[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-26":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":726},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,26,50,2019,[13,38,51,66,81,95,110,125,140,154,169,183,192,207,221,236,250,264,277,292,306,320,334,348,362,376,390,405,419,433,446,460,475,489,503,517,530,543,557,571,585,599,613,627,641,655,669,683,697,712],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1149204,2,"多选题","（2017 年真题）新建市政公用工程不开槽成品管的常用施工方法有（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","顶管法",true,{"key":24,"text":25,"correct":22},"B","夯管法",{"key":27,"text":28,"correct":29},"C","裂管法",false,{"key":31,"text":32,"correct":29},"D","沉管法",{"key":34,"text":35,"correct":22},"E","盾构法","ABE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":50,"analysis":37},1149205,"（2016 年真题）适用管径800mm 的不开槽施工方法有（ ）。",[42,43,45,47,48],{"key":20,"text":35,"correct":29},{"key":24,"text":44,"correct":22},"定向钻法",{"key":27,"text":46,"correct":22},"密闭式顶管法",{"key":31,"text":25,"correct":22},{"key":34,"text":49,"correct":29},"浅埋暗挖法","BCD",{"id":52,"libraryId":5,"type":15,"typeLabel":16,"stem":53,"options":54,"answer":65,"analysis":37},1149206,"（2018 年真题 广东海南）城市排水体制选择中，对旧城区改造与新区建设必须树立的生态文明理念有（ ）。",[55,57,59,61,63],{"key":20,"text":56,"correct":22},"尊重自然",{"key":24,"text":58,"correct":29},"认识自然",{"key":27,"text":60,"correct":22},"顺应自然",{"key":31,"text":62,"correct":22},"保护自然",{"key":34,"text":64,"correct":29},"绿化自然","ACD",{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":80,"analysis":37},1149207,"（2014 年真题）关于无压管道闭水试验长度的说法，正确的有（ ）。",[70,72,74,76,78],{"key":20,"text":71,"correct":22},"试验管段应按井距分隔，带井试验",{"key":24,"text":73,"correct":22},"一次试验不宜超过5 个连续井段",{"key":27,"text":75,"correct":22},"管内径大于700mm 时，抽取井段数1\u002F3 试验",{"key":31,"text":77,"correct":29},"管内径小于700mm 时，抽取井段数2\u002F3 试验",{"key":34,"text":79,"correct":29},"井段抽样采取随机抽样方式","ABC",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":80,"analysis":37},1149208,"（2013 年真题）适用与砂卵石底层的不开槽施工方法有（ ）。",[85,87,89,91,93],{"key":20,"text":86,"correct":22},"密闭式顶管",{"key":24,"text":88,"correct":22},"盾构",{"key":27,"text":90,"correct":22},"浅埋暗挖",{"key":31,"text":92,"correct":29},"定向钻",{"key":34,"text":94,"correct":29},"夯管",{"id":96,"libraryId":5,"type":15,"typeLabel":16,"stem":97,"options":98,"answer":109,"analysis":37},1149209,"（2010 年真题）关于供热管道补偿器安装的说法，正确的有（ ）",[99,101,103,105,107],{"key":20,"text":100,"correct":29},"管道补偿器的两端，应各设一个固定支座",{"key":24,"text":102,"correct":22},"靠近补偿器的两端，应至少各设有一个导向支座",{"key":27,"text":104,"correct":29},"应对补偿器进行预拉伸",{"key":31,"text":106,"correct":22},"填料式补偿器垂直安装时，有插管的一段应置于上部",{"key":34,"text":108,"correct":22},"管道安装、试压、保温完毕后，应将补偿器临时固定装置的坚固件松开","BDE",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},1149210,"（2015 年真题）疏水阀在蒸汽管中的作用包括（ ）。",[114,116,118,120,122],{"key":20,"text":115,"correct":22},"排除空气",{"key":24,"text":117,"correct":22},"阻止蒸汽逸漏",{"key":27,"text":119,"correct":29},"调节流量",{"key":31,"text":121,"correct":22},"排放凝结水",{"key":34,"text":123,"correct":22},"防止水锤","ABDE",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1149211,"（2017 年真题）关于供热管网工程试运行的说法,错误的有（ ）。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"工程完工后即可进行试运行",{"key":24,"text":132,"correct":29},"试运行应按建设单位、设计单位认可的参数进行",{"key":27,"text":134,"correct":22},"试运行中严禁对紧件进行热拧紧",{"key":31,"text":136,"correct":29},"试运行中应重点检查支架的工作状况",{"key":34,"text":138,"correct":22},"试运行的时间应为连续运行48h","ACE",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":65,"analysis":37},1149212,"（2011 年真题）以下需要有资质的检测部门进行强度和严密性试验的阀门是（ ）。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"一级管网主干线",{"key":24,"text":147,"correct":29},"二级管网主干线",{"key":27,"text":149,"correct":22},"支干线首端",{"key":31,"text":151,"correct":22},"供热站入口",{"key":34,"text":153,"correct":29},"与二级管网主干线直接连通",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},1149213,"（2014 年真题利用管道的位移吸收热伸长的补偿器有（ ）。",[158,160,162,164,166],{"key":20,"text":159,"correct":29},"自然补偿器",{"key":24,"text":161,"correct":29},"方形补偿器",{"key":27,"text":163,"correct":29},"波形补偿器",{"key":31,"text":165,"correct":22},"球形补偿器",{"key":34,"text":167,"correct":22},"套筒式补偿器","DE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":182,"analysis":37},1149214,"（2012 年真题）下列管道补偿器中，热力管道中，属于自然补偿的有（ ）。",[173,174,176,178,180],{"key":20,"text":165,"correct":29},{"key":24,"text":175,"correct":22},"Z 型",{"key":27,"text":177,"correct":22},"L 型",{"key":31,"text":179,"correct":29},"套筒补偿器",{"key":34,"text":181,"correct":29},"波纹补偿器","BC",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":168,"analysis":37},1149215,"（2014 年真题、2016 年真题）利用管道的位移吸收热伸长的补偿器有（ ）。",[187,188,189,190,191],{"key":20,"text":159,"correct":29},{"key":24,"text":161,"correct":29},{"key":27,"text":163,"correct":29},{"key":31,"text":165,"correct":22},{"key":34,"text":167,"correct":22},{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":206,"analysis":37},1149216,"（2019 年真题）关于供热管道安装前准备工作的说法，正确的有（ ）。",[196,198,200,202,204],{"key":20,"text":197,"correct":22},"管道安装前，应完成支、吊架的安装及防腐处理",{"key":24,"text":199,"correct":22},"管道的管径、壁厚和材质应符合设计要求，并经验收合格",{"key":27,"text":201,"correct":22},"管件支座和可预组织的部分宜在管道安装前完成",{"key":31,"text":203,"correct":29},"补偿器应在管道安装前先于管道连接",{"key":34,"text":205,"correct":22},"安装前应对中心线和支架高程进行复核","ABCE",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":80,"analysis":37},1149217,"（2011 年真题）燃气管不穿越的设施有（ ）。",[211,213,215,217,219],{"key":20,"text":212,"correct":22},"化工厂",{"key":24,"text":214,"correct":22},"加油站",{"key":27,"text":216,"correct":22},"热电厂",{"key":31,"text":218,"correct":29},"花坛",{"key":34,"text":220,"correct":29},"高速公路",{"id":222,"libraryId":5,"type":15,"typeLabel":16,"stem":223,"options":224,"answer":235,"analysis":37},1149218,"（2012 年真题）关于燃气管道穿越河底施工的说法，错误的有（ ）。",[225,227,229,231,233],{"key":20,"text":226,"correct":22},"管道的输送压力不应大于0.4MPa",{"key":24,"text":228,"correct":22},"必须采用钢管",{"key":27,"text":230,"correct":22},"在河流两岸上、下游宜设立标志",{"key":31,"text":232,"correct":22},"管道至规划河底的覆土厚度，应根据水流冲刷条件确定",{"key":34,"text":234,"correct":29},"稳管措施应根据计算确定","ABCD",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":80,"analysis":37},1149219,"（2012 年真题）燃气管道附属设备应包括（ ）。",[240,242,244,246,248],{"key":20,"text":241,"correct":22},"阀门",{"key":24,"text":243,"correct":22},"放散管",{"key":27,"text":245,"correct":22},"补偿器",{"key":31,"text":247,"correct":29},"疏水器",{"key":34,"text":249,"correct":29},"凝水器",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":50,"analysis":37},1149220,"（2013 年真题关于燃气管道穿越高速公路和城镇主干道时设置套管的说法，正确的是（ ）。",[254,256,258,260,262],{"key":20,"text":255,"correct":29},"宜采用钢筋混凝土管",{"key":24,"text":257,"correct":22},"套管内径比燃气管外径大100mm 以上",{"key":27,"text":259,"correct":22},"管道宜垂直高速公路布置",{"key":31,"text":261,"correct":22},"套管两端应密封",{"key":34,"text":263,"correct":29},"套管埋设深度不应小于2m",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":276,"analysis":37},1149221,"（2020年真题）在采取套管保护措施的前提下，地下燃气管道可穿越（）。",[268,270,272,273,275],{"key":20,"text":269,"correct":29},"加气站",{"key":24,"text":271,"correct":29},"商场",{"key":27,"text":220,"correct":22},{"key":31,"text":274,"correct":22},"铁路",{"key":34,"text":212,"correct":29},"CD",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":291,"analysis":37},1149222,"（2018 年真题）下列综合管廊施工注意事项错误的是（ ）。",[281,283,285,287,289],{"key":20,"text":282,"correct":29},"预制构件安装前，应复验合格，当构件上有裂缝且宽度超过0.2mm 时，应进行鉴定",{"key":24,"text":284,"correct":29},"综合管廊内可实行动火作业",{"key":27,"text":286,"correct":22},"混凝土底板和顶板留置施工缝时，应分仓浇筑",{"key":31,"text":288,"correct":29},"砌体结构应采取防渗措施",{"key":34,"text":290,"correct":22},"管廊顶板上部1000mm 范围内回填材料应采用轻型碾压机压实，大型碾压机不得在管廊顶板上部施工","CE",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":206,"analysis":37},1149223,"（2020年真题）连续浇筑综合管廊混凝土时，为保证混凝土振捣密实，在（）部位周边应辅助人工插捣。",[296,298,300,302,304],{"key":20,"text":297,"correct":22},"预留孔",{"key":24,"text":299,"correct":22},"预埋件",{"key":27,"text":301,"correct":22},"止水带",{"key":31,"text":303,"correct":29},"沉降缝",{"key":34,"text":305,"correct":22},"预埋管",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":36,"analysis":37},1149224,"（2012 年真题）垃圾卫生填埋场的填埋区工程的结构物主要有（ ）。",[310,312,314,316,318],{"key":20,"text":311,"correct":22},"渗沥液收集导排系统",{"key":24,"text":313,"correct":22},"防渗系统",{"key":27,"text":315,"correct":29},"排放系统",{"key":31,"text":317,"correct":29},"回收系统",{"key":34,"text":319,"correct":22},"基础层",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":182,"analysis":37},1149225,"（2017 年真题）关于生活垃圾填埋场HDPE 膜铺设的做法错误的有（ ）。",[324,326,328,330,332],{"key":20,"text":325,"correct":29},"总体施工顺序一般为“先边坡后场底”",{"key":24,"text":327,"correct":22},"冬期施工时应有防冻措施",{"key":27,"text":329,"correct":22},"铺设时应反复展开并拖动,以保证铺设平整",{"key":31,"text":331,"correct":29},"HDPE 膜施工完成后应立即转入下一工序,以形成对HDPE 膜的保护",{"key":34,"text":333,"correct":29},"应及时收集整理施工记录表",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":182,"analysis":37},1149226,"（2018 年真题 广东海南）泥质防水层检测项目包括（ ）试验。",[338,340,342,344,346],{"key":20,"text":339,"correct":29},"强度",{"key":24,"text":341,"correct":22},"压实度",{"key":27,"text":343,"correct":22},"渗水",{"key":31,"text":345,"correct":29},"冲击",{"key":34,"text":347,"correct":29},"满水",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":124,"analysis":37},1149227,"（2011 年真题）GCL 铺设正确的是（ ）。",[352,354,356,358,360],{"key":20,"text":353,"correct":22},"每一工作面施工前均要对基底进行修正和检修",{"key":24,"text":355,"correct":22},"调整控制搭接范围250±50mm",{"key":27,"text":357,"correct":29},"采用上压下的十字搭接",{"key":31,"text":359,"correct":22},"当日铺设当日覆盖，雨雪停工",{"key":34,"text":361,"correct":22},"接口处撒膨润土密封",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":375,"analysis":37},1149228,"（2010 年真题）生活垃圾填埋场施工中，应对聚乙烯膜（HDP E）产品的（ ）进行严格检验。",[366,368,370,372,374],{"key":20,"text":367,"correct":29},"针入度",{"key":24,"text":369,"correct":22},"均匀度",{"key":27,"text":371,"correct":22},"厚度",{"key":31,"text":373,"correct":22},"韧度",{"key":34,"text":339,"correct":22},"BCDE",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":206,"analysis":37},1149229,"（2016 年真题）垃圾填埋场与环境保护密切相关的因素有（ ）。",[380,382,384,386,388],{"key":20,"text":381,"correct":22},"选址",{"key":24,"text":383,"correct":22},"设计",{"key":27,"text":385,"correct":22},"施工",{"key":31,"text":387,"correct":29},"移交",{"key":34,"text":389,"correct":22},"运行",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":404,"analysis":37},1149230,"（2013 年真题）土木合成材料膨润土垫（GCL）施工流程主要包括（ ）。",[394,396,398,400,402],{"key":20,"text":395,"correct":29},"土工膜铺设",{"key":24,"text":397,"correct":22},"GCL 垫的铺设",{"key":27,"text":399,"correct":22},"搭接宽度调整与控制",{"key":31,"text":401,"correct":29},"GCL 垫熔接",{"key":34,"text":403,"correct":22},"搭接处层间撒膨润土","BCE",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":235,"analysis":37},1149231,"（2013 年真题）垃圾填埋场聚乙烯（HDP E）膜防渗系统施工的控制要点有（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"施工人员资格",{"key":24,"text":412,"correct":22},"施工机具有效性",{"key":27,"text":414,"correct":22},"HDPE 膜的质量",{"key":31,"text":416,"correct":22},"施工队伍资质",{"key":34,"text":418,"correct":29},"压实",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":291,"analysis":37},1149232,"（2019 年真题）下列基坑工程监控量测项目中，属于一级基坑应测的项目有（ ）。",[423,425,427,429,431],{"key":20,"text":424,"correct":29},"孔隙水压力",{"key":24,"text":426,"correct":29},"土压力",{"key":27,"text":428,"correct":22},"坡顶水平位移",{"key":31,"text":430,"correct":29},"周围建筑物水平位移",{"key":34,"text":432,"correct":22},"地下水位",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":445,"analysis":37},1149233,"（2018 年真题）下列一级基坑监测项目中，属于应测项目的有（ ）。",[437,438,440,441,443],{"key":20,"text":428,"correct":22},{"key":24,"text":439,"correct":22},"立柱竖向位移",{"key":27,"text":426,"correct":29},{"key":31,"text":442,"correct":22},"周围建筑物裂缝",{"key":34,"text":444,"correct":29},"坑底隆起","ABD",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":404,"analysis":37},1149234,"（2017 年真题）市政工程投标文件经济部分内容有（ ）。",[450,452,454,456,458],{"key":20,"text":451,"correct":29},"投标保证金",{"key":24,"text":453,"correct":22},"已标价的工程量",{"key":27,"text":455,"correct":22},"投标报价",{"key":31,"text":457,"correct":29},"资金风险管理体系及措施",{"key":34,"text":459,"correct":22},"拟分包项目情况",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":474,"analysis":37},1149235,"（2020年真题）关于因不可抗力导致相关费用调整的说法，正确的有（）。",[464,466,468,470,472],{"key":20,"text":465,"correct":22},"工程本身的损害由发包人承担",{"key":24,"text":467,"correct":29},"承包人人员伤亡所产生的费用，由发包人承担",{"key":27,"text":469,"correct":22},"承包人的停工损失，由承包人承担",{"key":31,"text":471,"correct":22},"运至施工现场待安装设备的损害，由发包人承担",{"key":34,"text":473,"correct":22},"工程所需清理、修复费用，由发包人承担","ACDE",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":276,"analysis":37},1149236,"（2016 年真题 广东海南）在施工合同风险防范措施中，工程项目常见的风险有（ ）。",[479,481,483,485,487],{"key":20,"text":480,"correct":29},"质量",{"key":24,"text":482,"correct":29},"安全",{"key":27,"text":484,"correct":22},"技术",{"key":31,"text":486,"correct":22},"经济",{"key":34,"text":488,"correct":29},"法律",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":445,"analysis":37},1149237,"（2011 年真题）需专家论证的工程有（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"5m 基坑工程",{"key":24,"text":496,"correct":22},"滑模",{"key":27,"text":498,"correct":29},"人工挖孔桩12m",{"key":31,"text":500,"correct":22},"顶管工程",{"key":34,"text":502,"correct":29},"250kN 常规起吊",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":235,"analysis":37},1149238,"（2013 年真题）施工现场“文明施工承诺牌”的基本内容包括（ ）。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"泥浆不外流",{"key":24,"text":510,"correct":22},"轮胎不沾泥",{"key":27,"text":512,"correct":22},"管线不损坏",{"key":31,"text":514,"correct":22},"渣土不乱抛",{"key":34,"text":516,"correct":29},"红灯不乱闯",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":182,"analysis":37},1149239,"（2015 年真题）热拌沥青混合料面层质量检查和验收的主控项目有（ ）。",[521,523,525,526,528],{"key":20,"text":522,"correct":29},"平整度",{"key":24,"text":524,"correct":22},"实度",{"key":27,"text":371,"correct":22},{"key":31,"text":527,"correct":29},"宽度",{"key":34,"text":529,"correct":29},"纵断高程",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":542,"analysis":37},1149240,"（2019 年真题）无机结合料稳定基层的质量检验的主控项目有（ ）。",[534,536,537,538,540],{"key":20,"text":535,"correct":22},"原材料",{"key":24,"text":529,"correct":29},{"key":27,"text":371,"correct":29},{"key":31,"text":539,"correct":29},"横坡",{"key":34,"text":541,"correct":22},"7d 无侧限抗压强度","AE",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":65,"analysis":37},1149241,"（2012 年真题）道路路基压实度的检测方法有（ ）。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"灌水法",{"key":24,"text":550,"correct":29},"蜡封法",{"key":27,"text":552,"correct":22},"环刀法",{"key":31,"text":554,"correct":22},"灌砂法",{"key":34,"text":556,"correct":29},"钻芯法",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":235,"analysis":37},1149242,"（2010 年真题）造成钻孔灌注桩塌孔的主要原因有（ ）。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"地层自立性差",{"key":24,"text":564,"correct":22},"钻孔时进尺过快",{"key":27,"text":566,"correct":22},"护壁泥浆性能差",{"key":31,"text":568,"correct":22},"成孔后没有及时灌注",{"key":34,"text":570,"correct":29},"孔底沉渣过厚",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":109,"analysis":37},1149243,"（2010 年真题）钻孔灌注桩桩端持力层为中风化岩层，应采用（ ）判定岩层界面。",[575,577,579,581,583],{"key":20,"text":576,"correct":29},"钻头重量",{"key":24,"text":578,"correct":22},"地质资料",{"key":27,"text":580,"correct":29},"钻头大小",{"key":31,"text":582,"correct":22},"主动钻杆抖动情况",{"key":34,"text":584,"correct":22},"现场捞渣取样",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":36,"analysis":37},1149244,"（2018 年真题）关于顶管顶进作业质量控制的说法，正确的是（ ）。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"开始顶进阶段，应严格控制顶进的速度和方向",{"key":24,"text":592,"correct":22},"顶进过程应采取及时纠偏和小角度纠偏措施",{"key":27,"text":594,"correct":29},"手工掘进管道下部仅120°范围不能超挖",{"key":31,"text":596,"correct":29},"在稳定土层中，手工掘进管道管顶以上超挖量宜为25mm",{"key":34,"text":598,"correct":22},"在软土层中顶进混凝土管时，宜采取防管节飘移措施",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":404,"analysis":37},1149245,"（2010 年真题）关于给排水柔性管道沟槽回填质量控制的说法，正确的有（ ）。",[603,605,607,609,611],{"key":20,"text":604,"correct":29},"管基有效支承角范围内用黏性土填充并夯实",{"key":24,"text":606,"correct":22},"管基有效支承角范围内用中粗砂填充密实",{"key":27,"text":608,"correct":22},"管道两侧采用人工回填",{"key":31,"text":610,"correct":29},"管顶以上0.5m 范围内采用机械回填",{"key":34,"text":612,"correct":22},"大口径柔性管道，回填施工中在管内设竖向支撑",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":404,"analysis":37},1149246,"（2013 年真题根据估算伤害的可能性和严重程度进行施工安全风险评价，下列评价中属于中度风险的有（ ）。",[617,619,621,623,625],{"key":20,"text":618,"correct":29},"可能+伤害",{"key":24,"text":620,"correct":22},"可能+轻微伤害",{"key":27,"text":622,"correct":22},"不可能+伤害",{"key":31,"text":624,"correct":29},"不可能+严重伤害",{"key":34,"text":626,"correct":22},"极不可能+严重伤害",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":474,"analysis":37},1149247,"（2017 年真题）工程施工过程中,影响施工安全生产的主要环境因素有（ ）。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"水文地质",{"key":24,"text":634,"correct":29},"项目人文氛围",{"key":27,"text":636,"correct":22},"防护设施",{"key":31,"text":638,"correct":22},"冬雨期施工",{"key":34,"text":640,"correct":22},"邻近建构（筑）物",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":109,"analysis":37},1149248,"（2020年真题）关于工程竣工验收的说法，正确的有（）。",[645,647,649,651,653],{"key":20,"text":646,"correct":29},"重要部位的地基与基础，由总监理工程师组织，施工单位、设计单位项目负责人参加验收",{"key":24,"text":648,"correct":22},"检验批及分项工程，由专业监理工程师组织施工单位专业质量或技术负责人验收",{"key":27,"text":650,"correct":29},"单位工程中的分包工程，由分包单位直接向监理单位提出验收申请",{"key":31,"text":652,"correct":22},"整个建设项目验收程序为：施工单位自验合格，总监理工程师验收认可后，由建设单位组织各方正式验收",{"key":34,"text":654,"correct":22},"验收时，对涉及结构安全、使用功能等重要的分部工程，需提供抽样检测合格报告",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":235,"analysis":37},1149249,"（2016 年真题）施工成本管理的原则包括（ ）。",[659,661,663,665,667],{"key":20,"text":660,"correct":22},"成本最低化",{"key":24,"text":662,"correct":22},"全面成本管理",{"key":27,"text":664,"correct":22},"成本责任制",{"key":31,"text":666,"correct":22},"成本管理有效性",{"key":34,"text":668,"correct":29},"成本行政指标考核",{"id":670,"libraryId":5,"type":15,"typeLabel":16,"stem":671,"options":672,"answer":80,"analysis":37},1149250,"（2020年真题）在设置施工成本管理组织机构时，要考虑到市政公用工程施工项目具有（）等特点。",[673,675,677,679,681],{"key":20,"text":674,"correct":22},"多变性",{"key":24,"text":676,"correct":22},"阶段性",{"key":27,"text":678,"correct":22},"流动性",{"key":31,"text":680,"correct":29},"单件性",{"key":34,"text":682,"correct":29},"简单性",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":474,"analysis":37},1149251,"常用的管道支架有（ ）。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"固定支架",{"key":24,"text":690,"correct":29},"刚性支架",{"key":27,"text":692,"correct":22},"滑动支架",{"key":31,"text":694,"correct":22},"导向支架",{"key":34,"text":696,"correct":22},"弹簧支架",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":711,"analysis":37},1149252,"地下燃气管道不得从（ ）穿越。",[701,703,705,707,709],{"key":20,"text":702,"correct":22},"大型构筑物",{"key":24,"text":704,"correct":29},"小型构筑物",{"key":27,"text":706,"correct":29},"河流",{"key":31,"text":708,"correct":22},"堆积易燃、易爆材料场地",{"key":34,"text":710,"correct":22},"具有腐蚀性液体的场地","ADE",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":235,"analysis":37},1149253,"涵洞是城镇道路路基工程的重要组成部分，涵洞有（ ）。《》（）",[716,718,720,722,724],{"key":20,"text":717,"correct":22},"管涵",{"key":24,"text":719,"correct":22},"拱形涵",{"key":27,"text":721,"correct":22},"盖板涵",{"key":31,"text":723,"correct":22},"箱涵",{"key":34,"text":725,"correct":29},"隧道",[727,731,734,737,740,743],{"id":728,"name":729,"category":7,"favorite":730},1,"领导干部任职前廉政法规知识测试题",92,{"id":732,"name":733,"category":7,"favorite":728},595,"建筑结构与设备",{"id":735,"name":736,"category":7,"favorite":728},715,"招标采购专业知识与法律法规",{"id":738,"name":739,"category":7,"favorite":728},848,"市政方向-通用基础",{"id":741,"name":742,"category":7,"favorite":8},534,"BIM工程师",{"id":744,"name":742,"category":7,"favorite":8},535]