，抗滑性能好，耐老化性能及耐久性等路面性能都有较大提高。",[406,408,410,412,414],{"key":20,"text":407,"correct":22},"粘结性",{"key":24,"text":409,"correct":29},"高温抗车辙能力",{"key":27,"text":411,"correct":29},"低温抗变形性能",{"key":31,"text":413,"correct":22},"安全性",{"key":34,"text":415,"correct":29},"水稳定性","BCE",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":416,"analysis":37},1149400,"下列属于柔性路面的是（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":22},"水泥混凝土路面",{"key":24,"text":424,"correct":29},"沥青混凝土面层",{"key":27,"text":426,"correct":29},"沥青碎石面层",{"key":31,"text":428,"correct":22},"钢筋网的水泥混凝土路面",{"key":34,"text":430,"correct":29},"沥青贯入式碎（砾）石面层",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":82,"analysis":37},1149401,"城镇沥青路面道路结构组成有（ ）。",[435,437,439,441,443],{"key":20,"text":436,"correct":29},"路基",{"key":24,"text":438,"correct":29},"基层",{"key":27,"text":440,"correct":29},"面层",{"key":31,"text":442,"correct":22},"垫层",{"key":34,"text":444,"correct":22},"排水层",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":272,"analysis":37},1149402,"高等级沥青路面层一般由（ ）构成。",[449,451,453,455,457],{"key":20,"text":450,"correct":29},"面层上层",{"key":24,"text":452,"correct":22},"承重层",{"key":27,"text":454,"correct":29},"面层下层",{"key":31,"text":456,"correct":29},"磨耗层",{"key":34,"text":458,"correct":22},"防水层",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":52,"analysis":37},1149403,"（ ）不能用作城镇道路路床填料。因条件限制而必须采用上述土作填料时，应掺加石灰或水泥等结合料进行改善。",[463,465,467,469,471],{"key":20,"text":464,"correct":29},"高液限黏土",{"key":24,"text":466,"correct":29},"高液限粉土",{"key":27,"text":468,"correct":22},"砂土",{"key":31,"text":470,"correct":29},"含有机质细粒土",{"key":34,"text":472,"correct":22},"卵砾石",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":487,"analysis":37},1149404,"对路基性能要求的主要指标有（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":29},"整体稳定性",{"key":24,"text":480,"correct":22},"承载能力",{"key":27,"text":482,"correct":29},"变形量控制",{"key":31,"text":484,"correct":22},"透水性",{"key":34,"text":486,"correct":22},"压实度","AC",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":301,"analysis":37},1149405,"对路面使用要求的主要指标有平整度、（ ）、噪声量。",[492,493,494,496,497],{"key":20,"text":478,"correct":22},{"key":24,"text":480,"correct":29},{"key":27,"text":495,"correct":29},"温度稳定性",{"key":31,"text":484,"correct":29},{"key":34,"text":498,"correct":29},"抗滑能力",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":510,"analysis":37},1149406,"路面的使用要求指标有（ ）。",[503,505,506,507,508],{"key":20,"text":504,"correct":29},"平整度",{"key":24,"text":480,"correct":29},{"key":27,"text":495,"correct":29},{"key":31,"text":484,"correct":29},{"key":34,"text":509,"correct":22},"经济性","ABCD",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":510,"analysis":37},1149407,"面层混凝土通常分为（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":29},"素混凝土",{"key":24,"text":518,"correct":29},"钢筋混凝土",{"key":27,"text":520,"correct":29},"连续配筋混凝土",{"key":31,"text":522,"correct":29},"预应力混凝土",{"key":34,"text":524,"correct":22},"重力混凝土",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":142,"analysis":37},1149408,"经常处于（ ）路段的路基应设垫层。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"高温",{"key":24,"text":532,"correct":29},"产生冰冻危害",{"key":27,"text":534,"correct":22},"干燥",{"key":31,"text":536,"correct":29},"过湿",{"key":34,"text":538,"correct":29},"潮湿",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":510,"analysis":37},1149409,"关于水泥混凝土道路基层的作用，阐述正确的是（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":29},"防止或减轻由于唧泥产生板底脱空和错台等病害",{"key":24,"text":546,"correct":29},"减少路基不均匀冻胀对混凝土层面产生的不利影响",{"key":27,"text":548,"correct":29},"减少路基体积变形对混凝土面层产生的不利影响",{"key":31,"text":550,"correct":29},"改善接缝的传荷能力",{"key":34,"text":552,"correct":22},"调节路基可能产生的不均匀沉降",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":510,"analysis":37},1149410,"水泥混凝土路面应具有（ ）要求。",[557,559,561,563,565],{"key":20,"text":558,"correct":29},"足够的强度",{"key":24,"text":560,"correct":29},"耐久性",{"key":27,"text":562,"correct":29},"表面抗滑",{"key":31,"text":564,"correct":29},"耐磨",{"key":34,"text":566,"correct":22},"表面光滑",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":510,"analysis":37},1149411,"为保证水泥混凝土路面抗滑构造深度，可采用的方法有（ ）",[571,573,575,577,579],{"key":20,"text":572,"correct":29},"刻槽",{"key":24,"text":574,"correct":29},"拉槽",{"key":27,"text":576,"correct":29},"压槽",{"key":31,"text":578,"correct":29},"拉毛",{"key":34,"text":580,"correct":22},"锯缝",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":510,"analysis":37},1149412,"沥青混凝土混合料按最大集料粒径分为（ ）。",[585,587,589,591,593],{"key":20,"text":586,"correct":29},"粗粒式",{"key":24,"text":588,"correct":29},"中粒式",{"key":27,"text":590,"correct":29},"细粒式",{"key":31,"text":592,"correct":29},"砂粒式",{"key":34,"text":594,"correct":22},"特细粒式",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":609,"analysis":37},1149413,"改性沥青混合料是指掺加（ ）或其他填料等外掺剂（改性剂），使沥青或沥青混合料的性能得以改善的沥青混合料。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"矿粉",{"key":24,"text":602,"correct":29},"橡胶",{"key":27,"text":604,"correct":29},"树脂",{"key":31,"text":606,"correct":29},"高分子聚合物",{"key":34,"text":608,"correct":22},"粘结剂","BCD",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":624,"analysis":37},1149414,"再生沥青混合料中旧料含量，如（ ），则旧料含量取低值，占30%—40%",[614,616,618,620,622],{"key":20,"text":615,"correct":29},"直接用于路面面层时",{"key":24,"text":617,"correct":22},"旧路面材料的品质",{"key":27,"text":619,"correct":22},"再生沥青性能",{"key":31,"text":621,"correct":22},"交通量不大时",{"key":34,"text":623,"correct":29},"交通量较大时","AE",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":97,"analysis":37},1149415,"在温度和湿度状况不良的城镇道路上，应设置垫层，以改善路面结构的使用性能。以下关于垫层说法正确的是（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":29},"半刚性垫层宜采用低剂量水泥、石灰等无机结合稳定粒料或土类材料",{"key":24,"text":632,"correct":22},"刚性垫层宜采用低剂量水泥、石灰等无机结合稳定粒料或土类材料",{"key":27,"text":634,"correct":29},"排水垫层宜采用砂、砂砾等颗粒材料",{"key":31,"text":636,"correct":22},"防水垫层宜采用砂、砂砾等颗粒材料",{"key":34,"text":638,"correct":29},"防冻垫层宜采用砂、砂砾等颗粒材料",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":510,"analysis":37},1149416,"城镇道路沥青路面面层对沥青材料的技术性能要求有（ ）。",[643,644,646,647,649],{"key":20,"text":407,"correct":29},{"key":24,"text":645,"correct":29},"感温性",{"key":27,"text":560,"correct":29},{"key":31,"text":648,"correct":29},"塑性",{"key":34,"text":650,"correct":22},"刚性",{"id":652,"libraryId":5,"type":15,"typeLabel":16,"stem":653,"options":654,"answer":510,"analysis":37},1149417,"城镇道路路基工程包括路基本身及有关的土（石）方、()等项目。",[655,657,659,661,663],{"key":20,"text":656,"correct":29},"挡土墙",{"key":24,"text":658,"correct":29},"路肩",{"key":27,"text":660,"correct":29},"排水管",{"key":31,"text":662,"correct":29},"涵洞",{"key":34,"text":664,"correct":22},"沥青透层",{"id":666,"libraryId":5,"type":15,"typeLabel":16,"stem":667,"options":668,"answer":316,"analysis":37},1149418,"城镇道路路基施工质量检验与验收的主控项目有()。",[669,670,672,674,676],{"key":20,"text":486,"correct":29},{"key":24,"text":671,"correct":29},"弯沉值",{"key":27,"text":673,"correct":22},"路基宽度",{"key":31,"text":675,"correct":22},"路基允许偏差",{"key":34,"text":504,"correct":22},{"id":678,"libraryId":5,"type":15,"typeLabel":16,"stem":679,"options":680,"answer":97,"analysis":37},1149419,"路基施工时挖土路基的施工要点包括()。",[681,683,685,687,689],{"key":20,"text":682,"correct":29},"根据测量中线和边桩开挖",{"key":24,"text":684,"correct":22},"压路机不小于8t级，碾压应自路两边向路中心进行",{"key":27,"text":686,"correct":29},"碾压时，应视土的干湿程度而采取洒水或换土、晾晒等措施",{"key":31,"text":688,"correct":22},"压路机不小于12t级，碾压应自路中心向两边进行",{"key":34,"text":690,"correct":29},"过街雨水支管沟槽及检查井周围应用石灰土或石灰粉煤灰砂砾填实",{"id":692,"libraryId":5,"type":15,"typeLabel":16,"stem":693,"options":694,"answer":487,"analysis":37},1149420,"土质路基检验与验收主控项目有()。",[695,696,697,698,700],{"key":20,"text":671,"correct":29},{"key":24,"text":504,"correct":22},{"key":27,"text":486,"correct":29},{"key":31,"text":699,"correct":22},"拌合均匀性",{"key":34,"text":701,"correct":22},"压实遍数",{"id":703,"libraryId":5,"type":15,"typeLabel":16,"stem":704,"options":705,"answer":243,"analysis":37},1149421,"路基材料不得使用()等。",[706,708,710,712,714],{"key":20,"text":707,"correct":29},"盐渍土",{"key":24,"text":709,"correct":29},"淤泥",{"key":27,"text":711,"correct":22},"建筑垃圾土",{"key":31,"text":713,"correct":29},"生活垃圾土",{"key":34,"text":715,"correct":29},"腐殖土",{"id":717,"libraryId":5,"type":15,"typeLabel":16,"stem":718,"options":719,"answer":185,"analysis":37},1149422,"在正式进行路基压实作业前，有条件时应做试验段，以便取得路基或基层施工相关的技术参数。试验的主要目的是()。",[720,722,724,726,728],{"key":20,"text":721,"correct":29},"确定虚铺厚度",{"key":24,"text":723,"correct":29},"合理选用压实机具",{"key":27,"text":725,"correct":29},"选择压实方式",{"key":31,"text":727,"correct":22},"确定最佳含水量",{"key":34,"text":729,"correct":29},"确定压实遍数",[731,735,738,741,744,747],{"id":732,"name":733,"category":7,"favorite":734},1,"领导干部任职前廉政法规知识测试题",92,{"id":736,"name":737,"category":7,"favorite":732},595,"建筑结构与设备",{"id":739,"name":740,"category":7,"favorite":732},715,"招标采购专业知识与法律法规",{"id":742,"name":743,"category":7,"favorite":732},848,"市政方向-通用基础",{"id":745,"name":746,"category":7,"favorite":8},534,"BIM工程师",{"id":748,"name":746,"category":7,"favorite":8},535]