[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":641},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,24,50,2019,[13,34,46,58,66,78,90,102,112,124,132,144,156,168,180,192,204,216,228,240,252,264,276,288,300,312,324,336,348,360,372,384,396,408,420,432,442,454,466,478,490,508,523,538,553,567,582,597,612,626],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1149103,1,"单选题","施工技术资料的编制要求和移交期限应在（ ）中做出明确规定。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","工程监理规划",false,{"key":24,"text":25,"correct":22},"B","开工批准文件",{"key":27,"text":28,"correct":22},"C","施工组织设计",{"key":30,"text":31,"correct":32},"D","施工合同文件",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1149104,"凡施工图结构、工艺、平面布置等有重大改变，或变更部分超过图面（ ）的，应当重新绘制竣工图。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1\u002F2",{"key":24,"text":41,"correct":32},"1\u002F3",{"key":27,"text":43,"correct":22},"1\u002F4",{"key":30,"text":45,"correct":22},"1\u002F5",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1149105,"工程质量监督机构,应在工程竣工验收之日起（ ）个工作日内，向备案机关提交工程质量监督报告。",[50,52,54,56],{"key":20,"text":51,"correct":22},"15",{"key":24,"text":53,"correct":22},"10",{"key":27,"text":55,"correct":22},"7",{"key":30,"text":57,"correct":32},"5",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},1149106,"建设单位必须在竣工验收（ ）个工作日前将验收的时间、地点及验收组名单书面通知工程质量监督机构。",[62,63,64,65],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":32},{"key":30,"text":57,"correct":22},{"id":67,"libraryId":5,"type":15,"typeLabel":16,"stem":68,"options":69,"answer":30,"analysis":33},1149107,"按《建设工程文件归档整理规范》GB\u002FT50328-2014要求，建设单位应当在工程竣工验收后（ ）内，向城建档案馆报送一套符合规定的建设工程档案。凡建设工程档案不齐全的，应当限期补充。",[70,72,74,76],{"key":20,"text":71,"correct":22},"15天",{"key":24,"text":73,"correct":22},"1个月",{"key":27,"text":75,"correct":22},"2个月",{"key":30,"text":77,"correct":32},"3个月",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":24,"analysis":33},1149108,"（ ）应对工程文件的立卷归档工作进行监督、检查、指导。",[82,84,86,88],{"key":20,"text":83,"correct":22},"市区监督部门",{"key":24,"text":85,"correct":32},"城建档案管理机构",{"key":27,"text":87,"correct":22},"住建部门",{"key":30,"text":89,"correct":22},"建设单位",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":30,"analysis":33},1149109,"检验批及分项工程应由（ ）组织施工单位项目专业质量（技术）负责人等进行验收。",[94,96,98,100],{"key":20,"text":95,"correct":22},"项目经理",{"key":24,"text":97,"correct":22},"项目技术负责人",{"key":27,"text":99,"correct":22},"总监理工程师",{"key":30,"text":101,"correct":32},"监理工程师",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},1149110,"工程施工质量验收规定，检验批及分项工程应由（ ）组织施工单位相关人员进行验收。",[106,107,109,110],{"key":20,"text":99,"correct":22},{"key":24,"text":108,"correct":32},"专业监理工程师",{"key":27,"text":95,"correct":22},{"key":30,"text":111,"correct":22},"施工单位技术负责人",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":27,"analysis":33},1149111,"工程竣工报告由施工单位编制，在工程完工后提交建设单位，以下（ ）可以不包含在报告中。",[116,118,120,122],{"key":20,"text":117,"correct":22},"施工组织设计文件",{"key":24,"text":119,"correct":22},"工程施工质量检查结果",{"key":27,"text":121,"correct":32},"竣工图",{"key":30,"text":123,"correct":22},"符合法律法规及工程建设强制性标准情况",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":30,"analysis":33},1149112,"工程质量监督机构，应在竣工验收之日起（ ）工作日内，向备案机关提交工程质量监督报告。",[128,129,130,131],{"key":20,"text":51,"correct":22},{"key":24,"text":53,"correct":22},{"key":27,"text":55,"correct":22},{"key":30,"text":57,"correct":32},{"id":133,"libraryId":5,"type":15,"typeLabel":16,"stem":134,"options":135,"answer":24,"analysis":33},1149113,"依附于城市道路的各种管线、设施应坚持()建设原则。",[136,138,140,142],{"key":20,"text":137,"correct":22},"先难后易",{"key":24,"text":139,"correct":32},"先地下，后地上",{"key":27,"text":141,"correct":22},"先有压管后无压管",{"key":30,"text":143,"correct":22},"先大管后小管",{"id":145,"libraryId":5,"type":15,"typeLabel":16,"stem":146,"options":147,"answer":24,"analysis":33},1149114,"城市道路工程的施工单位应当具有相应的（），并按照资质等级承担相应的城市道路的设计、施工任务。",[148,150,152,154],{"key":20,"text":149,"correct":22},"营业执照",{"key":24,"text":151,"correct":32},"资质等级",{"key":27,"text":153,"correct":22},"施工业绩",{"key":30,"text":155,"correct":22},"施工经验",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":24,"analysis":33},1149115,"因建设或者其他特殊需要临时占用城市绿化用地，须经城市人民政府()同意，并按照有关规定办理临时用地手续。",[160,162,164,166],{"key":20,"text":161,"correct":22},"城市绿化监督管理部门",{"key":24,"text":163,"correct":32},"城市绿化行政主管部门",{"key":27,"text":165,"correct":22},"城市绿化规划部门",{"key":30,"text":167,"correct":22},"城市建设主管部门",{"id":169,"libraryId":5,"type":15,"typeLabel":16,"stem":170,"options":171,"answer":27,"analysis":33},1149116,"施工作业单位应当在（）的路段和时间内施工作业，并在距离施工作业地点来车方向安全距离处置明显的安全警示标志，采取防护措施。",[172,174,176,178],{"key":20,"text":173,"correct":22},"合理",{"key":24,"text":175,"correct":22},"方便施工",{"key":27,"text":177,"correct":32},"经批准",{"key":30,"text":179,"correct":22},"封闭后",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":27,"analysis":33},1149118,"任何单位都必须经公安交通管理部门和()的批准，才能按规定占用和挖掘城市道路。",[184,186,188,190],{"key":20,"text":185,"correct":22},"上级主管部门",{"key":24,"text":187,"correct":22},"当地建设管理部门",{"key":27,"text":189,"correct":32},"市政工程行政主管部门",{"key":30,"text":191,"correct":22},"市政道路养护部门",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":20,"analysis":33},1149119,"城镇道路施工中，有关质量控制说法正确的是（ ）。",[196,198,200,202],{"key":20,"text":197,"correct":32},"前一分项工程未经验收合格严禁进行后一分项工程施工",{"key":24,"text":199,"correct":22},"路面附属结构施工可不进行验收，最后进行",{"key":27,"text":201,"correct":22},"道路基层验收以密实度为准",{"key":30,"text":203,"correct":22},"道路摊铺层可不必进行验收，一天摊铺完成",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":27,"analysis":33},1149120,"热拌沥青混合料路面应待摊铺层自然降温至表面温度低于（ ）后，方可开放交通。",[208,210,212,214],{"key":20,"text":209,"correct":22},"40℃",{"key":24,"text":211,"correct":22},"45℃",{"key":27,"text":213,"correct":32},"50℃",{"key":30,"text":215,"correct":22},"55℃",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":30,"analysis":33},1149121,"水泥混凝土道路在面层混凝土（ ）达到设计强度，且填缝完成前，不得开放交通。",[220,222,224,226],{"key":20,"text":221,"correct":22},"抗压强度",{"key":24,"text":223,"correct":22},"抗拉强度",{"key":27,"text":225,"correct":22},"抗折强度",{"key":30,"text":227,"correct":32},"弯拉强度",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},1149122,"索鞍安装时应根据设计提供的( )就位，在加劲梁架设、桥面铺装过程中应按设计提供的数据逐渐顶推到永久位置。",[232,234,236,238],{"key":20,"text":233,"correct":32},"预偏量",{"key":24,"text":235,"correct":22},"设计位置",{"key":27,"text":237,"correct":22},"施工位置",{"key":30,"text":239,"correct":22},"顶推量",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":24,"analysis":33},1149123,"有关桥梁分项工程质量控制说法错误的是( )。",[244,246,248,250],{"key":20,"text":245,"correct":22},"应按《城市桥梁工程施工与质量验收规范》GJJ2-2008进行质量控制",{"key":24,"text":247,"correct":32},"分项工程完成后应进行自检、交接检验合格后，即可进行下一个分项工程施工",{"key":27,"text":249,"correct":22},"应形成齐全完整的质量检查文件",{"key":30,"text":251,"correct":22},"检验文件经监理工程师检查签认后，方可进行下一个分项工程施工",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":27,"analysis":33},1149124,"有关桥梁工程检验试验说法错误的是（ ）。",[256,258,260,262],{"key":20,"text":257,"correct":22},"工程采用的主要材料、半成品、成品、构配件、器具和设备应进行验收和复验",{"key":24,"text":259,"correct":22},"验收和复验专业质量标准和要求应经过监理工程师检查认可",{"key":27,"text":261,"correct":32},"涉及结构安全的项目监理工程师进行平行检测并确认合格即可",{"key":30,"text":263,"correct":22},"凡涉及结构安全和使用功能的，监理工程师应按规定进行平行检测或见证取样检测并确认合格",{"id":265,"libraryId":5,"type":15,"typeLabel":16,"stem":266,"options":267,"answer":30,"analysis":33},1149125,"吊索运输、安装过程中不得受损坏。吊索安装应与加劲梁安装配合进行，并对号入座，安装时必须采取防止（ ）措施。",[268,270,272,274],{"key":20,"text":269,"correct":22},"偏移",{"key":24,"text":271,"correct":22},"剪切",{"key":27,"text":273,"correct":22},"弯折",{"key":30,"text":275,"correct":32},"扭转",{"id":277,"libraryId":5,"type":15,"typeLabel":16,"stem":278,"options":279,"answer":20,"analysis":33},1149126,"盾构法隧道掘进速度不必与地表控制的()相协调。",[280,282,284,286],{"key":20,"text":281,"correct":32},"侧面土压平衡调整值",{"key":24,"text":283,"correct":22},"进出土量",{"key":27,"text":285,"correct":22},"隆陷值",{"key":30,"text":287,"correct":22},"同步注浆",{"id":289,"libraryId":5,"type":15,"typeLabel":16,"stem":290,"options":291,"answer":30,"analysis":33},1149127,"隧道采用钻爆法施工时，必须事先编制爆破方案()。",[292,294,296,298],{"key":20,"text":293,"correct":22},"报监理批准，并经城市主管部门同意后方可实施",{"key":24,"text":295,"correct":22},"报城管部门批准，并经交通部门同意后方可实施",{"key":27,"text":297,"correct":22},"报业主批准，并经公安部门同意后方可实施",{"key":30,"text":299,"correct":32},"报城市主管部门批准，并经公安部门同意后方可实施",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1149128,"喷锚暗挖隧道开挖面必须保持在()条件下施工。",[304,306,308,310],{"key":20,"text":305,"correct":32},"无水",{"key":24,"text":307,"correct":22},"无粉尘",{"key":27,"text":309,"correct":22},"无卵石",{"key":30,"text":311,"correct":22},"无障碍物",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":20,"analysis":33},1149129,"喷锚暗挖隧道施工应充分利用围岩自承作用，开挖后及时施工初期支护结构并适时()。",[316,318,320,322],{"key":20,"text":317,"correct":32},"闭合",{"key":24,"text":319,"correct":22},"注浆",{"key":27,"text":321,"correct":22},"超前支护",{"key":30,"text":323,"correct":22},"施工二衬",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":30,"analysis":33},1149130,"根据《地下铁道工程施工及验收规范》的有关规定，隧道采用钻爆法施工时，必须事先编制爆破方案，在实施前还需履行的程序是()。",[328,330,332,334],{"key":20,"text":329,"correct":22},"报业主批准，并经城市主管部门同意",{"key":24,"text":331,"correct":22},"报监理批准，并经公安部门同意",{"key":27,"text":333,"correct":22},"报上级公司批准，并经城市主管部门同意",{"key":30,"text":335,"correct":32},"报城市主管部门批准，并经公安部门同意",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":27,"analysis":33},1149131,"在给水排水工程中，接触饮用水的产品除满足设计要求外，还要求( )。",[340,342,344,346],{"key":20,"text":341,"correct":22},"品种符合设计要求",{"key":24,"text":343,"correct":22},"必须符合环保要求",{"key":27,"text":345,"correct":32},"必须符合卫生性能要求",{"key":30,"text":347,"correct":22},"必须符合国家产业政策要求",{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":20,"analysis":33},1149132,"给水排水压力管道做水压试验前，除接口外，管道两侧及管顶以上回填高度不应小于( )；水压试验合格后，应及时回填其余部分。",[352,354,356,358],{"key":20,"text":353,"correct":32},"0.5m",{"key":24,"text":355,"correct":22},"2m",{"key":27,"text":357,"correct":22},"1.0m",{"key":30,"text":359,"correct":22},"1.5m",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":30,"analysis":33},1149133,"《城镇供热管网工程施工及验收规范》CJJ 28-2014中规定的热力管道施焊单位应具备的条件不包括( )。",[364,366,368,370],{"key":20,"text":365,"correct":22},"有负责焊接工程的焊接技术人员、检查人员和检验人员",{"key":24,"text":367,"correct":22},"应有保证焊接工程质量达到标准的措施",{"key":27,"text":369,"correct":22},"焊工应持有有效合格证，并应在合格证准予的范围内焊接",{"key":30,"text":371,"correct":32},"应具有施工所需的吊装及安装设备",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},1149134,"施焊单位应有符合焊接工艺要求的( )且性能稳定可靠。",[376,378,380,382],{"key":20,"text":377,"correct":32},"焊接设备",{"key":24,"text":379,"correct":22},"吊装机械",{"key":27,"text":381,"correct":22},"安装设施",{"key":30,"text":383,"correct":22},"大型机械",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":20,"analysis":33},1149135,"关于聚乙烯燃气管道连接的说法，错误的是()。",[388,390,392,394],{"key":20,"text":389,"correct":32},"不同标准尺寸比(SDR)的材料，应使用热熔连接",{"key":24,"text":391,"correct":22},"不同级别材料，必须使用电熔连接",{"key":27,"text":393,"correct":22},"施工前应对连接参数进行试验",{"key":30,"text":395,"correct":22},"在热熔连接组对2，应清除表皮的氧化层",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":24,"analysis":33},1149136,"不同级别的聚乙烯燃气管道连接时，必须采用( )。",[400,402,404,406],{"key":20,"text":401,"correct":22},"热熔连接",{"key":24,"text":403,"correct":32},"电熔连接",{"key":27,"text":405,"correct":22},"螺纹连接",{"key":30,"text":407,"correct":22},"法兰连接",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},1149137,"天然气管道应在（）舱室内敷设。",[412,414,416,418],{"key":20,"text":413,"correct":32},"独立",{"key":24,"text":415,"correct":22},"单独",{"key":27,"text":417,"correct":22},"专业",{"key":30,"text":419,"correct":22},"阻燃",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},1149138,"热力管道不应与（）同舱敷设。",[424,426,428,430],{"key":20,"text":425,"correct":22},"给水管道",{"key":24,"text":427,"correct":32},"电力电缆",{"key":27,"text":429,"correct":22},"污水管",{"key":30,"text":431,"correct":22},"电信电缆",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},1149139,"热力管道采用蒸汽介质时应在（）舱室内敷设。",[436,437,438,440],{"key":20,"text":415,"correct":22},{"key":24,"text":413,"correct":32},{"key":27,"text":439,"correct":22},"特殊",{"key":30,"text":441,"correct":22},"压力",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":27,"analysis":33},1149140,"综合管廊应统一规划、设计、施工和维护，并应满足管线的使用和运营维护要求，纳入中和管廊的（）应有专项（）设计。",[446,448,450,452],{"key":20,"text":447,"correct":22},"管线，管道",{"key":24,"text":449,"correct":22},"管道，管线",{"key":27,"text":451,"correct":32},"管线，管线",{"key":30,"text":453,"correct":22},"管道，管道",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":24,"analysis":33},1149141,"当需要对地下管线信息系统的软、硬件进行更新或升级时，必须进行相关数据（），并确保在系统和数据安全的情况下进行。",[458,460,462,464],{"key":20,"text":459,"correct":22},"查验",{"key":24,"text":461,"correct":32},"备份",{"key":27,"text":463,"correct":22},"核查",{"key":30,"text":465,"correct":22},"检查",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":24,"analysis":33},1149142,"地下管线的开挖、调查，应在（）的情况下进行。",[470,472,474,476],{"key":20,"text":471,"correct":22},"符合设计要求",{"key":24,"text":473,"correct":32},"安全",{"key":27,"text":475,"correct":22},"勘探完成",{"key":30,"text":477,"correct":22},"设计交底完成",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":30,"analysis":33},1149143,"电缆和燃气管道的开挖，必须有（）的配合。",[482,484,486,488],{"key":20,"text":483,"correct":22},"监理",{"key":24,"text":485,"correct":22},"技术负责人",{"key":27,"text":487,"correct":22},"安全员",{"key":30,"text":489,"correct":32},"专业人员",{"id":491,"libraryId":5,"type":492,"typeLabel":493,"stem":494,"options":495,"answer":507,"analysis":33},1149144,2,"多选题","（2018 年真题）下列路面材料适用于各种等级道路面层的有（ ）。",[496,498,500,502,504],{"key":20,"text":497,"correct":32},"热拌沥青混合料",{"key":24,"text":499,"correct":22},"冷拌沥青混合料",{"key":27,"text":501,"correct":32},"温拌沥青混合料",{"key":30,"text":503,"correct":22},"沥青表面处治",{"key":505,"text":506,"correct":22},"E","沥青贯入式","AC",{"id":509,"libraryId":5,"type":492,"typeLabel":493,"stem":510,"options":511,"answer":522,"analysis":33},1149145,"（2018 年真题 广东海南）路面基层的性能指标包括（ ）。",[512,514,516,518,520],{"key":20,"text":513,"correct":32},"强度",{"key":24,"text":515,"correct":32},"扩散荷载的能力",{"key":27,"text":517,"correct":32},"水稳定性",{"key":30,"text":519,"correct":22},"抗滑",{"key":505,"text":521,"correct":22},"低噪","ABC",{"id":524,"libraryId":5,"type":492,"typeLabel":493,"stem":525,"options":526,"answer":537,"analysis":33},1149146,"（2013 年真题下列城市道路路面病害中，属于水泥混凝土路面病害的有（ ）。",[527,529,531,533,535],{"key":20,"text":528,"correct":32},"唧泥",{"key":24,"text":530,"correct":22},"拥包",{"key":27,"text":532,"correct":32},"错台",{"key":30,"text":534,"correct":32},"板底脱空",{"key":505,"text":536,"correct":22},"车辙变形","ACD",{"id":539,"libraryId":5,"type":492,"typeLabel":493,"stem":540,"options":541,"answer":552,"analysis":33},1149147,"（2010 年真题）沥青混凝土路面的再生利用中，对采用的再生剂的技术要求有（ ）。",[542,544,546,548,550],{"key":20,"text":543,"correct":32},"具有良好的流变性质",{"key":24,"text":545,"correct":32},"具有适当黏度",{"key":27,"text":547,"correct":22},"具有良好的塑性",{"key":30,"text":549,"correct":32},"具有溶解分散沥青质的能力",{"key":505,"text":551,"correct":32},"具有较高的表面张力","ABDE",{"id":554,"libraryId":5,"type":492,"typeLabel":493,"stem":555,"options":556,"answer":522,"analysis":33},1149148,"（2017 年真题）城镇沥青路面道路结构组成有（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":32},"路基",{"key":24,"text":560,"correct":32},"基层",{"key":27,"text":562,"correct":32},"面层",{"key":30,"text":564,"correct":22},"热层",{"key":505,"text":566,"correct":22},"排水层",{"id":568,"libraryId":5,"type":492,"typeLabel":493,"stem":569,"options":570,"answer":581,"analysis":33},1149149,"（2019 年真题）刚性路面施工时，应在（ ）处设置胀缝。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"检查井周围",{"key":24,"text":574,"correct":22},"纵向施工缝",{"key":27,"text":576,"correct":32},"小半径平曲线",{"key":30,"text":578,"correct":32},"板厚改变",{"key":505,"text":580,"correct":32},"邻近桥梁","CDE",{"id":583,"libraryId":5,"type":492,"typeLabel":493,"stem":584,"options":585,"answer":596,"analysis":33},1149150,"（2020年真题）下列沥青混合料中，属于骨架-空隙结构的有（）。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"普通沥青混合料",{"key":24,"text":589,"correct":32},"沥青碎石混合料",{"key":27,"text":591,"correct":22},"改性沥青混合料",{"key":30,"text":593,"correct":32},"OGFC排水沥青混合料",{"key":505,"text":595,"correct":22},"沥青玛珶脂碎石混合料","BD",{"id":598,"libraryId":5,"type":492,"typeLabel":493,"stem":599,"options":600,"answer":611,"analysis":33},1149151,"（2020年真题）再生沥青混合料生产工艺中的性能试验指标除了矿料间隙率、饱和度，还有（）。",[601,603,605,607,609],{"key":20,"text":602,"correct":32},"空隙率",{"key":24,"text":604,"correct":22},"配合比",{"key":27,"text":606,"correct":32},"马歇尔稳定度",{"key":30,"text":608,"correct":22},"车辙试验稳定度",{"key":505,"text":610,"correct":32},"流值","ACE",{"id":613,"libraryId":5,"type":492,"typeLabel":493,"stem":614,"options":615,"answer":522,"analysis":33},1149152,"（2014 年真题）下列城市道路基层中，属于柔性基层的有（ ）。",[616,618,620,622,624],{"key":20,"text":617,"correct":32},"级配碎石基层",{"key":24,"text":619,"correct":32},"级配砂砾基层",{"key":27,"text":621,"correct":32},"沥青碎石基层",{"key":30,"text":623,"correct":22},"水泥稳定碎石基层",{"key":505,"text":625,"correct":22},"石灰粉煤灰稳定砂砾基层",{"id":627,"libraryId":5,"type":492,"typeLabel":493,"stem":628,"options":629,"answer":640,"analysis":33},1149153,"（2010 年真题）城市道路土质路基压实的原则有（ ）。",[630,632,634,636,638],{"key":20,"text":631,"correct":32},"先轻后重",{"key":24,"text":633,"correct":32},"先慢后快",{"key":27,"text":635,"correct":32},"先静后振",{"key":30,"text":637,"correct":32},"轮迹重叠",{"key":505,"text":639,"correct":22},"先高后低","ABCD",[642,645,648,651,654,657],{"id":15,"name":643,"category":7,"favorite":644},"领导干部任职前廉政法规知识测试题",92,{"id":646,"name":647,"category":7,"favorite":15},595,"建筑结构与设备",{"id":649,"name":650,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":652,"name":653,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":655,"name":656,"category":7,"favorite":8},534,"BIM工程师",{"id":658,"name":656,"category":7,"favorite":8},535]