[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-802-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":611},{"id":5,"name":6,"category":7,"favorite":8},802,"一建市政公用工程实务","建筑工程",0,23,50,2019,[13,34,46,58,70,82,93,105,117,129,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,331,343,354,366,378,389,400,412,424,434,446,458,470,482,494,506,518,530,542,554,566,577,589,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1149053,1,"单选题","采用双机抬吊作业时，应选用起重性能相似的起重机，每台起重机载荷不得超过允许载荷的（ ），施工中必须保持两台起重机同步作业。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","90％",false,{"key":24,"text":25,"correct":26},"B","80％",true,{"key":28,"text":29,"correct":22},"C","60％",{"key":31,"text":32,"correct":22},"D","70％","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1149054,"建设单位应在拆除工程开工前（ ）d，将有关资料报送建设工程所在地的县级以上地方人民政府建设行政主管部门备案。",[38,40,42,44],{"key":20,"text":39,"correct":22},"7",{"key":24,"text":41,"correct":26},"15",{"key":28,"text":43,"correct":22},"28",{"key":31,"text":45,"correct":22},"30",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1149055,"施工单位与建设单位在签订拆除工程的施工合同时，应签订安全生产管理协议，明确双方的安全管理责任，其中施工单位应对拆除工程的（ ）负直接责任。",[50,52,54,56],{"key":20,"text":51,"correct":26},"安全技术管理",{"key":24,"text":53,"correct":22},"环境保护",{"key":28,"text":55,"correct":22},"地下管线保护",{"key":31,"text":57,"correct":22},"施工安全过程检查",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1149056,"在拆除桥梁过程中，通过计算分析，对标高、变形、应力实时控制，及时将监控反馈（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"建设单位",{"key":24,"text":65,"correct":22},"监理单位",{"key":28,"text":67,"correct":22},"施工单位",{"key":31,"text":69,"correct":26},"施工操作人员",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1149057,"对复杂结构的桥梁或拆除过程复杂、困难的情况，应该采取（ ）手段，确保施工安全。",[74,76,78,80],{"key":20,"text":75,"correct":26},"仪器监测",{"key":24,"text":77,"correct":22},"计算分析",{"key":28,"text":79,"correct":22},"体系转换",{"key":31,"text":81,"correct":22},"局部临时加固",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1149058,"桥梁拆除初步施工组织设计制定过程中，应针对结构体系、类型不同而采取不同的拆除方法，结合（ ），安排拆除步骤，控制拆除过程的结构内力。",[86,88,90,91],{"key":20,"text":87,"correct":22},"设计图纸要求",{"key":24,"text":89,"correct":22},"原结构施工方法",{"key":28,"text":77,"correct":26},{"key":31,"text":92,"correct":22},"桥梁病害严重程度",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":20,"analysis":33},1149059,"箱涵顶进穿越铁路路基时，应（ ）开挖和顶进。",[97,99,101,103],{"key":20,"text":98,"correct":26},"在列车运行间隙",{"key":24,"text":100,"correct":22},"连续",{"key":28,"text":102,"correct":22},"快速",{"key":31,"text":104,"correct":22},"慢速",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1149060,"箱涵顶进在穿越铁路路基时，必须对铁道线路进行适当加固并（ ）。",[109,111,113,115],{"key":20,"text":110,"correct":22},"降低顶进速度",{"key":24,"text":112,"correct":22},"临时封闭线路",{"key":28,"text":114,"correct":26},"限制列车车速",{"key":31,"text":116,"correct":22},"加固路基",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":20,"analysis":33},1149061,"顶进小型箱涵穿越铁路路基时，可用调轨梁或（ ）加固线路。",[121,123,125,127],{"key":20,"text":122,"correct":26},"轨束梁",{"key":24,"text":124,"correct":22},"施工便梁",{"key":28,"text":126,"correct":22},"横梁",{"key":31,"text":128,"correct":22},"纵横梁",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},1149062,"当模板支架搭设高度和施工荷载超过有关规范或规定范围时，按规定需要组织专家论证时，必须按相关规定进行设计，进行结构计算和（ ）验算确定施工技术方案。",[133,135,137,139],{"key":20,"text":134,"correct":22},"强度",{"key":24,"text":136,"correct":22},"刚度",{"key":28,"text":138,"correct":22},"稳定性",{"key":31,"text":140,"correct":26},"安全性",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":31,"analysis":33},1149063,"施工现场附近有电力架空线路时，施工中应设专人监护，确认钻机安全距离在任何状态下均符合：电压在1～10kV时其安全距离为（ ）。",[145,147,149,151],{"key":20,"text":146,"correct":22},"4m",{"key":24,"text":148,"correct":22},"4.5m",{"key":28,"text":150,"correct":22},"5m",{"key":31,"text":152,"correct":26},"6m",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":24,"analysis":33},1149064,"钻孔应连续作业。相邻桩之间净距小于5m时，邻桩混凝土强度达到（ ）后，方可进行钻孔施工。",[157,159,161,163],{"key":20,"text":158,"correct":22},"3MPa",{"key":24,"text":160,"correct":26},"5MPa",{"key":28,"text":162,"correct":22},"8MPa",{"key":31,"text":164,"correct":22},"10MPa",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":28,"analysis":33},1149065,"钻孔灌筑桩施工中，深水河流中必须搭设水上作业平台，作业平台应根据施工荷载、水深、水流、工程地质状况进行施工设计，其高程应比施工期间的最高水位高（ ）以上。",[169,171,173,175],{"key":20,"text":170,"correct":22},"1000mm",{"key":24,"text":172,"correct":22},"500mm",{"key":28,"text":174,"correct":26},"700mm",{"key":31,"text":176,"correct":22},"800mm",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},1149066,"在现行《焊接与切割安全》GB9448-1999中规定，在气割及焊接作业时，周围（ ）范围内不得堆放易燃易爆物品。作业中氧气瓶、乙炔瓶和割锯的距离不得小于（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"5m;6m",{"key":24,"text":184,"correct":22},"6m；6m",{"key":28,"text":186,"correct":22},"8m;8m",{"key":31,"text":188,"correct":26},"10m；10m",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":28,"analysis":33},1149067,"沉桩作业应由具有经验的（ ）指挥。作业前指挥人员必须检查各岗位人员的准备工作情况和周围环境，确认安全后，方可向操作人员发出指令。",[193,195,197,199],{"key":20,"text":194,"correct":22},"专职安全人员",{"key":24,"text":196,"correct":22},"施工技术人员",{"key":28,"text":198,"correct":26},"技术工人",{"key":31,"text":200,"correct":22},"项目总工",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":24,"analysis":33},1149068,"钢桩吊装应由具有吊装施工经验的（ ）主持，吊装作业必须由（ ）指挥。",[205,207,209,211],{"key":20,"text":206,"correct":22},"吊装技术人员，专职安全人员",{"key":24,"text":208,"correct":26},"施工技术人员，信号工",{"key":28,"text":210,"correct":22},"专职安全人员，吊装技术人员",{"key":31,"text":212,"correct":22},"信号工，施工技术人员",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1149069,"混凝土桩制作安全控制要点之一是：加工成型的钢筋笼、钢筋网和钢筋骨架等应水平放置，码放高度不得超过（ ）；码放层数不宜超过（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"1.5m;2层",{"key":24,"text":220,"correct":26},"2m；3层",{"key":28,"text":222,"correct":22},"2.2m；3层",{"key":31,"text":224,"correct":22},"30m；4层",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":20,"analysis":33},1149070,"防止盾构始发期间土砂随地下水从衬砌外围与洞体之间的间隙涌入工作井的应急措施是（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":26},"作好洞口密封，并设置注浆孔",{"key":24,"text":232,"correct":22},"确认洞口土体加固效果",{"key":28,"text":234,"correct":22},"拆除洞口临时围护结构",{"key":31,"text":236,"correct":22},"监测地下水位",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1149071,"关于盾构法施工掘进过程中换刀施工说法正确的是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"换刀作业必须在地质条件较好、地层较稳定的地段进行",{"key":24,"text":244,"correct":26},"当前方地层不满足气密性要求，宜采用地层加固措施稳定开挖面",{"key":28,"text":246,"correct":22},"带压换刀作业不适于在不稳定地层中进行",{"key":31,"text":248,"correct":22},"刀盘前方地层和土仓可以不满足气密性要求",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1149072,"以下关于盾构施工时邻近既有建（构）筑物安全控制要点说法正确的是（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"施工单位分析、预测、确定建（构）筑物的容许极限变形值",{"key":24,"text":256,"correct":26},"依据建筑物基础结构类型采取加固或托换措施",{"key":28,"text":258,"correct":22},"穿越过程中，加强既有建（构）筑物受力变化观测",{"key":31,"text":260,"correct":22},"地层变形超过施工管理值，应立即采取保护措施",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1149073,"下列关于盾构机穿越江河段施工说法错误的是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":22},"设定适当的开挖面压力，加强开挖面管理与掘进参数控制，防止冒浆和坍塌",{"key":24,"text":268,"correct":22},"盾构密封系统进行全面检查和处理",{"key":28,"text":270,"correct":26},"加强对地层变形监测",{"key":31,"text":272,"correct":22},"采用快凝早强注浆材料，加强同步注浆和二次补充注浆",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1149074,"下列关于在特殊地段和特殊地质条件下盾构施工安全措施说法错误的是（ ）。",[277,279,281,283],{"key":20,"text":278,"correct":22},"施工单位制定专项施工方案",{"key":24,"text":280,"correct":22},"合理设定开挖面压力，控制地层变形",{"key":28,"text":282,"correct":22},"根据工程水文地质条件，确定同步注浆的材料、压力和流量",{"key":31,"text":284,"correct":26},"必须精减监测测点、降低监测频率，并根据监测结果调整掘进参数",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1149075,"以下不属于喷锚暗挖法施工安全技术管理基本要求是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":22},"加强通风、照明、防尘、降温和治理有害气体工作",{"key":24,"text":292,"correct":22},"特殊工种必须专业培训，考试合格后方可操作，并持证上岗",{"key":28,"text":294,"correct":22},"安全防护装置与用品，按规定进行定期检验、日常检查",{"key":31,"text":296,"correct":26},"量测监控数值超过规定值，应立即采取措施",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":28,"analysis":33},1149076,"施工机械、运输车辆距竖井边缘的距离，应根据土质、井深、支护情况和地面荷载经验算确定，且其最外着力点与井边距离不得小于（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":22},"1.0m",{"key":24,"text":304,"correct":22},"1.2m",{"key":28,"text":306,"correct":26},"1.5m",{"key":31,"text":308,"correct":22},"1.8m",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1149077,"施工竖井不得设在低洼处，井口应比周围地面高（ ）以上，地面排水系统应完好、畅通。",[313,315,317,319],{"key":20,"text":314,"correct":22},"0.2m",{"key":24,"text":316,"correct":26},"0.3m",{"key":28,"text":318,"correct":22},"0.4m",{"key":31,"text":320,"correct":22},"0.5m",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1149078,"施工竖井井口（ ）范围内不得堆放材料。",[325,326,327,329],{"key":20,"text":302,"correct":22},{"key":24,"text":306,"correct":22},{"key":28,"text":328,"correct":26},"2.0m",{"key":31,"text":330,"correct":22},"2.5m",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":24,"analysis":33},1149079,"以下关于竖井土方开挖安全控制要点说法错误的是（ ）。",[335,337,339,341],{"key":20,"text":336,"correct":22},"竖井临近各类管线、建（构）筑物时，应对管线、建（构）筑物采取加固措施",{"key":24,"text":338,"correct":26},"采用先开挖后支护方式时，随开挖随支护，随支护随开挖，均衡施工",{"key":28,"text":340,"correct":22},"吊装出土时，土方容器下降落稳后，施工人员方可靠近作业",{"key":31,"text":342,"correct":22},"发现坍塌征兆时，必须停止作业，施工人员撤至安全地带",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":28,"analysis":33},1149080,"隧道工程，两条平行隧道相距小于1倍洞跨时，其开挖面前后错开距离不得小于（ ）m。",[347,349,351,352],{"key":20,"text":348,"correct":22},"10",{"key":24,"text":350,"correct":22},"12",{"key":28,"text":41,"correct":26},{"key":31,"text":353,"correct":22},"18",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":24,"analysis":33},1149081,"竖井提升钢丝绳必须有生产企业的产品合格证，并经试验确认合格后方可使用。库存超过（ ）年的钢丝绳，使用前应进行检验，确认合格并形成文件后方可使用。",[358,360,362,364],{"key":20,"text":359,"correct":22},"0.5",{"key":24,"text":361,"correct":26},"1",{"key":28,"text":363,"correct":22},"1.5",{"key":31,"text":365,"correct":22},"2",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},1149082,"下列有关超前导管与管棚说法错误的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"围岩自稳时间小于支护完成时间的地段，应根据地质条件、开挖方式、进度要求、使用机械情况，对围岩采取锚杆或小导管超前支护、小导管周边注浆等安全技术措施",{"key":24,"text":373,"correct":22},"当围岩整体稳定难以控制或上部有特殊要求可采用管棚支护",{"key":28,"text":375,"correct":26},"管棚支护效果好于小导管",{"key":31,"text":377,"correct":22},"钻孔中遇到障碍，必须停止钻进作业，待采取措施，并确认安全后，方可继续钻进，严禁强行钻进",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},1149083,"在城市进行爆破施工，必须事先编制爆破方案，报城市主管部门批准，并经（ ）同意后方可施工。",[382,384,386,388],{"key":20,"text":383,"correct":22},"建设主管部门",{"key":24,"text":385,"correct":26},"公安部门",{"key":28,"text":387,"correct":22},"交通主管部门",{"key":31,"text":63,"correct":22},{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":24,"analysis":33},1149084,"同一暗挖隧道相对开挖（非爆破方法）的两开挖面距离为（ ）倍洞跨且不小于10m时，一端应停止掘进，并保持开挖面稳定。",[393,394,396,398],{"key":20,"text":363,"correct":22},{"key":24,"text":395,"correct":26},"2.0",{"key":28,"text":397,"correct":22},"2.5",{"key":31,"text":399,"correct":22},"3.0",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},1149085,"两条平行暗挖隧道相距小于1倍洞跨时，其开挖面前后错开距离不得小于（ ）。",[404,406,408,410],{"key":20,"text":405,"correct":22},"10m",{"key":24,"text":407,"correct":26},"15m",{"key":28,"text":409,"correct":22},"20m",{"key":31,"text":411,"correct":22},"25m",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":28,"analysis":33},1149086,"隧道内应加强通风，在有瓦斯的隧道内进行爆破作业必须遵守现行（ ）的有关规定。",[416,418,420,422],{"key":20,"text":417,"correct":22},"地下铁道工程施工及验收规范",{"key":24,"text":419,"correct":22},"公路桥涵施工技术规范",{"key":28,"text":421,"correct":26},"煤矿安全规程",{"key":31,"text":423,"correct":22},"城镇燃气输配工程施工及验收规范",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":28,"analysis":33},1149087,"确认洞口土体加固效果从稳定性和（ ）两个方面进行。",[428,429,430,432],{"key":20,"text":134,"correct":22},{"key":24,"text":136,"correct":22},{"key":28,"text":431,"correct":26},"透水性",{"key":31,"text":433,"correct":22},"密实度",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},1149088,"喷锚暗挖法二次衬砌施工最佳时机是（ ）。",[438,440,442,444],{"key":20,"text":439,"correct":26},"初期支护变形稳定",{"key":24,"text":441,"correct":22},"地层变形稳定",{"key":28,"text":443,"correct":22},"隧道贯通",{"key":31,"text":445,"correct":22},"防水层施工完成",{"id":447,"libraryId":5,"type":15,"typeLabel":16,"stem":448,"options":449,"answer":28,"analysis":33},1149089,"关于市政工程项目职业健康安全管理体系，说法错误的是（ ）。",[450,452,454,456],{"key":20,"text":451,"correct":22},"职业健康安全管理体系是企业总的管理体系的重要组成部分",{"key":24,"text":453,"correct":22},"市政工程项目职业健康安全管理可改变不安全、不卫生的工作环境和条件，降低伤亡事故",{"key":28,"text":455,"correct":26},"市政工程施工现场条件复杂、人员流动性大，职业健康安全管理体系不适用",{"key":31,"text":457,"correct":22},"职业健康安全管理是运用现代科学的管理知识、方法，达到安全生产的目标",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":31,"analysis":33},1149090,"职业健康安全风险控制措施计划作为技术组织措施，主要内容包括职业健康安全技术措施、工业卫生技术措施、辅助房屋及设施和（ ）。",[462,464,466,468],{"key":20,"text":463,"correct":22},"劳动保护用品",{"key":24,"text":465,"correct":22},"防护设施",{"key":28,"text":467,"correct":22},"施工技术措施",{"key":31,"text":469,"correct":26},"安全宣传教育设施",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":28,"analysis":33},1149091,"工程建设要通过环境评估，其中市政公用工程主要涉及城市（ ）保护问题。",[474,476,478,480],{"key":20,"text":475,"correct":22},"噪声和振动",{"key":24,"text":477,"correct":22},"水资源和生态",{"key":28,"text":479,"correct":26},"自然环境和水环境",{"key":31,"text":481,"correct":22},"噪声和大气污染",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":20,"analysis":33},1149092,"在所有管理因素中，（ ）是环境管理体系的基础。",[486,488,490,492],{"key":20,"text":487,"correct":26},"环境因素的识别",{"key":24,"text":489,"correct":22},"环境管理措施",{"key":28,"text":491,"correct":22},"环境管理策划",{"key":31,"text":493,"correct":22},"环境因素评价",{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":28,"analysis":33},1149093,"出现环境事故时，项目部应立即消除污染，制定措施，防止出现（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"伤亡事故",{"key":24,"text":501,"correct":22},"环境污染",{"key":28,"text":503,"correct":26},"二次污染",{"key":31,"text":505,"correct":22},"安全事故",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":20,"analysis":33},1149094,"关于企业环境管理体系说法错误的是（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":26},"企业环境管理体系重在对环境因素管理方案和运行控制",{"key":24,"text":513,"correct":22},"对污染预防、资源能源节约措施的效果以及重大环境因素控制结果等环境绩效进行监测评价",{"key":28,"text":515,"correct":22},"对运行控制、目标指标、环境管理方案的实现程度进行监测",{"key":31,"text":517,"correct":22},"通过环境管理体系审核和管理评审等手段，促进管理水平持续改进",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":31,"analysis":33},1149095,"对于项目部环境管理，下面哪项不是项目部必须要做的工作（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":22},"应进行现场节能管理，有条件时应规定能源使用指标",{"key":24,"text":525,"correct":22},"应保存有关环境管理的工作记录，并按体系要求归档",{"key":28,"text":527,"correct":22},"应对环境因素进行控制，制定应急措施，并保证信息通畅，预防可能出现非预期的损害",{"key":31,"text":529,"correct":26},"应通过环境管理体系审核和管理评审等手段，对施工项目存在的和潜在的不符合项采取纠正和预防措施",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":24,"analysis":33},1149096,"关于职业健康安全管理体系建立，说法错误的是（ ）。",[534,536,538,540],{"key":20,"text":535,"correct":22},"企业指导项目建立、实施并保持职业健康安全管理体系，并负责监督管理",{"key":24,"text":537,"correct":26},"项目职业健康安全管理体系由建设单位组织建立，适用于项目全过程的管控",{"key":28,"text":539,"correct":22},"分包单位结合分包工程的特点，制定相应的项目职业健康安全保证计划",{"key":31,"text":541,"correct":22},"分包单位接受总承包单位职业健康安全管理体系的管理",{"id":543,"libraryId":5,"type":15,"typeLabel":16,"stem":544,"options":545,"answer":24,"analysis":33},1149097,"下列有关劳动保护用品说法错误的是（ ）。",[546,548,550,552],{"key":20,"text":547,"correct":22},"所采购的劳动保护用品必须有相关证件和资料，确保合格",{"key":24,"text":549,"correct":26},"只要资料齐全，可不必对劳保用品安全性能进行抽样检测和试验",{"key":28,"text":551,"correct":22},"二次使用的劳动保护用品应按照其相关标准进行检测试验",{"key":31,"text":553,"correct":22},"劳动保护用品的采购、保管、发放和报废管理，必须严格执行标准和质量要求",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":24,"analysis":33},1149098,"一般项目的质量应经抽样检验合格；当采用计数检验时，除有专门要求外，一般项目的合格点率应达到（ ）及以上，且不合格点的最大偏差值不得大于规定允许偏差值的（ ）倍。",[558,560,562,564],{"key":20,"text":559,"correct":22},"70％,1.0",{"key":24,"text":561,"correct":26},"80％,1.5",{"key":28,"text":563,"correct":22},"70％,1.5",{"key":31,"text":565,"correct":22},"80％,1.0",{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":31,"analysis":33},1149099,"参加单位工程验收的项目负责人人员应具备工程建设相关专业的中级以上技术职称并具有（ ）年以上从事工程建设相关专业的工作经历，参加单位工程验收的签字人员应为各方项目负责人。",[570,571,573,575],{"key":20,"text":365,"correct":22},{"key":24,"text":572,"correct":22},"3",{"key":28,"text":574,"correct":22},"4",{"key":31,"text":576,"correct":26},"5",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},1149100,"关于分部工程、单位工程验收程序，以下说法错误的是（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":26},"分部工程应由施工单位项目经理组织监理单位、项目技术、质量负责人等进行验收；勘察、设计单位参加地基与基础、主体结构分部工程的验收",{"key":24,"text":584,"correct":22},"单位工程完工后，在施工单位自检合格基础上，应由总监理工程师组织专业监理工程师对工程质量进行竣工预验收",{"key":28,"text":586,"correct":22},"预验收合格后，由施工单位单位向建设单位提交工程竣工报告，申请工程竣工验收",{"key":31,"text":588,"correct":22},"建设单位收到工程竣工验收报告后，其（项目）负责人组织施工、设计、勘察、监理等单位进行单位工程验收",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},1149101,"经返修或加固处理的分项分部工程，虽然改变外形尺寸但仍能满足结构安全和（ ）要求，可按技术处理方案和协商文件进行验收。",[593,595,597,598],{"key":20,"text":594,"correct":26},"使用功能",{"key":24,"text":596,"correct":22},"节能",{"key":28,"text":53,"correct":22},{"key":31,"text":599,"correct":22},"其他标准",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":31,"analysis":33},1149102,"市政工程竣工验收前，建设单位应请（ ）对施工资料进行预验收。",[604,605,607,609],{"key":20,"text":65,"correct":22},{"key":24,"text":606,"correct":22},"工程质量监督机构",{"key":28,"text":608,"correct":22},"设计单位",{"key":31,"text":610,"correct":26},"城建档案管理机构",[612,615,618,621,624,627],{"id":15,"name":613,"category":7,"favorite":614},"领导干部任职前廉政法规知识测试题",92,{"id":616,"name":617,"category":7,"favorite":15},595,"建筑结构与设备",{"id":619,"name":620,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":622,"name":623,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":625,"name":626,"category":7,"favorite":8},534,"BIM工程师",{"id":628,"name":626,"category":7,"favorite":8},535]