[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-28":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":729},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,28,50,2019,[13,38,53,68,83,98,113,127,141,156,165,180,194,209,223,237,250,264,279,293,307,321,335,350,365,379,393,407,421,435,450,464,479,493,507,521,535,549,563,577,591,605,619,633,647,661,676,690,704,718],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149310,2,"多选题","地下燃气管道穿过（ ）时，应将燃气管道敷设在套管内。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","排水管",true,{"key":24,"text":25,"correct":22},"B","热力管沟",{"key":27,"text":28,"correct":22},"C","隧道",{"key":30,"text":31,"correct":32},"D","建筑物",false,{"key":34,"text":35,"correct":22},"E","沟槽","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1149311,"关于燃气管道气密性试验压力叙述中正确的有（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"当设计输气压力P＜5kPa时，试验压力为20kPa",{"key":24,"text":45,"correct":22},"当设计输气压力P≥5kPa时，试验压力为设计压力的1.15倍，且不得小于0.1MPa",{"key":27,"text":47,"correct":32},"当设计输气压力P≥5kPa时，试验压力为20kPa",{"key":30,"text":49,"correct":22},"当设计输气压力P≥5kPa时，试验压力不得低于0.1MPa",{"key":34,"text":51,"correct":22},"燃气管道的气密性试验持续时间一般不少于24h","ABDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1149312,"内径小于1000mm的（ ）水压试验前浸泡时间不小于48h。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"现浇钢筋砼管渠",{"key":24,"text":60,"correct":22},"预应力砼管",{"key":27,"text":62,"correct":32},"钢管",{"key":30,"text":64,"correct":22},"预应力钢筒砼管",{"key":34,"text":66,"correct":32},"球墨铸铁管","ABD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},1149313,"关于供热管道支、吊架安装的说法，错误的有（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":32},"管道支架处不应有管道焊缝",{"key":24,"text":75,"correct":32},"活动支架的偏移方向、偏移量及导向性能应符合设计要求",{"key":27,"text":77,"correct":22},"调整支承面标高的垫板不得与钢结构焊接",{"key":30,"text":79,"correct":22},"有角向型补偿器的管段、固定支架不得与管道同时进行安装与固定",{"key":34,"text":81,"correct":22},"弹簧支、吊架的临时固定件应在试压前拆除","CDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},1149314,"雨水源头控制利用技术有（ ）。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"雨水下渗",{"key":24,"text":90,"correct":22},"雨水净化和收集回用",{"key":27,"text":92,"correct":32},"雨水湿地",{"key":30,"text":94,"correct":32},"多功能调蓄",{"key":34,"text":96,"correct":32},"雨水塘","AB",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},1149315,"（ ）管道必须经严密性试验合格后方可投入运行。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"污水",{"key":24,"text":105,"correct":22},"雨污水合流",{"key":27,"text":107,"correct":22},"湿陷土地区雨水管道",{"key":30,"text":109,"correct":22},"流沙地区雨水管道",{"key":34,"text":111,"correct":32},"岩石地区雨水管道","ABCD",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":112,"analysis":37},1149317,"管道局部修补的方法主要有（ ）。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"补丁法",{"key":24,"text":120,"correct":22},"铰接管法",{"key":27,"text":122,"correct":22},"局部软衬法",{"key":30,"text":124,"correct":22},"机器人法",{"key":34,"text":126,"correct":32},"缠绕法",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":36,"analysis":37},1149318,"压力管道试验准备工作的内容有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"试验管段所有敞口应封闭，不得有渗漏水现象",{"key":24,"text":134,"correct":22},"试验前应清除管内杂物",{"key":27,"text":136,"correct":22},"试验段内不得用闸阀做堵板",{"key":30,"text":138,"correct":32},"试验段内消火栓安装完毕",{"key":34,"text":140,"correct":22},"应做好水源引接、排水等疏导方案",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":155,"analysis":37},1149320,"易漏水漏气的热力补偿器有（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":32},"波形补偿器",{"key":24,"text":148,"correct":22},"填料式补偿器",{"key":27,"text":150,"correct":32},"L形补偿器",{"key":30,"text":152,"correct":22},"球形补偿器",{"key":34,"text":154,"correct":32},"方形补偿器","BD",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":155,"analysis":37},1149321,"利用管道位移吸收热伸长的热力补偿器有（ ）。",[160,161,162,163,164],{"key":20,"text":146,"correct":32},{"key":24,"text":148,"correct":22},{"key":27,"text":150,"correct":32},{"key":30,"text":152,"correct":22},{"key":34,"text":154,"correct":32},{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":179,"analysis":37},1149322,"燃气管道阀门中，安装时具有方向性，不得装反的是（ ）。",[169,171,173,175,177],{"key":20,"text":170,"correct":32},"闸阀",{"key":24,"text":172,"correct":22},"截止阀",{"key":27,"text":174,"correct":22},"安全阀",{"key":30,"text":176,"correct":22},"减压阀",{"key":34,"text":178,"correct":22},"止回阀","BCDE",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":36,"analysis":37},1149323,"燃气管道利用道路桥梁跨越河流时，其技术要求正确的有（ ）。",[184,186,188,190,192],{"key":20,"text":185,"correct":22},"燃气管道输送压力不应大于0.4MPa",{"key":24,"text":187,"correct":22},"敷设于桥梁上的燃气管道应采用加厚的无缝钢管或焊接钢管",{"key":27,"text":189,"correct":22},"燃气管道在桥梁上的部分要提高防腐等级",{"key":30,"text":191,"correct":32},"燃气管道输送压力不应大于1MPa，可不做任何处理",{"key":34,"text":193,"correct":22},"燃气管道在桥梁上的部分应设置必要的补偿和减振措施",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":208,"analysis":37},1149324,"下列不开槽施工方法中，具有施工速度快的优点的是（ ）。",[198,200,202,204,206],{"key":20,"text":199,"correct":22},"盾构法",{"key":24,"text":201,"correct":32},"顶管法",{"key":27,"text":203,"correct":32},"浅埋暗挖法",{"key":30,"text":205,"correct":22},"定向钻",{"key":34,"text":207,"correct":22},"夯管","ADE",{"id":210,"libraryId":5,"type":15,"typeLabel":16,"stem":211,"options":212,"answer":222,"analysis":37},1149325,"燃气管网与供热管网相比，燃气管网独有的附属设备的是（ ）。",[213,215,216,218,220],{"key":20,"text":214,"correct":22},"凝水缸",{"key":24,"text":174,"correct":32},{"key":27,"text":217,"correct":32},"阀门",{"key":30,"text":219,"correct":32},"补偿器",{"key":34,"text":221,"correct":22},"放散管","AE",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":208,"analysis":37},1149326,"管道焊接完毕后，焊缝需要进行100%无损探伤检测的是（ ）。",[227,229,231,233,235],{"key":20,"text":228,"correct":22},"干线管道与设备、管件连接处和折点处的焊缝",{"key":24,"text":230,"correct":32},"穿越铁路、高速公路的管道在铁路路基两侧各15m 范围内",{"key":27,"text":232,"correct":32},"穿越城市主要道路的不通行管沟在道路两侧各10m 范围内",{"key":30,"text":234,"correct":22},"不具备强度试验条件的管道焊缝",{"key":34,"text":236,"correct":22},"现场制作的各种承压设备和管件",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":249,"analysis":37},1149327,"利用管道的位移来吸收热伸长的有（ ）。",[241,243,244,246,247],{"key":20,"text":242,"correct":22},"套筒式补偿器",{"key":24,"text":154,"correct":32},{"key":27,"text":245,"correct":32},"波纹管补偿器",{"key":30,"text":152,"correct":22},{"key":34,"text":248,"correct":32},"自然补偿器","AD",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":97,"analysis":37},1149329,"垃圾填埋场泥质防水层在拌和土摊铺碾压后检验项目包括（ ）。",[254,256,258,260,262],{"key":20,"text":255,"correct":22},"压实度",{"key":24,"text":257,"correct":22},"渗水",{"key":27,"text":259,"correct":32},"强度",{"key":30,"text":261,"correct":32},"刚度",{"key":34,"text":263,"correct":32},"水温稳定性",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":278,"analysis":37},1149330,"垃圾填埋场HDPE膜防渗层焊缝非破坏性检测方法有（ ）。",[268,270,272,274,276],{"key":20,"text":269,"correct":22},"气压",{"key":24,"text":271,"correct":22},"真空",{"key":27,"text":273,"correct":22},"电火花",{"key":30,"text":275,"correct":32},"剪切试验",{"key":34,"text":277,"correct":32},"剥离试验","ABC",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":67,"analysis":37},1149331,"HDPE膜生产焊接表述正确的有（ ）。",[283,285,287,289,291],{"key":20,"text":284,"correct":22},"通过试验性焊接后方可生产性焊接",{"key":24,"text":286,"correct":22},"边坡底部焊缝应从坡脚向场底延伸至少1.5m",{"key":27,"text":288,"correct":32},"临时焊接可使用溶剂或粘合剂",{"key":30,"text":290,"correct":22},"锚固沟的接缝可在坡顶下300mm的地方停止焊接",{"key":34,"text":292,"correct":32},"边坡和底部HDPE膜焊接应在每天气温较高时进行",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":249,"analysis":37},1149332,"下列关于HDPE 膜铺设施工要点说法正确是（ ）。",[297,299,301,303,305],{"key":20,"text":298,"correct":22},"铺膜要考虑工作面地形情况，减少十字焊缝以及应力集中",{"key":24,"text":300,"correct":32},"填埋场HDPE 膜铺设总体顺序一般为“先场底后边坡”",{"key":27,"text":302,"correct":32},"在铺设时应将卷材自下而上滚铺",{"key":30,"text":304,"correct":22},"铺设边坡HDPE 膜时，为避免HDPE 膜被风吹起和被拉出周边锚固沟，所有外露的HDPE 膜边缘应及时用沙袋或者其他重物压上",{"key":34,"text":306,"correct":32},"冬期施工应做好防风与保温工作",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":249,"analysis":37},1149333,"平面控制网按类型分为（ ）。",[311,313,315,317,319],{"key":20,"text":312,"correct":22},"方格网",{"key":24,"text":314,"correct":32},"三角网",{"key":27,"text":316,"correct":32},"附合环线",{"key":30,"text":318,"correct":22},"控制导线",{"key":34,"text":320,"correct":32},"闭合环线",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":97,"analysis":37},1149334,"各级基坑均应量测项目包括（ ）。",[325,327,329,331,333],{"key":20,"text":326,"correct":22},"墙顶水平位移",{"key":24,"text":328,"correct":22},"墙顶竖向位移",{"key":27,"text":330,"correct":32},"围护墙深层水平位移",{"key":30,"text":332,"correct":32},"土体深层水平位移",{"key":34,"text":334,"correct":32},"墙体内力",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":349,"analysis":37},1149335,"监控量测总结报告内容应包括（ ）。",[339,341,343,345,347],{"key":20,"text":340,"correct":32},"周边环境概况",{"key":24,"text":342,"correct":32},"监测项目及测点布置图",{"key":27,"text":344,"correct":32},"监测成果的过程曲线",{"key":30,"text":346,"correct":22},"监测频率",{"key":34,"text":348,"correct":22},"监测报警值","DE",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":364,"analysis":37},1149336,"竣工总图编绘完成后，应经（ ）审核、会签。",[354,356,358,360,362],{"key":20,"text":355,"correct":22},"施工单位项目技术负责人",{"key":24,"text":357,"correct":32},"施工单位技术负责人",{"key":27,"text":359,"correct":22},"项目总监",{"key":30,"text":361,"correct":32},"监理单位技术负责人",{"key":34,"text":363,"correct":32},"施工单位法人代表或授权人","AC",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":378,"analysis":37},1149337,"竣工图完成后，应经（ ）审核。",[369,371,372,374,376],{"key":20,"text":370,"correct":32},"施工单位项目负责人",{"key":24,"text":355,"correct":22},{"key":27,"text":373,"correct":22},"监理单位总监理工程师",{"key":30,"text":375,"correct":32},"建设单位项目负责人",{"key":34,"text":377,"correct":32},"设计单位项目负责人","BC",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":378,"analysis":37},1149338,"沥青混合料中，骨架-空隙结构的代表有（ ）。",[383,385,387,389,391],{"key":20,"text":384,"correct":32},"沥青砼",{"key":24,"text":386,"correct":22},"沥青碎石",{"key":27,"text":388,"correct":22},"OGFC",{"key":30,"text":390,"correct":32},"SMA",{"key":34,"text":392,"correct":32},"沥青表面处治",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":52,"analysis":37},1149339,"改性沥青混合料优点表述正确的是（ ）。",[397,399,401,403,405],{"key":20,"text":398,"correct":22},"延长使用寿命",{"key":24,"text":400,"correct":22},"较高的耐磨耗",{"key":27,"text":402,"correct":32},"较大弯拉能力",{"key":30,"text":404,"correct":22},"低温抗开裂",{"key":34,"text":406,"correct":22},"高温抗车辙",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":112,"analysis":37},1149340,"土中水有固、液、气三种形态，其中液态水有（ ）。",[411,413,415,417,419],{"key":20,"text":412,"correct":22},"吸着水",{"key":24,"text":414,"correct":22},"薄膜水",{"key":27,"text":416,"correct":22},"毛细水",{"key":30,"text":418,"correct":22},"重力水",{"key":34,"text":420,"correct":32},"上层滞水",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":36,"analysis":37},1149341,"以下关于厂拌石灰稳定土基层运输与摊铺施工技术要点正确的是（ ）。",[425,427,429,431,433],{"key":20,"text":426,"correct":22},"雨期施工应防止混合料淋雨",{"key":24,"text":428,"correct":22},"施工最低温度为5℃",{"key":27,"text":430,"correct":22},"降雨时应停止施工，已摊铺的应尽快碾压",{"key":30,"text":432,"correct":32},"摊铺时路床应干燥",{"key":34,"text":434,"correct":22},"拌成的稳定土应及时运送到铺筑现场",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":449,"analysis":37},1149342,"水泥砼路面胀缝应设置（ ）。",[439,441,443,445,447],{"key":20,"text":440,"correct":22},"补强钢筋支架",{"key":24,"text":442,"correct":22},"胀缝板",{"key":27,"text":444,"correct":32},"拉杆",{"key":30,"text":446,"correct":32},"端头挡板",{"key":34,"text":448,"correct":22},"传力杆","ABE",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":67,"analysis":37},1149343,"泥砼路面在（ ）地方，设置胀缝。",[454,456,458,460,462],{"key":20,"text":455,"correct":22},"邻近桥梁",{"key":24,"text":457,"correct":22},"板厚改变处",{"key":27,"text":459,"correct":32},"大半径曲线处",{"key":30,"text":461,"correct":22},"小半径曲线处",{"key":34,"text":463,"correct":32},"竖向曲线处",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":478,"analysis":37},1149344,"改性沥青混合料是指掺加（ ）或其他填料等外掺剂（改性剂）制成的沥青混合料。",[468,470,472,474,476],{"key":20,"text":469,"correct":32},"矿粉",{"key":24,"text":471,"correct":22},"橡胶",{"key":27,"text":473,"correct":22},"树脂",{"key":30,"text":475,"correct":22},"高分子聚合物",{"key":34,"text":477,"correct":32},"粘结剂","BCD",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":155,"analysis":37},1149345,"下列关于水泥混凝土路面配合比参数计算取值选项中，说法正确的是（ ）。",[483,485,487,489,491],{"key":20,"text":484,"correct":32},"应在满足弯拉强度计算值和耐久性两者要求的水灰比中取大值",{"key":24,"text":486,"correct":22},"应在满足弯拉强度计算值和耐久性两者要求的水灰比中取小值",{"key":27,"text":488,"correct":32},"应在按规范经验公式计算值和满足工作性要求的最大单位用水量中取大值",{"key":30,"text":490,"correct":22},"应在按规范经验公式计算值和满足工作性要求的最大单位用水量中取小值",{"key":34,"text":492,"correct":32},"应在根据水灰比计算值与满足耐久性要求的最小单位水泥用量中取小值",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":52,"analysis":37},1149346,"路堤土工合成材料应具有（ ）。",[497,499,501,503,505],{"key":20,"text":498,"correct":22},"抗拉强度",{"key":24,"text":500,"correct":22},"撕破强度",{"key":27,"text":502,"correct":32},"抗压强度",{"key":30,"text":504,"correct":22},"握持强度",{"key":34,"text":506,"correct":22},"顶破强度",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":67,"analysis":37},1149347,"再生沥青混合料性能试验指标有（ ）。",[511,513,515,517,519],{"key":20,"text":512,"correct":22},"空隙率",{"key":24,"text":514,"correct":22},"饱和度",{"key":27,"text":516,"correct":32},"残留马歇尔稳定度",{"key":30,"text":518,"correct":22},"流值",{"key":34,"text":520,"correct":32},"冻融劈裂抗拉强度比",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":112,"analysis":37},1149348,"水泥混凝土面层结构中需要配筋补强的部位有（ ）。",[525,527,529,531,533],{"key":20,"text":526,"correct":22},"繁重交通路段胀缝处",{"key":24,"text":528,"correct":22},"下穿市政管线路段",{"key":27,"text":530,"correct":22},"地下设施检查井周围",{"key":30,"text":532,"correct":22},"小于90°的面层角隅",{"key":34,"text":534,"correct":32},"繁重交通路段缩缝处",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":112,"analysis":37},1149349,"沥青路面材料再生工艺中，再生剂的技术要求有（ ）。",[539,541,543,545,547],{"key":20,"text":540,"correct":22},"具有软化与渗透能力",{"key":24,"text":542,"correct":22},"良好的流变性质",{"key":27,"text":544,"correct":22},"富含芳香酚",{"key":30,"text":546,"correct":22},"较高的表面张力",{"key":34,"text":548,"correct":32},"较大的稠度",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":67,"analysis":37},1149350,"土工格栅应用于路堤加筋，其选用产品应具备的特点（ ）。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"强度高",{"key":24,"text":556,"correct":22},"变形小",{"key":27,"text":558,"correct":32},"亲水性",{"key":30,"text":560,"correct":22},"糙度大",{"key":34,"text":562,"correct":32},"延度好",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":112,"analysis":37},1149351,"项目安全培训教育的主要内容有（ ）。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"工地安全制度",{"key":24,"text":570,"correct":22},"施工现场环境",{"key":27,"text":572,"correct":22},"工程施工特点",{"key":30,"text":574,"correct":22},"不安全因素",{"key":34,"text":576,"correct":32},"企业安全规章制度",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":67,"analysis":37},1149352,"基坑支护结构出现变形过大或较为危险的“踢脚”变形时，可采取（ ）。",[581,583,585,587,589],{"key":20,"text":582,"correct":22},"坡顶卸载",{"key":24,"text":584,"correct":22},"增加内支撑或锚杆",{"key":27,"text":586,"correct":32},"灌水",{"key":30,"text":588,"correct":22},"被动土压区堆载或注浆加固",{"key":34,"text":590,"correct":32},"回填土",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":155,"analysis":37},1149353,"当明挖基坑附近有建筑物时，地下水的控制方法宜采用（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":32},"井点降水",{"key":24,"text":598,"correct":22},"截水",{"key":27,"text":600,"correct":32},"喷射井点降水",{"key":30,"text":602,"correct":22},"回灌",{"key":34,"text":604,"correct":32},"管井降水",{"id":606,"libraryId":5,"type":15,"typeLabel":16,"stem":607,"options":608,"answer":36,"analysis":37},1149354,"模板支架、脚手架拆除施工时，施工现场应采取（ ）等措施。",[609,611,613,615,617],{"key":20,"text":610,"correct":22},"拆除现场应设作业区，边界设警示标志，由专人值守",{"key":24,"text":612,"correct":22},"拆除施工机械作业时由专人指挥",{"key":27,"text":614,"correct":22},"拆除顺序按要求由上而下逐层进行",{"key":30,"text":616,"correct":32},"拆除顺序按要求上下同时作业",{"key":34,"text":618,"correct":22},"拆除的模板、杆件、配件轻拿轻放、分类码放",{"id":620,"libraryId":5,"type":15,"typeLabel":16,"stem":621,"options":622,"answer":222,"analysis":37},1149355,"安全风险等级由安全风险（ ）的关系矩阵确定。",[623,625,627,629,631],{"key":20,"text":624,"correct":22},"发生概率等级",{"key":24,"text":626,"correct":32},"直接经济损失等级",{"key":27,"text":628,"correct":32},"周边环境影响损失等级",{"key":30,"text":630,"correct":32},"人员伤亡等级",{"key":34,"text":632,"correct":22},"风险损失等级",{"id":634,"libraryId":5,"type":15,"typeLabel":16,"stem":635,"options":636,"answer":278,"analysis":37},1149356,"风险等级评价的方法可采用（ ）。",[637,639,641,643,645],{"key":20,"text":638,"correct":22},"风险矩阵法",{"key":24,"text":640,"correct":22},"层次分析法",{"key":27,"text":642,"correct":22},"故障树法",{"key":30,"text":644,"correct":32},"专家调查法",{"key":34,"text":646,"correct":32},"项目工作分解结构—风险分解结构分析法",{"id":648,"libraryId":5,"type":15,"typeLabel":16,"stem":649,"options":650,"answer":278,"analysis":37},1149357,"项目部应通过（ ）告知各岗位人员本岗位存在的安全风险及应采取的措施。",[651,653,655,657,659],{"key":20,"text":652,"correct":22},"安全教育培训",{"key":24,"text":654,"correct":22},"班前讲话",{"key":27,"text":656,"correct":22},"安全技术交底",{"key":30,"text":658,"correct":32},"编制专项方案",{"key":34,"text":660,"correct":32},"制定操作规程",{"id":662,"libraryId":5,"type":15,"typeLabel":16,"stem":663,"options":664,"answer":675,"analysis":37},1149358,"现场处置方案是针对（ ）所制定的应急处置措施。",[665,667,669,671,673],{"key":20,"text":666,"correct":22},"具体场所",{"key":24,"text":668,"correct":32},"重要生产设施",{"key":27,"text":670,"correct":22},"具体装置",{"key":30,"text":672,"correct":32},"重大危险源",{"key":34,"text":674,"correct":22},"具体设施","ACE",{"id":677,"libraryId":5,"type":15,"typeLabel":16,"stem":678,"options":679,"answer":36,"analysis":37},1149359,"项目职业健康安全控制的重点是（ ）。",[680,682,684,686,688],{"key":20,"text":681,"correct":22},"人的不安全行为",{"key":24,"text":683,"correct":22},"物的不安全状态",{"key":27,"text":685,"correct":22},"作业环境的不安全因素",{"key":30,"text":687,"correct":32},"设计缺陷",{"key":34,"text":689,"correct":22},"管理缺陷",{"id":691,"libraryId":5,"type":15,"typeLabel":16,"stem":692,"options":693,"answer":82,"analysis":37},1149360,"现场安全检查方法包括（ ）。",[694,696,698,700,702],{"key":20,"text":695,"correct":32},"定期检查",{"key":24,"text":697,"correct":32},"日常性检查",{"key":27,"text":699,"correct":22},"常规检查",{"key":30,"text":701,"correct":22},"安全检查表法",{"key":34,"text":703,"correct":22},"仪器检查法",{"id":705,"libraryId":5,"type":15,"typeLabel":16,"stem":706,"options":707,"answer":278,"analysis":37},1149361,"安全管理检查评分分保证和一般项目，保证项目包括（ ）。",[708,710,712,714,716],{"key":20,"text":709,"correct":22},"安全生产责任制",{"key":24,"text":711,"correct":22},"施工组织设计",{"key":27,"text":713,"correct":22},"安全检查",{"key":30,"text":715,"correct":32},"持证上岗",{"key":34,"text":717,"correct":32},"安全标志",{"id":719,"libraryId":5,"type":15,"typeLabel":16,"stem":720,"options":721,"answer":449,"analysis":37},1149362,"当基坑坍塌征兆非常明显时，必须采取（ ）。",[722,723,725,727,728],{"key":20,"text":590,"correct":22},{"key":24,"text":724,"correct":22},"回填砂",{"key":27,"text":726,"correct":32},"降低地下水位",{"key":30,"text":582,"correct":32},{"key":34,"text":586,"correct":22},[730,734,737,740,743,746],{"id":731,"name":732,"category":7,"favorite":733},1,"领导干部任职前廉政法规知识测试题",92,{"id":735,"name":736,"category":7,"favorite":731},595,"建筑结构与设备",{"id":738,"name":739,"category":7,"favorite":731},715,"招标采购专业知识与法律法规",{"id":741,"name":742,"category":7,"favorite":731},848,"市政方向-通用基础",{"id":744,"name":745,"category":7,"favorite":8},534,"BIM工程师",{"id":747,"name":745,"category":7,"favorite":8},535]